Connecticut aviation contracts
DOTContractAlert tracks 101 aviation contracts across 1 Connecticut DOT region, held by 37 vendors. AIRFLO INSTRUMENT COMPANY, THE holds the most (16).
Contracts
101
DOT regions
1
Vendors
37
Connecticut aviation contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Procurement Of ASR-9 Flex Waveguide (feedhorn W/g To Rj Bottom Port- Low Beam) | Connecticut aviation (FAA federal awards) | |
| Assets In Support Of The Nas | Connecticut aviation (FAA federal awards) | |
| Refurbish The National Air Space Electrical Equipment Building (naseb) Trailer, For The Approach Lighting System (als), At The Bradley International Airport (bdl), Windsor Locks, Ct | Connecticut aviation (FAA federal awards) | |
| The Annual Renewal Of Bossdesk Subscription. | Connecticut aviation (FAA federal awards) | |
| Janitorial Services For The Bdl Atct/tracon In Windsor Locks, Ct And Hfd Atct In Hartford, Ct. | Connecticut aviation (FAA federal awards) | |
| Purpose: Obstruction Marking/lighting/removal [non-hazard]. Activities To Be Performed/expected Outcomes: This Project Removes Non-hazard Tree Obstructions To Meet Federal Aviation Administration Standards. . This Grant Funds The Second Ph | Connecticut aviation (FAA federal awards) | |
| Provide Janitorial Services For The Towers Within The New Haven Ssc; Gon Atct, Groton, Ct, Hvn Atct, New Haven, Ct, Bdr Atct, Bridgeport, Ct And Dxr Atct, Danbury, Ct | Connecticut aviation (FAA federal awards) | |
| Purpose: Reconstruct Perimeter Fencing Not Required By 49 Cfr 1542. Activities To Be Performed/expected Outcomes: This Project Reconstructs 1,806 Feet Of The Existing Perimeter Fencing To Deter Access By Unauthorized Persons And Vehicles O | Connecticut aviation (FAA federal awards) | |
| Snow Removal And Landscaping Services At Bdl Atct In Windsor Locks, Ct | Connecticut aviation (FAA federal awards) | |
| Purpose: Rehabilitate Access Road; Construct Or Improve Parking Lot; Install Perimeter Fencing Not Required By 49 Cfr 1542. Activities To Be Performed/expected Outcomes: This Project Improves The Non-revenue Generating Airport Parking Lot | Connecticut aviation (FAA federal awards) | |
| Purpose: Construct/modify/improve/rehabilitate Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New 10,000 Square Foot T-hangar For Aircraft Storage, Maintenance, Or Service To Assist The Airport To Be As Sel | Connecticut aviation (FAA federal awards) | |
| Purpose: Update State/regional System Plan. Activities To Be Performed/expected Outcomes: This Project Updates An Existing State Airport System Plan For Pavement Condition Index And Pavement Condition Rating At The Connecticut Airport Aut | Connecticut aviation (FAA federal awards) | |
| Purpose: Construct/modify/improve/rehabilitate Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New 10,000 Square Foot T-hangar For Aircraft Storage, Maintenance, Or Service To Assist The Airport To Be As Sel | Connecticut aviation (FAA federal awards) | |
| Purpose: Construct/install/expand Airport Lighting Vault. Activities To Be Performed/expected Outcomes: This Project Expands The Existing Lighting Vault To Meet Additional Airfield Lighting Needs And Federal Aviation Administration Standar | Connecticut aviation (FAA federal awards) | |
| Purpose: Zero Emissions Infrastructure. Activities To Be Performed/expected Outcomes: This Project Acquires Zero Emissions Equipment Including Two Vehicles And Recharging Stations. Intended Beneficiary: This Grant Will Provide Federal Fun | Connecticut aviation (FAA federal awards) | |
| Projects 1-4 Evaluate Impact Of Saf To Aircraft Fuel System Robustness And Advance Low Emissions Technologies. Projects 5-7 Evaluate Fuel-efficient Propulsion Architectures And Battery Advancements. | Connecticut aviation (FAA federal awards) | |
| Purpose: Reconstruct Hangar. Activities To Be Performed/expected Outcomes: This Project Reconstructs An Existing 10,000 Square Foot Sponsor-owned Hangar Used For Aircraft Storage That Has Reached The End Of ITS Useful Life. The Sponsor Ha | Connecticut aviation (FAA federal awards) | |
| Purpose: Acquire Snow Removal Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires One Carrier Vehicle Snow Removal Equipment To Enhance The Airport's Ability To Clear The Priority Areas Of The Airfield During Adv | Connecticut aviation (FAA federal awards) | |
| Purpose: Acquire Snow Removal Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires One Carrier Vehicle Snow Removal Equipment To Enhance The Airport's Ability To Clear The Priority Areas Of The Airfield During Adv | Connecticut aviation (FAA federal awards) | |
| Purpose: Reconstruct Hangar. Activities To Be Performed/expected Outcomes: This Project Reconstructs An Existing 10,000 Square Foot Sponsor-owned Hangar Used For Aircraft Storage That Has Reached The End Of ITS Useful Life. The Sponsor Has | Connecticut aviation (FAA federal awards) | |
| Purpose: Reconstruct Airport Lighting Vault Equipment. Activities To Be Performed/expected Outcomes: This Project Replaces The Existing Airport Lighting Vault Equipment That Has Reached The End Of ITS Useful Life. Intended Beneficiary: Th | Connecticut aviation (FAA federal awards) | |
| Purpose: Reconstruct Hangar. Activities To Be Performed/expected Outcomes: This Project Reconstructs An Existing 10,000 Square Foot Sponsor-owned Hangar Used For Aircraft Storage That Has Reached The End Of ITS Useful Life. This Grant Fund | Connecticut aviation (FAA federal awards) | |
| Purpose: Reconstruct Airfield Equipment; Acquire Airfield Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires 40 New Vehicle Movement Area Transponders To Bring The Airport Into Conformity With Current Standards. | Connecticut aviation (FAA federal awards) | |
| Purpose: Vale Infrastructure. Activities To Be Performed/expected Outcomes: This Project Acquires And Installs Low-emission Equipment Including 3 Alternative Fuel Vehicles And An Electric Vehicle Charging Station. Intended Beneficiary: Th | Connecticut aviation (FAA federal awards) | |
| Bdl Roof A&e Services | Connecticut aviation (FAA federal awards) |
DOT regions with the most aviation contracts
Vendors with the most Connecticut aviation contracts
| Vendor | Contracts | Volume |
|---|---|---|
| AIRFLO INSTRUMENT COMPANY, THE | 16 | $289K |
| CONNECTICUT AIRPORT AUTHORITY | 9 | $20.3M |
| MICROTECH INC | 8 | $403K |
| GENERAL DIGITAL CORP | 7 | $413K |
| TWEED NEW HAVEN AIRPORT AUTHORITY | 6 | $5.7M |
| MERIDEN MARKHAM AIRPORT | 6 | $1.0M |
| CITY OF DANBURY CT | 6 | $744K |
| GARTNER, INC. | 4 | $1.8M |
| THE CARLYLE JOHNSON MACHINE CO, LLC | 4 | $155K |
| CUSA CONSULTING LLC | 3 | $2.0M |