Colorado engineering contracts
61 contracts tracked across 4 DOT regions.
Contracts
61
DOT regions
4
Distinct vendors
37
DOT regions with the most engineering contracts
Top vendors in Colorado engineering
| Vendor | Contracts | Volume |
|---|---|---|
| SENTINEL POWER SERVICES, LLC | 4 | $1.4M |
| RIVERTECH LLC | 3 | $2.5M |
| ADAPT CONSULTING LLC | 2 | $55K |
| COLORADO DEPARTMENT OF TRANSPORTATION | 2 | $1.1M |
| CITY OF FORT COLLINS | 2 | $10.0M |
| COUNTY OF BOULDER | 2 | $1.6M |
Recent engineering contracts in Colorado
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| MECH ENG DESIGN & CONST SUPPORT SERVICES | Colorado (Bureau of Reclamation federal awards) | HDR SCHNABEL RECLAMATION JOINT VENTURE | $167K | — |
| THIS TASK ORDER PROVIDES COMPREHENSIVE ARCHITECTURAL-ENGINEERING (A-E) DESIGN SERVICES FOR ARKANSAS VALLEY CONDUIT (AVC) CONTRACT 8, EXTENDING FROM REGULATING TANK 2 TO THE CITY OF LAMAR, COLORADO. | Colorado (Bureau of Reclamation federal awards) | FORSGREN ASSOCIATES INC | $19.0M | — |
| PBRWS P2S2 ELECTRICAL & MECHANICAL DESIGN | Colorado (Bureau of Reclamation federal awards) | CDM FEDERAL PROGRAMS CORPORATION | $1.3M | — |
| SYSTEM ADMINISTRATION MANAGEMENT AND NETWORK ENGINEERING | Colorado (Bureau of Reclamation federal awards) | DECISIONPOINT CORPORATION | $1.1M | — |
| MATERIALS ENGINEERING TESTING TECHNICIAN | Colorado (Bureau of Reclamation federal awards) | COLORADO NETWORK STAFFING, INC. | $98K | — |
| CVS FACILITATOR BUFFALO BILL STUDY | Colorado (Bureau of Reclamation federal awards) | ADAPT CONSULTING LLC | $28K | — |
| CVS FACILITATOR SHASTA VP STUDY | Colorado (Bureau of Reclamation federal awards) | ADAPT CONSULTING LLC | $27K | — |
| TSC NAVAJO-GALLUP BLENDING STUDY | Colorado (Bureau of Reclamation federal awards) | THE REGENTS OF THE UNIVERSITY OF COLORADO | $24K | — |
| 2025 SEED TECHNICAL SEMINAR AND STUDY TOUR MOTOR COACH | Colorado (Bureau of Reclamation federal awards) | METRO TRAVEL SERVICES INC | $9K | — |
| 1. PERFORM LITERATURE REVIEW ON BEST PRACTICES FOR ROLLING LOAD MACHINE DESIGN. 2. PROVIDE DESIGN FOR A ROLLING LOAD MACHINE. | Colorado rail (FRA federal awards) | ENSCO INC | $139K | — |
| DEVELOP DESIGN AND ENGINEERING REQUIREMENTS FOR A NEXT GENERATION HEAD-OF-TRAIN AND END-OF-TRAIN SYSTEM TO SUPPORT EMERGING TRAIN AUTOMATION AND TRAIN CONTROL TECHNOLOGIES. | Colorado rail (FRA federal awards) | TRANSPORTATION TECHNOLOGY CENTER, INC. | $1.6M | — |
| THE OBJECTIVE OF THIS CONTRACT IS TO SECURE EXPERT ELECTRICAL ENGINEERING PROFESSIONAL SERVICES (WITH A PROFESSIONAL ENGINEER (PE) LICENSED IN THE STATE OF COLORADO) TO PROVIDE TECHNICAL ENGINEERING EXPERTISE AND OVERSIGHT FOR THE REPAIR AND RECONFIG | Colorado rail (FRA federal awards) | SCHENDT ENGINEERING CORPORATION, INC. | $259K | — |
