Florida airfield contracts
DOTContractAlert tracks 327 airfield contracts across 1 Florida DOT region, held by 70 vendors. GREATER ORLANDO AVIATION AUTHORITY holds the most (16).
Contracts
327
DOT regions
1
Vendors
70
Florida airfield contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Purpose: Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 5/23 And Runway 14/32 Vertical/visual Guidance Systems To Make The Airport More Accessible By I | Florida aviation (FAA federal awards) | |
| Purpose: Construct Taxiway; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 450 Feet Of The Existing Taxiway D Pavement That Has Reached The End Of ITS Useful Life. This Project Reconstructs 80 | Florida aviation (FAA federal awards) | |
| Purpose: Wildlife Hazard Habitat Modification. Activities To Be Performed/expected Outcomes: This Project Mitigates 13 Acres Of Wetlands In The Approach To Runway 26 As Recommended By A Wildlife Hazard Management Plan To Reduce Wildlife At | Florida aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Relocates Runway 7/25 40 Feet Laterally To Meet Federal Aviation Administration Design Standards. This Grant Funds The Second Phase, | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 10,000 Square Yards Of The Existing East Ramp Apron To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object D | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Apron; Rehabilitate Taxilane. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 1,136 Feet Of The Existing Taxilane Pavement To Extend ITS Useful Life. . This Project Rehabilitates 9,900 Square | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Apron; Rehabilitate Taxilane. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 2,200 Feet Of The Existing Taxilane Pavement To Extend ITS Useful Life. . This Project Rehabilitates 3,680 Square | Florida aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconfigures Taxiway L1 Pavement Width To Reduce The Potential Risk Of Runway Incursions And Meet Federal Aviation Administration De | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 730 Feet Of Runway 9/27 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. Intended Beneficiar | Florida aviation (FAA federal awards) | |
| Purpose: Improve Airport Drainage/erosion Control; Improve/modify/rehabilitate Service Road. Activities To Be Performed/expected Outcomes: This Project Improves An Existing On-airport Roadway Around The Air Operations Area, To Provide A Pa | Florida aviation (FAA federal awards) | |
| Purpose: Install Runway Vertical/visual Guidance System; Rehabilitate Runway Lighting; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 5/23 End Identifier Lights At This General A | Florida aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 2,700 Foot Taxiway G To Provide Access To Aircraft Hangars. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Ass | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Airport Beacon; Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing General Aviation Apron An Additional 4,500 Square Yards To Meet Federal Aviation Administration Design Stan | Florida aviation (FAA federal awards) | |
| Purpose: Install Apron Edge Lights And/or Flood Lighting. Activities To Be Performed/expected Outcomes: This Project Installs Seven Flood Lights On The General Aviation Apron To Add Visibility Of Surface Edges And Boundaries. This Grant Fu | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 3,200 Feet Of The Existing Taxiway D Pavement To Extend ITS Useful Life. This Project Rehabilitates Th | Florida aviation (FAA federal awards) | |
| Purpose: Conduct Or Update Miscellaneous Study. Activities To Be Performed/expected Outcomes: This Project Conducts A New Obstruction Survey To Identify Obstructions To The Existing Runway Approaches. Intended Beneficiary: This Grant Will | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway Lighting; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 6,002 Feet Of Runway 9/27 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Obj | Florida aviation (FAA federal awards) | |
| Purpose: Acquire Aircraft Rescue & Fire Fighting Vehicle; Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Acquires A Replacement Aircraft Rescue And Fire Fighting Vehicle To Assist The Airport In Meeting Safe | Florida aviation (FAA federal awards) | |
| Purpose: Reconstruct Airport Beacon; Airport Miscellaneous Improvements; Rehabilitate Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Improves Airport Drainage To Reduce Wildlife Attractants. This Action Is Reco | Florida aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway; Acquire Or Rehabilitate Emergency Generator; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Acquires A Replacement Emergency Generator To Ensure Elec | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway Signage/markings. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Existing Runway 1/19 Markings That Have Reached The End Of Their Useful Lives. Intended Beneficiary: This Grant Wi | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 2,800 Feet Of The Existing Taxiway A Pavement To Extend ITS Useful Life. This Project Rehabilitates The | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Rehabilitate Runway Lighting; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 14/32 Precision Approach Path Indi | Florida aviation (FAA federal awards) | |
| Purpose: Install Runway Lighting; Extend Runway; Install Taxiway Lighting; Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Extends Runway 28 An Additional 185 Feet To Meet Federal Aviation | Florida aviation (FAA federal awards) | |
| Purpose: Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 49,662 Square Yards Of The Existing General Aviation Apron Pavement To Maintain The Structural Integrity Of The Pavement And To Minimize | Florida aviation (FAA federal awards) |
DOT regions with the most airfield contracts
Vendors with the most Florida airfield contracts
| Vendor | Contracts | Volume |
|---|---|---|
| GREATER ORLANDO AVIATION AUTHORITY | 16 | $181.7M |
| COUNTY OF PALM BEACH | 15 | $53.8M |
| DADE COUNTY AVIATION | 14 | $128.5M |
| JACKSONVILLE AVIATION AUTHORITY | 12 | $51.4M |
| CITY OF TALLAHASSEE | 9 | $44.9M |
| HILLSBOROUGH COUNTY AVIATION AUTHORITY | 8 | $93.1M |
| CHARLOTTE COUNTY AIRPORT AUTHORITY | 8 | $59.5M |
| KEY WEST INTERNATIONAL AIRPORT | 8 | $46.0M |
| BROWARD, COUNTY OF | 8 | $44.0M |
| SEBRING AIRPORT AUTHORITY | 8 | $14.3M |