Arkansas engineering contracts

DOTContractAlert tracks 25 engineering contracts across 1 Arkansas DOT region, held by 17 vendors. CHICKASAW STRATEGIC POINTE, LLC holds the most (4).

Contracts
25
DOT regions
1
Vendors
17

Arkansas engineering contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
Purpose: Expand Access Road. Activities To Be Performed/expected Outcomes: This Project Expands The Airport's Existing Access Road An Additional 1,700 Feet To Enhance Access To The Airport. This Grant Funds The Design Phase. Intended BeneArkansas aviation (FAA federal awards)
Purpose: Improve/modify Access Road. Activities To Be Performed/expected Outcomes: This Project Changes The Layout To The Existing Airport Entrance Road To Improve Traffic Flow To Efficiently Move Passengers To And From The Airport. This GArkansas aviation (FAA federal awards)
Purpose: Construct New Airport. Activities To Be Performed/expected Outcomes: This Project Constructs A New Airport To Meet Current Aviation Demand. This Grant Funds The Design Phase Of The Construction Of A 360,000 Gallons Water Storage FArkansas aviation (FAA federal awards)
Purpose: Conduct Noise Compatibility Plan Study. Activities To Be Performed/expected Outcomes: This Project Conducts A Part 150 Noise Compatibility Plan Study. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports AssArkansas aviation (FAA federal awards)
Purpose: Improve Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Improves 1.300 Feet Of The Airport's Existing Drainage System To Eliminate Ponding On Airfield Surfaces To Meet Federal AviationArkansas aviation (FAA federal awards)
Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 950 Foot Taxilane To Connect An Existing Taxilane To A New Hangar Area In The Non-movement Area. This Grant Funds The Design Phase. IntenArkansas aviation (FAA federal awards)
Purpose: Improve Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Improves 2,801 Feet Of The Airport's Existing Channel Drainage System To Eliminate Ponding On Airfield Surfaces To Meet FederalArkansas aviation (FAA federal awards)
Purpose: Acquire Land For Development; Conduct/update Miscellaneous Study. Activities To Be Performed/expected Outcomes: This Project Acquires 8.81 Acres Of Land For Future Eligible Development. This Project Conducts A New Narrative ReporArkansas aviation (FAA federal awards)
Purpose: Construct New Airport. Activities To Be Performed/expected Outcomes: This Project Constructs A New Basic Airport That Meets Current Federal Aviation Administration Design Standards. This Grant Funds Phase 2, Which Consists Of ConsArkansas aviation (FAA federal awards)
Purpose: Construct/expand Snow Removal Equipment Building. Activities To Be Performed/expected Outcomes: This Project Constructs A New 12,000 Square Foot Snow Removal Equipment And Sand Storage Building To Bring The Airport Into ConformityArkansas aviation (FAA federal awards)
Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A New 2,700-FOOT Westside Taxilane To Provide Airfield Access To A Non-exclusive Hangar Development Area To Bring The Airport Into ConformitArkansas aviation (FAA federal awards)
Purpose: Extend/expand Taxilane. Activities To Be Performed/expected Outcomes: This Project Extends Existing North Hangar Taxilane An Additional 1,100 Feet In Length To Provide Airfield Access To A Non-exclusive Hangar Development Area ToArkansas aviation (FAA federal awards)
Purpose: Construct/expand Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New 5,000 Square Foot Sponsor-owned T-hangar For Aircraft Storage To Assist The Airport To Be As Self-sustaining As Possible By GenerArkansas aviation (FAA federal awards)
Purpose: Construct Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Constructs New Drainage Pipe To Address Drainage Issues, To Bring The Airport Into Conformity With Current Standards. This GranArkansas aviation (FAA federal awards)

DOT regions with the most engineering contracts

Vendors with the most Arkansas engineering contracts

VendorContractsVolume
CHICKASAW STRATEGIC POINTE, LLC4$1.7M
CITY OF ROGERS2—
DELTA REGIONAL AIRPORT AUTHORITY2—
FORT SMITH REGIONAL AIRPORT2—
CITY OF HOPE2—
CITY OF BRINKLEY2—