Category
Maintenance
2,015 contracts tracked across 12 states.
Contracts
2,015
States covered
12
Vendors
8+
Top states for maintenance
Top vendors in maintenance
| Vendor | Contracts | Volume |
|---|---|---|
| TELEDYNE FLIR DEFENSE, LLC | 62 | $2.0M |
| VALLEY REGIONAL TRANSIT | 17 | $21.8M |
| VENTURA COUNTY TRANSPORTATION COMMSSION | 14 | $65.7M |
| METROPOLITAN TRANSPORTATION AUTHORITY | 14 | $2.6B |
| GOLD COAST TRANSIT DISTRICT | 12 | $36.9M |
| COLORADO DEPARTMENT OF TRANSPORTATION | 11 | $33.0M |
| COUNTY OF MIAMI-DADE | 11 | $5.1M |
| STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | 10 | $43.5M |
Recent maintenance contracts (40)
| Title | State | Vendor | Value | Solicitation |
|---|---|---|---|---|
| QVN ROOF REPAIR FOSSIL, OR | OR | KEO & ASSOCIATES INC | $190K | — |
| ELEVATOR MAINTENANCE AND REPAIR SERVICES, PORTLAND ATCT & ADMINISTRATIVE BUILDING, 7108 NE AIRPORT WAY, PORTLAND, OREGON 97218 | OR | DEEP REFLECTION, INC. | $45K | — |
| REPAIR GRAVEL ACCESS ROAD TO SOT VOR NEWPORT, TN | TN | BROCKWELL CONSTRUCTION CO, INC | $117K | — |
| REPAIR/REPLACE HVAC IN ERIE PA | PA | GROUND LEVEL SERVICES LLC | $240K | — |
| REPAIR MALSR FLASHER STATIONS ON RNWY 28L AT THE PITTSBURGH, PA INT'L AIRPORT IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. | PA | NAVCON, LLC | $232K | — |
| HAR VOR ROOF REPAIR | PA | SOURCE ONE CONSTRUCTION, LLC | $127K | — |
| AIRCRAFT N80/FF-15 IS GROUNDED AT KPVD WITH A FUEL LEAK. WE ARE REQUESTING IMMEDIATE ASSISTANCE TO TROUBLESHOOT AND REPAIR THE AIRCRAFT ASAP TO MINIMIZE DOWNTIME. | RI | WEST STAR AVIATION, LLC | $113K | — |
| THE PURPOSE OF THIS PURCHASE ORDER IS TO PURCHASE SOFTWARE AND RENEWAL MAINTENANCE SUPPORT FOR THE ATLASSIAN SUITE PRODUCTS. | DC | RIGHTSTAR INC | $237K | — |
| CRAWFORD AVENUE EMERGENCY SEWER REPAIR | IL | FH PASCHEN SN NIELSEN ASSOCIATES LLC | $66K | — |
| REPAIR THE SYI RCAG ACCESS ROAD IN BELL BUCKLE, TN. | TN | TOWER MRL, LLC | $167K | — |
| LRD RCAG; REPAIR AND UPDATE ELECTRICAL PANELS AND EARTH EQUIPMENT GROUNDING IN LAREDO, TX. | TX | GREATER SOUTHWEST CONSTRUCTORS INC | $72K | — |
| SARITA, TX & THREE RIVERS, TX - REPAIR QXB RCAG AT SARITA & THREE RIVERS, TX IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS. | TX | MCNEAL PROFESSIONAL SERVICES, INC. | $68K | — |
| REPAIR CHILLER SYSTEM AT D10 TRACON IN FORT WORTH, TX. | TX | CMP COMMERCIAL CONSTRUCTION INC | $60K | — |
| REPAIR DETERIORATED TILT DOWN POLE @BROWNSVILLE (BRO), TX DME. IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS. | TX | GREATER SOUTHWEST CONSTRUCTORS INC | $55K | — |
| REPAIR DETERIORATED CHILLED WATER PIPING AT ZHU, MECHANICAL ROOM 250 SECONDARY CHILLED WATER LOOP. | TX | RJY GROUP LLC | $38K | — |
| REPAIR HVAC SYSTEM AT THE AIR ROUTE TRAFFIC CONTROL CENTER IN HOUSTON, TX. | TX | HAR-CON MECHANICAL CONTRACTORS LLC | $21K | — |
| APPLICATION PURPOSE: PROVIDE FUNDING FOR CAPITAL PURCHASES THAT ARE CRITICAL TO THE SUCCESS OF PROVIDING TRANSIT SERVICE.; ACTIVITIES PERFORMED: PREVENTATIVE MAINTENANCE REHABILITATION/RENOVATION OF PRT STATIONS AND GUIDEWAYS; EXPECTED OUTCOMES: CONTINUE TO PROVIDE CLEAN SAFE AND RELIABLE TRANSPORTATION AND IMPROVE MOBILITY AND ACCESS THROUGHOUT WEST VIRGINIA UNIVERSITY AND MORGANTOWN WEST VIRGINIA.; INTENDED BENEFICIARIES: COMMUTERS EMPLOYEES; SUBRECIPIENT ACTIVITIES: NONE | WV | WEST VIRGINIA UNIVERSITY | $1.2M | — |
