Alaska engineering contracts
DOTContractAlert tracks 106 engineering contracts across 2 Alaska DOT regions, held by 33 vendors. SENTINEL POWER SERVICES, LLC holds the most (21). Alaska aviation (FAA federal awards) has the most contracts in this category (91).
Contracts
106
DOT regions
2
Vendors
33
Alaska engineering contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Issue Funding For Site Survey, Design, And Installation Of Diesel Fst At Mcgrath, Ak (mcg) Shop Jcn: 18027167 | Alaska aviation (FAA federal awards) | |
| Application Purpose: To Comply With Federal Mandates That Require The Installation Of Locomotive Video And Audio Recording Systems.; Activities Performed: Acquisition And Installation Of Video And Audio Recording Systems In Locomotives.; Ex | Alaska transit (FTA federal awards) | |
| Site Survey Travel, Report And Design For Eg Po LED Power System Replacement Projects At Unalakleet, Ak (unka) Asti JCN:18032213 | Alaska aviation (FAA federal awards) | |
| Site Survey Travel, Report And Design Funding For Eg Po LED Power System Replacement Project At Kenai, Ak (enad) Nxrad JCN:18032204 | Alaska aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates The Airport Master Plan Narrative Report And Airport Layout Plan To Address Key Issues, Objectives And Goals Pertinent To The | Alaska aviation (FAA federal awards) | |
| Purpose: Update State/regional System Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates The 2020 Study Of The Alaska Airport System To Reevaluate ITS Air Transportation Needs. Intended Beneficiary: This Gra | Alaska aviation (FAA federal awards) | |
| Purpose: Conduct Or Update Miscellaneous Study. Activities To Be Performed/expected Outcomes: This Project Conducts A New Feasibility Study. . Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associated With Scam | Alaska aviation (FAA federal awards) | |
| Purpose: Improve Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Improves 1,750 Feet Of Erosion System Controls On The Northern Area Of The Airfield To Meet Federal Aviation Administration Desig | Alaska aviation (FAA federal awards) | |
| Purpose: Rehabilitate Airport Beacon; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Airport's Existing Rotating Beacon To Meet Federal Aviation Administration Design Standards. | Alaska aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates The Airport Master Plan Narrative Report And Airport Layout Plan To Address Key Issues, Objectives And Goals Pertinent To The | Alaska aviation (FAA federal awards) | |
| Application Purpose: The Purpose Is To Conduct A Statewide Public Transit Barrier Assessment With An Equity Focus. This Effort Will Identify Evaluate And Create A Prioritized List Of Capital Projects With The Aim To Remove Barriers To Equit | Alaska transit (FTA federal awards) | |
| Application Purpose: To Improve Existing Ketchikan Facility And Acquire And Improve Additional Adjacent Property To Support Transit Operations In Ketchikan.; Activities Performed: Acquisition Of Real Property Design Of Existing And New Prop | Alaska transit (FTA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates The Airport Master Plan Narrative Report And Airport Layout Plan To Address Key Issues, Objectives And Goals Pertinent To The | Alaska aviation (FAA federal awards) | |
| Purpose: Develop Noise Compatibility Plan. Activities To Be Performed/expected Outcomes: This Project Conducts A Study Of Airport Noise Exposure At The Airport And Surrounding Areas To Identify Incompatible Land Uses. Intended Beneficiar | Alaska aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associated With Kin | Alaska aviation (FAA federal awards) | |
| Provide Recommendations On Development Of New Regulatory And Guidance Materials Related To Uas Control Station Design And Ergonomics. | Alaska aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study/airport Layout Plan With Master Plan Narrative. Intended Beneficiary: This Grant Will Provide F | Alaska aviation (FAA federal awards) | |
| Purpose: Develop New Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Develops An Airport Master Plan Study For Merrill Field Airport. Intended Beneficiary: This Grant Will Provide Federal Funding For Airpor | Alaska aviation (FAA federal awards) | |
| Juneau Fsdo Phase 1 (site Survey/design) | Alaska aviation (FAA federal awards) | |
| Juneau Atct Phase 1 (site Survey/design) | Alaska aviation (FAA federal awards) | |
| Anchorage Atct (anc) Phase 1 (site Survey/design) | Alaska aviation (FAA federal awards) | |
| Arctic Central Ssc Phase 1 (site Survey/design) | Alaska aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study And Airport Layout Plan. Intended Beneficiary: This Grant Will Provide Federal Funding For Airp | Alaska aviation (FAA federal awards) | |
| Purpose: Conduct State/regional System Study. Activities To Be Performed/expected Outcomes: This Project Conducts A New Region Airport Economic Impact Study. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Assoc | Alaska aviation (FAA federal awards) | |
| Purpose: Develop New Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Develops An Airport Master Plan Study For A New Airport. This Grant Funds A Portion Of The Total Project. This Grant Is Associated With An | Alaska aviation (FAA federal awards) |
DOT regions with the most engineering contracts
Vendors with the most Alaska engineering contracts
| Vendor | Contracts | Volume |
|---|---|---|
| SENTINEL POWER SERVICES, LLC | 21 | $14.0M |
| ALASKA DEPARTMENT OF TRANSPORTATION & PUBLIC FACILITIES | 14 | $61.0M |
| M. C. DEAN, INC. | 13 | $2.4M |
| URBAN ELECTRIC, INC | 6 | $1.1M |
| AK STATE DEPARTMENT OF PUBLIC TRANSPORTATION | 4 | $301.9M |
| ANCHORAGE, MUNICIPALITY OF (INC) | 4 | $4.0M |
| WELLS GLOBAL, LLC | 4 | $1.1M |
| CUSA CONSULTING LLC | 4 | $735K |
| CHICKASAW STRATEGIC POINTE, LLC | 4 | $464K |
| ALASKA RAILROAD CORPORATION | 3 | $15.6M |