| THE OVERALL GOAL OF THIS SHORT-TERM PROJECT IS TO IMPLEMENT DESIGN IMPROVEMENTS TO THE GPR TECHNOLOGY IN ORDER TO IMPROVE SIGNAL FIDELITY AS WELL AS ADDITIONAL FIELD TESTING IN REVENUE SERVICE TO FURTHER REFINE THE NEURAL NETWORK CAPABILITIES AND DEM | Colorado rail (FRA federal awards) | EARTH SCIENCE SYSTEMS LLC | $195K | — |
| THE OBJECTIVE OF THIS CONTRACT IS TO SECURE EXPERT ENGINEERING PROFESSIONAL SERVICES FOR WATER RESOURCES (REQUIRING A PROFESSIONAL ENGINEER (PE) LICENSED IN THE STATE OF COLORADO) TO PROVIDE TECHNICAL ENGINEERING EXPERTISE AND OVERSIGHT FOR DESIGNING | Colorado rail (FRA federal awards) | WRIGHT WATER ENGINEERS, INC. | $159K | — |
| THIS GRANT WILL DEVELOP A PRELIMINARY SERVICE DEVELOPMENT PLAN (SDP) AND AN ALTERNATIVES ANALYSIS, INCLUDING RAIL MODELING. THESE TASKS ARE TECHNICAL PREREQUISITES TO DEMONSTRATE A FINANCIALLY AND OPERATIONALLY FEASIBLE SERVICE. ANOTHER OBJECTIVE IS TO SHOW PROJECT READINESS FOR THE NEXT PHASE OF PROJECT DEVELOPMENT, WHICH MAY INCLUDE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) INITIATION AND MORE DETAIL PROJECT PLANNING AND ENGINEERING. | Colorado rail (FRA federal awards) | COLORADO DEPARTMENT OF TRANSPORTATION | $548K | — |
| APPLICATION PURPOSE: THE AWARD IS TO FUND A PORTION OF THE RENOVATION AND EXPANSION OF ITS CURRENT MAINTENANCE FACILITY INTO A NEW CENTRALLY LOCATED OPERATIONS MAINTENANCE AND ADMINISTRATIVE CENTER KNOWN AS THE RTC.; ACTIVITIES PERFORMED: THE GRANT SCOPE OF WORK INCLUDES THE DESIGN AND CONSTRUCTION OF PHASE 4 AND PHASE 5.; EXPECTED OUTCOMES: THE RTC WILL ADDRESS RFTAS CURRENT OPERATIONAL DEFICIENCIES SYSTEM CONDITIONS AND WILL ACCOMMODATE FUTURE MOBILITY AND ACCESSIBILITY NEEDS IN RFTAS THREE-COUNTY SERVICE AREA.; INTENDED BENEFICIARIES: POPULACE OF THE RFTAS SERVICE AREA AND LOCAL AREA COMMUTERS.; SUBRECIPIENT ACTIVITIES: NONE. | Colorado transit (FTA federal awards) | ROARING FORK TRANSPORTATION AUTHORITY | $13.0M | — |
| FY15 FY16 FY17 CMAQ STP - PLANNING OPERATIONS TRANSIT WAY DESIGN AND RENOVATIONS AND VEHICLE ACQUISITION | Colorado transit (FTA federal awards) | REGIONAL TRANSPORTATION DISTRICT | $9.8M | — |
| APPLICATION PURPOSE: THE PURPOSE OF THIS APPLICATION IS TO PURCHASE EIGHT (8) BATTERY ELECTRIC BUSES AND ASSOCIATED CHARGING EQUIPMENT AND INFRASTRUCTURE.; ACTIVITIES PERFORMED: THIS GRANT APPLICATION CURRENTLY INCLUDES TWO SCOPE ACTIVITIES:1) PURCHASE OF BATTERY ELECTRIC BUSES 2) ACQUISITION DESIGN AND INSTALLATION OF CHARGING EQUIPMENT AND INFRASTRUCTURE; EXPECTED OUTCOMES: TRANSFORTS FLEET WILL REMAIN IN A STATE OF GOOD REPAIR AS THESE BUSES WILL REPLACE CNG BUSES THAT HAVE REACHED THE END OF