California pavement contracts
79 contracts tracked across 10 DOT regions.
Contracts
79
DOT regions
10
Distinct vendors
0
DOT regions with the most pavement contracts
Recent pavement contracts in California
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| Rte 119 — Pavement Rehabilitation (3R) — Pavement Rehab (3R) | Caltrans District 6 | — | — | 2025-01-01 |
| Rte 184 — Pavement Rehabilitation (3R) — Pavement Reconstruction | Caltrans District 6 | — | — | 2023-01-01 |
| Rte 5 — In Siskiyou County from 0.1 mile North of Mott Avenue Under Crossing to 0.03 mile South of Black Butte Over Head. — Pavement Rehab | Caltrans District 2 | — | — | 2023-01-01 |
| Rte 84 — Pavement preservation (CAPM) — Capital preventive maintenance | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 68 — Restore Pavement Surface — Pavement Preservation | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 125 — Pavement Rehabilitation — Pavement Rehabilitation | Caltrans District 11 | — | — | 2022-01-01 |
| Rte 299 — In Shasta County at and near Burney from 2.6 miles East of Carberry Flat Road to 0.3 mile East of Burney Mountain Power Road — Maintain Pavement and Roadway Facilities | Caltrans District 2 | — | — | 2022-01-01 |
| Rte 84 — Pavement preservation (CAPM) from Route 280 to Route 101 — Capital preventive maintenance | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 880 — Pavement preservation (CAPM) — Capital preventive maintenance | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 1 — Restore Pavement Surface — Pavement Preservation | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 2 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 1 — Restore Pavement Surface — Pavement Preservation | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 101 — Rehabilitate Pavement (2R) — Pavement Rehabilitation | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 1 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 605 — Lane Replacement — Resurfacing and Restoration of distressed PCC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 10 — REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS — Roadway Rehab | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 74 — PILOT: MILL AND OVERLAY PAVEMENT AND INCLUDE DIGOUTS, ITS and Complete Streets Elements — Roadway Rehab | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 111 — Mill and Overlay — on State Route 111 | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 1 — Rehabilitate Culverts from Mill Gulch to 0.5 mile south of Miller Creek — Drainage System Restoration | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 82 — Pavement preservation (CAPM) Route 237 to San Mateo County Line — Capital preventive maintenance | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 185 — Pavement preservation (CAPM) from A Street to Garcia Avenue — Roadway rehabilitation | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 37 — Pavement preservation (CAPM) — Capital preventive maintenance | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 135 — Restore Pavement Surface — Pavement Preservation | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 184 — CAPM — Overlay (2R) | Caltrans District 6 | — | — | 2022-01-01 |
| Rte 66 — Mill and Overlay — On State Route 66 | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 54 — Pavement Rehabilitation — Pavement Rehabilitation | Caltrans District 11 | — | — | 2022-01-01 |
| Rte 1 — Cold plane 0.20 ft of existing AC and replace with rubberized AC Type G. Upgrade exisitng curb ramps to current ADA standards. In Laguna Beach and Newport Beach, from 0.19 mile south of Vista Del Sol to Newport Coast Drive — Pavement Preservation | Caltrans District 12 | — | — | 2022-01-01 |
| Rte 65 — Overlay pavement, add shoulder backing, construct rumble strip, widen shoulder south of town, construct sidewalk at northeast corner of SR 65 and First Street, and reconstruct 18 pedestrian ramps to meet ADA standards on Rte 65 in Wheatland from 0.2 mile — Extend service life of existing pavement to address pavement distress and ride quality; address non-compliant ADA pedestrian ramps, provide shoulder backing along southern end of project, address ADA standards not met with previous projects and at the n | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 101 — Rehabilitate Roadway (2R) — Pavement Preservation | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 1 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 1 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 27 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 27 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 605 — Slab replacements and shoulder resurfacing — Resurfacing of distressed PCC pavement | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 10 — REHABILITATE MAINLINE PAVEMENT, SHOULDERS AND RAMPS — Roadway Rehab | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 74 — MILL AND OVERLAY PAVEMENT AND INCLUDE DIGOUTS — Roadway Rehab | Caltrans District 8 | — | — | 2022-01-01 |
| Rte 8 — Lane Replacement - Pavement Rehabilitation - 2R — Lane Replacement - Pavement Rehabilitation - 2R | Caltrans District 11 | — | — | 2022-01-01 |
| Rte 90 — Remove and replace AC pavement In Fullerton, Brea, from Harbor Boulevard to State College Boulevard — Pavement Preservation | Caltrans District 12 | — | — | 2022-01-01 |
| Rte 14 — Mojave Rosamond Rehab — Pavement Overlay | Caltrans District 9 | — | — | 2021-01-01 |
| Rte 168 — CAPM — Pavement Overlay | Caltrans District 6 | — | — | 2021-01-01 |
| Rte 101 — Conejo: NB & SB Slab replacement/grind all conc. lanes, grind & pave all asphalt pavement and replace recessed markers. Provide truck counters and replace existing changeable message signs — Weigh Stations & WIM Facilities | Caltrans District 7 | — | — | 2021-01-01 |
| Rte 150 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2021-01-01 |
| Rte 405 — Install ground-in rumble strips and pavement delineation — Reduce severity collisions | Caltrans District 7 | — | — | 2021-01-01 |
| Rte 5 — Overlay (2R) — Distressed Lane Miles | Caltrans District 6 | — | — | 2021-01-01 |
| Rte 99 — Pavement Rehabilitation (3R) — Pavement Reha R/R Ln # 3 CRCP | Caltrans District 6 | — | — | 2021-01-01 |
| Rte 18 — GRIND AND OVERLAY PAVEMENT — Roadway Rehab | Caltrans District 8 | — | — | 2021-01-01 |
| Rte 127 — Mill and Overlay Pavement — Roadway Rehab | Caltrans District 8 | — | — | 2021-01-01 |
| Rte 5 — Lane Replacement — Resurfacing and Restoration of distressed PCC pavement | Caltrans District 7 | — | — | 2021-01-01 |
| Rte 22 — Cold plane and Overlay AC pavement — Resurfacing of distressed AC pavement | Caltrans District 7 | — | — | 2021-01-01 |
| Rte 14 — Reconstruct Pavement Structure and Ramps — Pavement Rehabilitation | Caltrans District 7 | — | — | 2021-01-01 |