Rail Bridge contracts

DOTContractAlert tracks 23 rail bridge contracts across 18 states, held by 22 vendors. Missouri has the most (4). The vendor with the most is DEPARTMENT OF TRANSPORTATION CONNECTICUT (2).

Contracts
23
States covered
18
Vendors
22

Rail Bridge contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionStateEnds
The Project Will Complete The Preliminary Engineering And Nepa Phase For The Pelham Bay Bridge Replacement Project Innew York City. The Proposed Bridge Will Improve Service Reliability And Increase Operating Speeds For Amtrak CustomersalongNew York rail (FRA federal awards)NY
The Project Will Eliminate A Major At-grade Crossing On The Bnsf Cherokee Subdivision ? A Vital Thoroughfare For National And Regional Freight Movement ? In Rural Monett, Missouri. IT Will Improve Highway Safety And Traffic Flows, DecreaseMissouri rail (FRA federal awards)MO
The Purpose Of This Award Is To Eliminate A Grade Crossing Through Constructing A Grade-separated Overpass Bridge. The Recipient Will Construct A Grade-separated Crossing And Widen The Road From Two Lanes To Four Lanes, Improve Sidewalks, RIndiana rail (FRA federal awards)IN
The Salmon Bay Bridge Rehabilitation Project Will Rehabilitate The Movable Span Of The Salmon Bay Bridge By Replacing The Counterweight, The Counterweight Truss, Six Of The Eight Bearings, And The Counterweight Links With Steel Members WitWashington rail (FRA federal awards)WA
The Project Will Identify A Preferred Location To Construct A Pedestrian Bridge Over The Floridaeast Coast Main Line Through The City Of West Palm Beach, Florida. Project Work Includesconceptual Engineering, Cost Estimating, Environmental SFlorida rail (FRA federal awards)FL
The Project Involves Partial Reconstruction Of Norfolk Southern S Grand River Bridge By Replacing The Main Channel Crossing With A Ballast-deck Steel Superstructure. The Project Will Increase The Hydraulic Opening Of The Bridge By RemovingMissouri rail (FRA federal awards)MO
The Project Funds Nepa, Preliminary Engineering, Final Design, And Construction Of The Interim Repairs That Will Allow The Devon Bridge To Remain In Service For Another 10 To 15 Years Until The Bridge Can Be Fully Replaced. The Interim RepaConnecticut rail (FRA federal awards)CT
The Kansas City Riverfront Rail Crossing Elimination Study Will Develop And Assess Potential Access And Alignment Alternatives For Three At Grade Crossings On Lydia Avenue And Two At Grade Crossings On 1ST Street. The Grant Will Fund NepaMissouri rail (FRA federal awards)MO
Real-time Rail Bridge Condition And Rating System DemonstrationPennsylvania rail (FRA federal awards)PA
The Project Consists Of Project Planning Activities And Includes Conceptual Design Of Alternatives. The Replacement Of The Saugatuck River Bridge Is Identified As A Priority Project In The Northeast Corridor (nec) Capital Investment Plan. TConnecticut rail (FRA federal awards)CT

Rail Bridge contracts by state

Vendors with the most rail bridge contracts

VendorContractsVolume
DEPARTMENT OF TRANSPORTATION CONNECTICUT2—