THEIR USEFUL LIFE. ADDITIONALLY TRANSFORT WILL MOVE FURTHER TOWARDS THEIR GOAL OF A 100% ZERO EMISSION FLEET.; INTENDED BENEFICIARIES: TRANSFORT RIDERS WILL BENEFIT FROM THE HIGH-LEVEL OF SERVICE BEING PROVIDED. THE COMMUNITIES SURROUNDING TRANSIT ROUTES WILL BENEFIT FROM THE REDUCTION OF PARTICULATE MATTER IN THE AIR AS A RESULT OF DEPLOYING ZERO EMISSION VEHICLES.; SUBRECIPIENT ACTIVITIES: N/A | Colorado transit (FTA federal awards) | CITY OF FORT COLLINS | $8.2M | — |
| APPLICATION PURPOSE: THE PURPOSE OF THIS GRANT AWARD IS TO PURCHASE AND INSTALL TWO ON-ROUTE CHARGERS FOR BATTERY ELECTRIC BUSES.; ACTIVITIES PERFORMED: THE GRANT SCOPE OF WORK INCLUDES THE DESIGN PURCHASE AND INSTALLATION OF TWO ON-ROUTE CHARGERS FOR BATTERY ELECTRIC BUSES.; EXPECTED OUTCOMES: FUNDING WILL PERMIT TRANSFORT TO INCREASE THE OPERATING RANGE OF BATTERY ELECTRIC BUSES FOR EXISTING AND FUTURE ROUTES.; INTENDED BENEFICIARIES: TRANSFORT RIDERS WILL BENEFIT FROM THE HIGH-LEVEL OF SERVICE BEING PROVIDED.; SUBRECIPIENT ACTIVITIES: N/A | Colorado transit (FTA federal awards) | CITY OF FORT COLLINS | $1.8M | — |
| APPLICATION PURPOSE: THIS GRANT USES SURFACE TRANSPORTATION BLOCK GRANT (STBG) FUNDS FLEXED FROM FHWA TO FTA SECTION 5307 FOR A COUNTYWIDE TRANSIT PLAN.; ACTIVITIES PERFORMED: THE GRANT FUNDS CONSULTANT SERVICES FOR COMPLETION OF A COUNTYWIDE STRATEGIC TRANSIT PLAN COVERING THE GEOGRAPHIC EXTENTS OF BOULDER COUNTY.; EXPECTED OUTCOMES: THE KEY OUTCOME OF THIS PROJECT INCLUDE: COMPREHENSIVE TRANSIT PLAN INCLUDING OUTREACH AND ENGAGEMENT AND AN ALTERNATIVES ANALYSIS THAT WILL DELIVER A FINANCIAL GOVERNANCE AND IMPLEMENTATION PLAN FOR TRANSIT SERVICE EXPANSION IN BOULDER COUNTY.; INTENDED BENEFICIARIES: THE PROJECT WILL BENEFIT BOULDER COUNTY MUNICIPALITIES WITHIN BOULDER COUNTY RTD CDOT DRCOG AND THE TRAVELLING PUBLIC.; SUBRECIPIENT ACTIVITIES: N/A | Colorado transit (FTA federal awards) | COUNTY OF BOULDER | $1.2M | — |
| APPLICATION PURPOSE: THE PURPOSE OF THIS GRANT AWARD IS TO CONDUCT TRANSIT PLANNING ACTIVITIES ACROSS THE STATE OF COLORADO.; ACTIVITIES PERFORMED: CONDUCT FIVE SHORT-RANGE TRANSIT PLANNING STUDIES AND ONE STATEWIDE TRANSIT PLAN AND COORDINATED HUMAN SERVICES TRANSPORTATION (HST) PLANNING PROCESS UPDATE.; EXPECTED OUTCOMES: COMPLETION OF PLANNING ACTIVITIES RELATED TO EXPANDED TRANSIT SERVICE PLANNING COMPREHENSIVE OPERATIONS ANALYSIS CONTINUATION OF ONGOING TRANSPORTATION DEVELOPMENT PLANNING FOR A NEW RTA STRATEGIC AND SHORT-RANGE TRANSIT PLANS COMPLETION OF ONGOING OPERATING AND CAPITAL LOGISTICS CORRIDOR PLANNING AND UPDATE OF THE STATEWIDE TRANSIT PLAN AND 10 RURAL COORDINATED HST PLANS.; INTENDED BENEFICIARIES: TRANSIT RIDERS ACROSS THE STATE OF COLORADO.; SUBRECIPIENT ACTIVITIES: FIVE SUBRECIPIENTS AND CDOT ARE RECEIVING FUNDS TO CONDUCT PLANNING STUDIES ACROSS COLORADO: TOWN OF AVON CITY OF COLORADO SPRINGS EAGLE VALLEY TRANSPORTATION AUTHORITY (EVTA) NEIGHBOR TO NEIGHBOR VOLUNTEERS AND NORTH FRONT RANGE METROPOLITAN PLANNING ORGANIZATION (NFRMPO). | Colorado transit (FTA federal awards) | COLORADO DEPARTMENT OF TRANSPORTATION | $590K | — |
