Arizona airfield contracts

DOTContractAlert tracks 152 airfield contracts across 1 Arizona DOT region, held by 42 vendors. CITY OF PHOENIX-AVIATION DEPARTMENT holds the most (15).

Contracts
152
DOT regions
1
Vendors
42

Arizona airfield contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
Purpose: Rehabilitate Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Existing Runway 12/30 Lighting System That Has Reached The End Of ITS Useful Life And Requires Rehabilitation To Enhance SaArizona aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway Lighting. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Existing Taxiway A Lighting System To Extend ITS Useful Life And Enhance Safe Airfield Operations During Low Visibility COArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron Lighting; Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Westside Apron Lighting That Has Reached The End Of ITS Useful Life. . This Project RehabilitaArizona aviation (FAA federal awards)
Purpose: Extend Taxiway. Activities To Be Performed/expected Outcomes: This Project Extends Taxiway A An Additional 5,450 Feet To Meet The Operational Needs Of The Airport. This Grant Funds The Second Phase, Which Consists Of ConstructionArizona aviation (FAA federal awards)
Purpose: Construct/extend/improve Safety Area. Activities To Be Performed/expected Outcomes: This Project Improves The Runway 15/33 Safety Area To Enhance The Safety Of Operations At The Airport. . The Federal Aviation Administration WorkeArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 90,000 Square Yards Of The Existing West Cargo Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds 59% Of The TotaArizona aviation (FAA federal awards)
Purpose: Conduct Or Update Miscellaneous Study. Activities To Be Performed/expected Outcomes: This Project Conducts A Feasibility Study For A Crosswind Runway. . Intended Beneficiary: This Grant Will Provide Federal Funding For AirportsArizona aviation (FAA federal awards)
Purpose: Reconstruct Access Road; Reconstruct Taxiway; Reconstruct Runway; Airport Miscellaneous Improvements; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs Blast Pads Improvements To The AirportArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 90,000 Square Yards Of The Existing West Cargo Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds 41% Of The TotaArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 19,000 Square Yards Of The Existing South Apron Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant WilArizona aviation (FAA federal awards)
Purpose: Construct Taxiway; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 710 Foot Taxiway B1 To Allow A Higher Service Volume Of Aircraft. This Project Reconstructs 255 Feet Of The ExistiArizona aviation (FAA federal awards)
Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 6,430 Feet Of The Existing Runway 17/35 Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Design Phase. IntendedArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 15,500 Square Yards Of The Existing Apron 1 Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant Will PrArizona aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts And Reconstructs Runway 11R/29L From ITS Current Airfield Location To 800 Feet Centerline Separation From Runway 11L/29R. ThisArizona aviation (FAA federal awards)
Purpose: Install Taxiway Lighting. Activities To Be Performed/expected Outcomes: This Project Installs New Taxiway A, A1, A2, A4, A5 And A6 Lighting System To Enhance Safe Airfield Operations During Low Visibility Conditions. This Grant FuArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 10,000 Square Yards Of The Existing Terminal Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Design Phase.Arizona aviation (FAA federal awards)
Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 5,820 Feet Of The Existing Runway 18/36 Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Design Phase. IntendedArizona aviation (FAA federal awards)
Purpose: Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs New Runway 03/21 Precision Approach Path Indicator(s) To Make The Airport More Accessible By Improving ApproachesArizona aviation (FAA federal awards)
Purpose: Conduct Or Update Miscellaneous Study. Activities To Be Performed/expected Outcomes: This Project Conducts A New Obstruction Survey To Identify Obstructions To The Existing Runway Approaches. Intended Beneficiary: This Grant WillArizona aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts And Reconstructs Runway 11R/29L From ITS Current Airfield Location To 800 Feet Centerline Separation From Runway 11L/29R. . ThArizona aviation (FAA federal awards)
Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 5,700 Feet Of Existing Paved Runway 12C/30C To Maintain The Structural Integrity And Minimize Foreign Object Debris To Extend ITS UsefulArizona aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 1,900 Feet Of The Existing Taxiway J Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant Will ProvideArizona aviation (FAA federal awards)
Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 2,100 Foot Taxiway U To Accommodate More Aircraft Operations. . This Grant Funds Phase 2, Which Consists Of Site Preparation And DemoliArizona aviation (FAA federal awards)
Purpose: Reconstruct Taxiway Signage. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Taxiway A Signage That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant Will Provide FederaArizona aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 23,000 Square Yards Of The Existing Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds Phase 2, Which Consists OfArizona aviation (FAA federal awards)

DOT regions with the most airfield contracts

Vendors with the most Arizona airfield contracts

VendorContractsVolume
CITY OF PHOENIX-AVIATION DEPARTMENT15$260.8M
TUCSON AIRPORT AUTHORITY INC10$184.7M
MESA GATEWAY AIRPORT AUTHORITY9$65.5M
CITY OF PRESCOTT8$16.3M
MESA CITY OF6$8.5M
CITY OF SCOTTSDALE6$7.4M
DEPARTMENT OF TRANSPORTATION ARIZONA5$13.8M
CITY OF PAGE5$4.4M
CITY OF COOLIDGE5$2.8M
CITY OF SAFFORD5$999K