| BRENHAM, TX (BNH ASR) REPAIR SETTLING FOUNDATION + STRUCTURAL ANALYSIS | TX | SHELLBACK CONSTRUCTION LLC | $15K | — |
| RELAMINATE SURFACES&REPAIR CUBBIES IN ZME CHILDCARE FACILITY IN MEMPHIS, TN | TN | KEO & ASSOCIATES INC | $20K | — |
| ESTABLISH A CONSTRUCTION CONTRACT TO MAKE MINIMUM REPAIR TO EXISTING SHELTER AND INSTALL (5) 40' SELF SUPPORTING ANTENNA TOWERS IN WICHITA FALLS, TX. | TX | PANOPTIC SERVICES GROUP, LLC. | $872K | — |
| BNATCS PROJECT TO REPAIR DUC EXCAVATION AT THE FORT WORTH ARTCC | TX | CORE SUSTAINABILITY, LLC | $370K | — |
| REPAIR D10 TRACON ESSENTIAL CHILLED WATER BYPASS CIRCUIT | TX | CMP COMMERCIAL CONSTRUCTION INC | $264K | — |
| FURNISH EQUIP, LABOR, MATERIALS & TOOLS NEEDED FOR FACILITY ROOF REPAIR @ AUSTIN (AUS), TX RCAG.. IN ACCORDANCE WITH THE SOW, SPECIFICATIONS AND DRAWINGS | TX | SHECKLER CONTRACTING, INC. | $257K | — |
| REPAIR COLLAPSED SANITARY SEWER PIPE LOCATED BENEATH THE EAST DFW ATCT | TX | VERITAS CONSTRUCTION INC | $154K | — |
| ROCKSPRINGS, TX - RSG VOR - REPAIR/UPGRADE ELECTRICAL UPGRADE AND EARTH GROUNDING IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. | TX | WAM INDUSTRIES, INCORPORATED | $150K | — |
| REPAIR AND MODIFY THE DFW VOR ELEVATOR LOCATED AT DALLAS AIRPORT, TEXAS. | TX | DFW ELEVATOR REPAIR, LLC | $142K | — |
| QOM ARSR - CONTRACT TO REPAIR BUILDING, CORRECT WATER DAMAGE AND PREVENT WATER INTRUSION @ KING MOUNTAIN (QOM), TX ARSR | TX | COASTAL ECO CONSTRUCTION,INC. | — | — |
| REPAIR AND REPAINT MFE VOR INTERIOR AND EXTERIOR, LOCATED IN MCALLEN TX. | TX | KEO & ASSOCIATES INC | $100K | — |
| REPAIR WALRLRSS CAMERAS SN: 20256 AND SN: 20251 | CA | PVP ADVANCED EO SYSTEMS, INC. | $72K | — |
| SALT LAKE CITY, UT AIR ROUTE TRAFFIC CONTROL CENTER (ZLC) UNDERGROUND UTILITIES MODERNIZATION. SCOPE: MODERNIZE THE FACILITY TO REPLACE UNDERGROUND UTILITIES, RENOVATE THE PAVED SURFACE PARKING LOTS AND REPAIR CONCRETE AND GRASS AREAS. THE PROJEC | UT | E CORP | $5.5M | — |
| EO14042 AOG N89 REPAIR OF GPS UNIT | UT | DUNCAN AVIATION INC | $1.6M | — |
| CONTRACTOR WILL PROVIDE ALL MATERIALS, EQUIPMENT, AND LABOR TO REPAIR AND REPLACE PARTS ON A LMC 1500 SNOWCAT IN SALT LAKE CITY, UTAH | UT | PETERSON EQUIPMENT MANAGEMENT, LLC | $12K | — |
| REPAIR ELEVATOR DRIVE ASSEMBLY AT BTV ATCT IN BURLINGTON, VT | VT | OTIS ELEVATOR COMPANY | $27K | — |
| TEST EQUIPMENT REPAIR AND CALIBRATION SUPPORT SERVICES SUPPORT CONTRACT | VA | ARTI / BIONETICS LLC JOINT VENTURE 3 | $2.2M | — |
| MMAC LOGISTICS CENTER TEST EQUIPMENT REPAIR AND CALIBRATION SUPPORT SERVICES | VA | ARTI-BIONETICS JOINT VENTURE LLC | $1.6M | — |
| MMAC LOGISTICS CENTER TEST EQUIPMENT REPAIR AND CALIBRATION SUPPORT SERVICES | VA | ARTI-BIONETICS JOINT VENTURE LLC | $1.5M | — |
| MMAC LOGISTICS CENTER TEST EQUIPMENT REPAIR AND CALIBRATION SUPPORT SERVICES | VA | ARTI-BIONETICS JOINT VENTURE LLC | $1.4M | — |
| MMAC LOGISTICS CENTER TEST EQUIPMENT REPAIR AND CALIBRATION SUPPORT SERVICES | VA | ARTI-BIONETICS JOINT VENTURE LLC | $1.4M | — |
| THIS EFFORT IS TO CLEAR AND REPAIR CULVERTS, PLACE GRAVEL ON SIDES OF ASPHALT, AND PLACE NEW DELINEATOR POLES ON THE 1.8 MILES OF LAMBS KNOLL ROAD. | MD | GLOBAL ENVIRONMENTAL & REMEDIATION, LLC | $59K | — |
| 19004546 ZDC SSC REPLACE STAIR C ROOF AND REPAIR LEAK DAMAGE | VA | PUYENPA CONSTRUCTION, LLC | $127K | — |