| APPLICATION PURPOSE: FURTHER RECOMMENDATIONS OF THE BOULDER COUNTY TRANSPORTATION MASTER PLAN WHICH IDENTIFIED SOUTH BOULDER ROAD AS A FUTURE BRT ROUTE ALIGNMENT.; ACTIVITIES PERFORMED: HIRE A THIRD-PARTY CONSULTANT TO PREFORM PLANNING AND CONCEPTUAL DESIGN WORK FOR THE SOUTH BOULDER ROAD CORRIDOR.; EXPECTED OUTCOMES: IDENTIFY IMPROVEMENTS THAT CAN REDUCE TRANSIT TRAVEL TIME IMPROVE TRANSIT TRAVEL TIME RELIABILITY AND IMPROVE SAFETY FOR PEOPLE ACCESSING TRANSIT.; INTENDED BENEFICIARIES: COMMUTERS RESIDENTS AND VISITORS OF BOULDER COUNTY.; SUBRECIPIENT ACTIVITIES: NONE. | Colorado transit (FTA federal awards) | COUNTY OF BOULDER | $399K | — |
| BIL: CONDUCT DIESEL FST INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT ASPEN, CO (ASE) JCN: 1501583 | Colorado aviation (FAA federal awards) | C.N.S. COMMUNICATIONS, LLC | $230K | — |
| BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR REPLACEMENT PROJECT FOR DENVER, CO (AQDB) JCN: 18066462 | Colorado aviation (FAA federal awards) | SENTINEL POWER SERVICES, LLC | $369K | — |
| BIL FUNDING, SITE SURVEY, DESIGN, AND INSTALLATION REPLACEMENT PROJECT FOR DENVER, CO (AQDA) LOC JCN:18064325 | Colorado aviation (FAA federal awards) | SENTINEL POWER SERVICES, LLC | $369K | — |
| BIL FUNDING. SITE SURVEY, DESIGN, AND INSTALLATION REPLACEMENT PROJECT FOR DENVER, CO (AQD) ALS JCN: 18059897 | Colorado aviation (FAA federal awards) | SENTINEL POWER SERVICES, LLC | $369K | — |
| MASTER PLAN STUDY | Colorado aviation (FAA federal awards) | CITY OF PUEBLO, COLORADO MUNICIPAL BUILDING CORPORATION | $526K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE EXISTING AIRPORT MASTER PLAN STUDY AND INCLUDES AN UPDATED SOLID WASTE RECYCLING PLAN. THIS GRANT FUNDS A PORTION OF THE TOTAL PROJECT. THIS GRANT IS ASSOCIATED WITH AN AIRPORT IMPROVEMENT PROGRAM GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH RANGELY, COLORADO. | Colorado aviation (FAA federal awards) | RIO BLANCO, COUNTY OF | $246K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE EXISTING AIRPORT MASTER PLAN STUDY AND INCLUDES AN UPDATED SOLID WASTE RECYCLING PLAN. THIS GRANT FUNDS A PORTION OF THE TOTAL PROJECT. THIS GRANT IS ASSOCIATED WITH AN AIRPORT INFRASTRUCTURE GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH RANGELY, COLORADO. | Colorado aviation (FAA federal awards) | RIO BLANCO, COUNTY OF | $128K | — |
