California its signals contracts
21 contracts tracked across 6 DOT regions.
Contracts
21
DOT regions
6
Distinct vendors
0
DOT regions with the most its signals contracts
Recent its signals contracts in California
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| Rte 259 — ITS/TMS — Operational Improvements | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 12 — Upgrade curb ramps, sidewak, driveways, acccessible pedestrian signal & push buttons to current ADA standards — ADA Pedestrian Infrastructure | Caltrans District 10 | — | — | 2022-01-01 |
| Rte 99 — Install & implement ITS elements in Chico area: Detection, CCTV, VDS between Southgate at JNO Eaton Road — Improve traveler information and data collection | Caltrans District 3 | — | — | 2021-01-01 |
| Rte 5 — Integrated Corridor Management along Routes 5, 57, and??¿ 91 to include additional ITS elements, striping, overhead signs, and miscellaneous roadway improvements.??¿ Project proposes to efficiently manage??¿traffic flow during planned and unplanned event — Transportation Management System Improvements | Caltrans District 12 | — | — | 2021-01-01 |
| Rte 91 — Integrated Corridor Management along Routes 5, 57, and??¿ 91 to include additional ITS elements, striping, overhead signs, and miscellaneous roadway improvements.??¿ Project proposes to efficiently manage??¿traffic flow during planned and unplanned event — Transportation Management System Improvements | Caltrans District 12 | — | — | 2021-01-01 |
| Rte 50 — Install new ITS systems Phase 2 — Install new ITS systems Phase 2 | Caltrans District 3 | — | — | 2021-01-01 |
| Rte 91 — Integrated Corridor Management along Routes 5, 57, and??¿ 91 to include additional ITS elements, striping, overhead signs, and miscellaneous roadway improvements.??¿ Project proposes to efficiently manage??¿traffic flow during planned and unplanned event — Transportation Management System Improvements | Caltrans District 12 | — | — | 2021-01-01 |
| Rte 50 — Install new ITS systems Phase 2 — Install new ITS systems Phase 2 | Caltrans District 3 | — | — | 2021-01-01 |
| Rte 50 — ICM Project. Includes SHOPP ID 18166 — Improve safety and reliablity of the US 50 Corridor, enhance TSM, reduce dailiy vehicle hours of delay, improve incident response, maintain ITS element health, reduce primary and secondary collisons, coordinate traveler information, improve roadside safe | Caltrans District 3 | — | — | 2020-01-01 |
| Rte 57 — Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. Route 57 between SR-22 and Orangethorpe Ave to include ITS elements only. — Transportation Management System Improvements | Caltrans District 12 | — | — | 2020-01-01 |
| Rte 5 — Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. I-5 Corridor N. Main Street and Beach Blvd to include only ITS elements. — Transportation Management System Improvements | Caltrans District 12 | — | — | 2020-01-01 |
| Rte 91 — Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. Route 91 between Beach Blvd and Kraemer/Glassell to include??¿ ITS elements only. — Transportation Management System Improvements | Caltrans District 12 | — | — | 2020-01-01 |
| Rte 91 — Project proposes to efficiently manage traffic flow during planned and unplanned events in coordination with OCTA and the cities of Anaheim and Orange. Route 91 between Beach Blvd and Kraemer/Glassell to include??¿ ITS elements only. — Transportation Management System Improvements | Caltrans District 12 | — | — | 2020-01-01 |
| Rte 50 — ICM Project. Includes SHOPP ID 18166 — Improve safety and reliablity of the US 50 Corridor, enhance TSM, reduce dailiy vehicle hours of delay, improve incident response, maintain ITS element health, reduce primary and secondary collisons, coordinate traveler information, improve roadside safe | Caltrans District 3 | — | — | 2020-01-01 |
| Rte 80 — ICM Project. Includes SHOPP ID 18166 — Improve safety and reliablity of the US 50 Corridor, enhance TSM, reduce dailiy vehicle hours of delay, improve incident response, maintain ITS element health, reduce primary and secondary collisons, coordinate traveler information, improve roadside safe | Caltrans District 3 | — | — | 2020-01-01 |
| Rte 210 — To install Type 60G concrete barrier along center divider separating the freeway from the light rail — Safety Improvement | Caltrans District 7 | — | — | 2020-01-01 |
| Rte 62 — INSTALL TRAFFIC SIGNAL — Safety Improvement | Caltrans District 8 | — | — | 2019-01-01 |
| Rte 126 — New Traffic signal, construction of a new south leg, widen to provide left and right turn lane. — Intersection Improvements | Caltrans District 7 | — | — | — |
| Rte 101 — Bus & pedestrian bulb outs at six intersections with landscaping at bus bulbs. Realign existing curbs at three intersections. Daylighting, advanced stop bars, continental crosswalks and signal timing modifications at all intersections — Transit and pedestrian safety | Caltrans District 4 | — | — | — |
| Rte 1 — Re-align the Muni M-Ocean View light-rail from the median to the west side of Highway 1 by taking it under 19th Avenue in the northern part of the corridor near Stonestown Galleria and SF State, and over Junipero Serra near Font/Randolph. The entire len — Improve transit performance and access. Increase pedestrian and bicyclist comfort and safety. Support planned and potential transit-oriented development. | Caltrans District 4 | — | — | — |
| Rte 99 — Upgrade traffic signal control and communications equipment, supplement additional detection, and connect via fiber optic, cable, add video detection and CCTV cameras, upgrade ADA, and incorporate transit vehicle priority and adaptive signal control tech — Upgrade 39 traffic signals | Caltrans District 3 | — | — | — |