Colorado rail contracts
DOTContractAlert tracks 76 rail contracts across 1 Colorado DOT region, held by 20 vendors. ENSCO INC holds the most (34).
Contracts
76
DOT regions
1
Vendors
20
Colorado rail contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Conduct 800KIP Compression Test Of Arrow Iii Vehicle To Validate Previously Developed Finite Element Models. | Colorado rail (FRA federal awards) | |
| Conduct Test And Data Collection For The Clear Path & Ranging Project At Ttc. | Colorado rail (FRA federal awards) | |
| The Purpose Of This Project Is To Perform Transmission Line Maintenance And Pole Replacement On The High-power Electrical Line At Ttc. These Thirteen (13) Transmission Poles Were Identified For Replacement On Circuit #1 And Circuit #2 Durin | Colorado rail (FRA federal awards) | |
| Install A New, High-capacity Fire Protection System (3,000 Gpm At 125 Psi), A New Fire Pump Controller With Soft Start Full-speed Operation And An Across-the-line Bypass, And A New Pressure Relief Valve And Ductile Iron Pipe To Ensure The I | Colorado rail (FRA federal awards) | |
| The Objective Of This Task Is To Provide Funding Necessary For The Operations, Maintenance, Repair And Upgrades Support While The Test Vehicles Are Used By Ordt And Rpd On An As Needed Basis. | Colorado rail (FRA federal awards) | |
| Complete Upgrade Of Two Non-functioning Active Grade Crossing Protection Systems At Ttc. | Colorado rail (FRA federal awards) | |
| The Objectives Of The Research Project Are To Evaluate The Efficacy Of New Emerging Fire Suppression/extinguishing Technologies For Rail Applications, And Human Factors Impact On Effectiveness Of The Technology. | Colorado rail (FRA federal awards) | |
| Provide Support To University- And Third-party-led Research Initiatives For Controlled Testing In A "real-world" Setting At Ttc For New And Emerging Technologies. | Colorado rail (FRA federal awards) | |
| Managed Services For Onsite Administrative And Logistical Support At The Transportation Technology Center. | Colorado rail (FRA federal awards) | |
| The Primary Objective Of The Proposed Research Is To Continue The On-going Effort On Rail Integrity And Achieve Higher Reliability Of Nde Inspection/procedures For Complete Rail Flaw Detection And Characterization. This Proposed Solution AI | Colorado rail (FRA federal awards) | |
| With The Planned Increase In High-speed Rail Corridors In The United States, There Is A Growing Need For Facilities To Help Modeling, Model Validation And Qualification Of New Equipment And Technology Prior To ITS Introduction Into Service. | Colorado rail (FRA federal awards) | |
| The Objective Of Phase V Is To Build On Prior-phase Findings By Expanding Thermal-mechanical Fea And Fracture-mechanics Analyses And By Performing Targeted Laboratory Testing To Provide Property Data And Validation. The Work Will Evaluate C | Colorado rail (FRA federal awards) | |
| Take The Best Rnt Measurement Technologies Of Today And Provide Support To Develop A Solution In Two Years. | Colorado rail (FRA federal awards) | |
| This Can Be Better Done At Ttc Due To The Resources Available There And ITS Future As A Training Facility As This Contract Involves Developing Training Materials. | Colorado rail (FRA federal awards) | |
| The Project Replaces 29 Miles Of Bolted Rail With New Continuously Welded Rail (cwr 136LBS) And Surfaces 4.8 Miles Of Embedded Cwr To Rehabilitate 33.8 Miles Of Right-of-way And Also Replaces Approximately Twenty Grade Crossings With Modern | Colorado rail (FRA federal awards) |
DOT regions with the most rail contracts
Vendors with the most Colorado rail contracts
| Vendor | Contracts | Volume |
|---|---|---|
| ENSCO INC | 34 | $20.9M |
| TRANSPORTATION TECHNOLOGY CENTER, INC. | 24 | $17.5M |