| CENTENNIAL ATCT (APA) PHASE 1 (SITE SURVEY/DESIGN) | Colorado aviation (FAA federal awards) | M. C. DEAN, INC. | $724K | — |
| PURPOSE: CONDUCT NOISE COMPATIBILITY PLAN STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONDUCTS A PART 150 NOISE COMPATIBILITY PLAN STUDY. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ENGLEWOOD, COLORADO. | Colorado aviation (FAA federal awards) | ARAPAHOE COUNTY PUBLIC AIRPORT AUTHORITY | $2.0M | — |
| PURPOSE: DEVELOP NOISE COMPATIBILITY PLAN. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONDUCTS A 14 CFR PART 150 NOISE COMPATIBILITY PLAN STUDY. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH BROOMFIELD, COLORADO. | Colorado aviation (FAA federal awards) | COUNTY OF JEFFERSON | $1.4M | — |
| BIL FUNDING, SITE SURVEY, DESIGN, AND INSTALLATION REPLACEMENT PROJECT FOR RED TABLE, CO (DBLA) ATCBI JCN: 22002405 | Colorado aviation (FAA federal awards) | SENTINEL POWER SERVICES, LLC | $275K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE EXISTING AIRPORT MASTER PLAN STUDY AND INCLUDES AN UPDATED SOLID WASTE RECYCLING PLAN. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH GUNNISON, COLORADO. | Colorado aviation (FAA federal awards) | GUNNISON, COUNTY OF | $782K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN OR STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE AIRPORT MASTER PLAN NARRATIVE REPORT AND AIRPORT LAYOUT PLAN TO ADDRESS KEY ISSUES, OBJECTIVES AND GOALS PERTINENT TO THE AIRPORT'S FUTURE DEVELOPMENT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH EAGLE, COLORADO. | Colorado aviation (FAA federal awards) | COUNTY OF EAGLE | $691K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN OR STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES AN EXISTING AIRPORT MASTER PLAN STUDY TO REFLECT THE FUTURE NEEDS OF THE AIRPORT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH RIFLE, COLORADO. | Colorado aviation (FAA federal awards) | GARFIELD COUNTY, COLORADO | $591K | — |
| PURPOSE: RECONSTRUCT TAXILANE. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 2,000 FEET OF EXISTING NORTH-EAST TAXILANE PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS PHASE ONE, WHICH CONSISTS OF DESIGN AND CONSTRUCTION ADMINISTRATION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH LONGMONT, COLORADO. | Colorado aviation (FAA federal awards) | CITY OF LONGMONT | $568K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN OR STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE AIRPORT MASTER PLAN NARRATIVE REPORT AND AIRPORT LAYOUT PLAN TO ADDRESS KEY ISSUES, OBJECTIVES AND GOALS PERTINENT TO THE AIRPORT'S FUTURE DEVELOPMENT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH WALSENBURG, COLORADO. | Colorado aviation (FAA federal awards) | COUNTY OF HUERFANO | $299K | — |
