Georgia engineering contracts
48 contracts tracked across 3 DOT regions.
Contracts
48
DOT regions
3
Distinct vendors
30
DOT regions with the most engineering contracts
Top vendors in Georgia engineering
| Vendor | Contracts | Volume |
|---|---|---|
| GEORGIA DEPARTMENT OF TRANSPORTATION | 5 | $18.4M |
| M. C. DEAN, INC. | 5 | $8.9M |
| WELLS GLOBAL, LLC | 3 | $10.3M |
| COUNTY OF COBB | 2 | $12.4M |
| ATLANTA REGIONAL COMMISSION | 2 | $1.4M |
| METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY | 2 | $1.3M |
Recent engineering contracts in Georgia
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| APPLICATION PURPOSE: THIS FY2021 AREAS OF PERSISTENT POVERTY (AOPP) GRANT APPLICATION REQUESTS $444444 (FEDERAL: $400000) TO SUPPORT A TRANSIT EXPANSION AND MOBILITY STUDY AIMED AT RESTRUCTURING TRANSIT SERVICES TO ENHANCE ACCESSIBILITY IN CHATHAM COUNTY. THE STUDY WILL FOCUS ON EXPANDING PUBLIC TRANSPORTATION IN AREAS EXPERIENCING NEW JOB GROWTH ENSURING THAT RESIDENTS ESPECIALLY THOSE IN ALL UNDERSERVED COMMUNITIES HAVE RELIABLE CONNECTIONS BETWEEN HOUSING AND EMPLOYMENT CENTERS RESULTING FROM RECENT ECONOMIC DEVELOPMENTS IN SAVANNAH GEORGIA. WITH OVER 2000 NEW JOBS BEING CREATED AT THREE MAJOR EMPLOYMENT HUBS AMAZON FEDEX AND PORT CITY LOGISTICS THIS PROJECT SEEKS TO EVALUATE AND DESIGN PUBLIC TRANSIT SOLUTIONS THAT CONNECT THESE EMERGING JOB CENTERS WITH RESIDENTIAL AREAS CURRENTLY UNDERSERVED BY TRANSIT. THESE NEW EMPLOYMENT HUBS ARE LOCATED ALONG MAJOR ARTERIAL CORRIDORS IN THE OUTER REACHES OF THE CAT SERVICE AREA BEYOND THE REACH OF EXISTING FIXED-ROUTE TRANSIT.THE STUDY CONSISTS OF TWO INTEGRATED TASKS. TASK 1 FOCUSES ON ANALYZING THE FEASIBILITY OF EXPANDING TRANSIT SERVICES TO MEET THE MOBILITY DEMANDS BETWEEN RESIDENTIAL NEIGHBORHOODS AND EMPLOYMENT ZONES. THIS INCLUDES IDENTIFYING OPTIMAL ROUTING AND ASSESSING LAND USE TRENDS WORKFORCE LOCATIONS AND FIRST/LAST MILE CHALLENGES. TASK 2 EXPLORES A RANGE OF INNOVATIVE SERVICE MODELS SUCH AS MICROTRANSIT VANPOOLS AND FLEXIBLE ZONE-BASED SERVICES AS ALTERNATIVES TO TRADITIONAL FIXED ROUTES. IT WILL ALSO ASSESS NECESSARY TRANSIT VEHICLE TYPES AND INFRASTRUCTURE IMPROVEMENTS TO SUPPORT THESE MODELS. AFTER THIS PROJECT IS COMPLETED IT WILL LEAD TO A SECOND PROJECT STAND ALONE PROJECT TO ENGAGE LOCAL ORGANIZATIONS AND INSTITUTIONS TO BUILD PARTNERSHIPS CRITICAL TO SUCCESSFUL SERVICE IMPLEMENTATION. THESE COLLABORATIONS WILL ALSO HELP IDENTIFY OUTREACH STRATEGIES AND BUILD COMMUNITY SUPPORT TO GUIDE FUTURE TRANSIT EXPANSIONS.THIS APPROACH OF COMBINING THE TWO TASKS - THE TRANSIT EXPANSION STUDY AND