| PURPOSE: CONSTRUCT/EXPAND HANGAR; REHABILITATE TAXILANE. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A NEW 11,781 SQUARE FOOT SPONSOR-OWNED HANGAR FOR AIRCRAFT STORAGE TO ASSIST THE AIRPORT TO BE AS SELF-SUSTAINING AS POSSIBLE BY GENERATING REVENUE. THIS PROJECT IS ALLOWABLE UNDER THE BIPARTISAN INFRASTRUCTURE LAW'S EXPANDED ELIGIBILITY. THIS PROJECT REHABILITATES 1,500 FEET OF THE EXISTING TAXILANE EAST PAVEMENT TO EXTEND ITS USEFUL LIFE. THIS GRANT FUNDS PHASE 1, WHICH CONSISTS OF DESIGN. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH PUEBLO, COLORADO. | Colorado aviation (FAA federal awards) | CITY OF PUEBLO, COLORADO MUNICIPAL BUILDING CORPORATION | $233K | — |
| THE CONTRACTOR MUST PROVIDE HIGH-QUALITY SERVICES TO SUPPORT THE ACTIVITIES, INCLUDING: PROVIDING SCIENTIFIC, TECHNICAL, AND ENGINEERING EXPERTISE IN THE AREA HUMAN FACTORS RESEARCH AND HUMAN-CENTERED SYSTEM DEVELOPMENT; DEVELOPING, VALIDATING | Colorado aviation (FAA federal awards) | DSOFT TECHNOLOGY COMPANY | $1.7M | — |
| FUNDING OPTION YEAR III ON CONTRACT 6973GH-19-D-00009, ENGINEERING SUPPORT SERVICES | Colorado aviation (FAA federal awards) | RIVERTECH LLC | $1.0M | — |
| ADDING FUNDS TO CONTRACT 6973GH-19-00009 - ENGINEERING SUPPORT SERVICES | Colorado aviation (FAA federal awards) | RIVERTECH LLC | $895K | — |
| FUNDING THE 4-MONTH EXTENSION TO THE ENGINEERING SUPPORT SERVICES CONTRACT, 6973GH-19-D-00009 FROM 12/01/23 TO 03/31/24. | Colorado aviation (FAA federal awards) | RIVERTECH LLC | $572K | — |
| PROCUREMENT OF SPECTRUM ANALYZERS, N9935C FIELD FOX 10 GHZ SIGNAL ANALYZERS (QTY 8), FOR SPECTRUM ENGINEERING. | Colorado aviation (FAA federal awards) | TECHNICAL COMMUNITIES, INC. | $525K | — |
| BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT DENVER, CO (TDWR) DENK JCN:19005959 | Colorado aviation (FAA federal awards) | CHICKASAW STRATEGIC POINTE, LLC | $369K | — |
| 6973GH-21-D-00033 2025 MMAC SELENIUM STUDY | Colorado aviation (FAA federal awards) | WESTON SOLUTIONS INC | $315K | — |
| ACCURIS ENGINEERING WORKBENCH SUBSCRIPTION | Colorado aviation (FAA federal awards) | ALLIUM US HOLDING LLC | $280K | — |
| ACCURIS ENGINEERING WORKBENCH SUBSCRIPTION | Colorado aviation (FAA federal awards) | ALLIUM US HOLDING LLC | $277K | — |
| ENGINEERING STANDARDS SUBSCRIPTION | Colorado aviation (FAA federal awards) | IHS GLOBAL INC | $256K | — |
| ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF OUTDOOR EG WITH SUBBASE TANK AT ASPEN, CO (ASEA) ATCT JCN: 1501584 | Colorado aviation (FAA federal awards) | CHICKASAW STRATEGIC POINTE, LLC | $53K | — |