INNOVATIVE TECHNOLOGY OPPORTUNITIES INTO ONE PROJECT AND SAVING THE COLLABORATIONS FOR IMPLEMENTATION TASK AS A STANDALONE PROJECT TO BE COMPLETED AT A LATER TIME IS CONSISTENT WITH PROJECT SCALABILITY MODEL AS OUTLINE IN THE SF-424 SUPPLEMENTAL FORM.; ACTIVITIES PERFORMED: THE ACTIVITIES TO BE PERFORMED WITH THE AWARD FUNDS WILL INCLUDE SEVERAL KEY STAGES AIMED AT STRATEGICALLY EXPANDING TRANSIT SERVICES AND IDENTIFYING EFFECTIVE OPERATIONAL MODELS. INITIALLY THE FUNDS WILL BE USED FOR COMPREHENSIVE RESEARCH AND PLANNING FOCUSING ON IDENTIFYING AREAS WHERE NEW JOB GROWTH HAS OCCURRED AND WHERE TRANSIT SERVICES ARE LACKING. THIS WILL INVOLVE DATA COLLECTION STAKEHOLDER ENGAGEMENT AND AN ANALYSIS OF CURRENT TRANSIT INFRASTRUCTURE TO PINPOINT GAPS AND AREAS FOR IMPROVEMENT.IN THE SECOND PHASE THE AWARD WILL SUPPORT THE EVALUATION OF SEVERAL TRANSIT OPERATIONAL MODELS SPECIFICALLY DESIGNED FOR THE IDENTIFIED EMPLOYMENT HUBS. THIS WILL INCLUDE STUDYING VARIOUS SERVICE MODELS SUCH AS ON-DEMAND FIXED-ROUTE OR MICROTRANSIT SOLUTIONS TO DETERMINE THE MOST EFFICIENT AND COST-EFFECTIVE OPTIONS FOR EXPANDING TRANSIT ACCESS IN THESE AREAS. ADDITIONALLY FUNDS WILL BE USED FOR OUTREACH AND COLLABORATION WITH LOCAL STAKEHOLDERS INCLUDING COMMUNITY ORGANIZATIONS BUSINESSES AND GOVERNMENT ENTITIES TO ENSURE THAT THE PROPOSED TRANSIT SOLUTIONS ALIGN WITH THE NEEDS OF THE COMMUNITY AND ARE SUPPORTED BY KEY PARTNERS.; EXPECTED OUTCOMES: EXPECTED OUTCOMES:THE EXPECTED OUTCOMES OF THE TRANSIT EXPANSION AND MOBILITY STUDY INCLUDE SEVERAL SIGNIFICANT BENEFITS THAT WILL ENHANCE BOTH THE URBAN TRANSIT SYSTEM AND THE BROADER COMMUNITY. THESE BENEFITS WILL CONTRIBUTE TO THE STRATEGIC DEVELOPMENT OF A MORE EFFICIENT AND ACCESSIBLE TRANSIT NETWORK:1. IMPROVED TRANSIT ACCESS: THE STUDY WILL IDENTIFY KEY AREAS WHERE TRANSIT SERVICE IS LACKING SPECIFICALLY IN REGIONS WITH NEW JOB GROWTH. EXPANDING TRANSIT SERVICES TO THESE AREAS WILL PROVIDE GREATER MOBILITY FOR WORKERS MAKING IT EASIER FOR THEM TO ACCESS EMPLOYMENT OPPORTUNITIES AND REDUCING BARRIERS BETWEEN HOUSING AND JOB CENTERS.2. ENHANCED MOBILITY AND REDUCED CONGESTION: BY EXPANDING TRANSIT IN GROWING EMPLOYMENT AREAS THE STUDY WILL HELP REDUCE CONGESTION ON ROADWAYS. WITH MORE PEOPLE UTILIZING PUBLIC TRANSPORTATION THE OVERALL VOLUME OF CARS ON THE ROAD WILL DECREASE EASING TRAFFIC AND IMPROVING COMMUTE TIMES FOR EVERYONE.3. EFFICIENCY OF TRANSIT OPERATIONS: THE EVALUATION OF DIFFERENT OPERATIONAL MODELS WILL LEAD TO THE IMPLEMENTATION OF THE MOST COST-EFFECTIVE AND EFFICIENT TRANSIT SOLUTIONS. THIS WILL OPTIMIZE THE USE OF RESOURCES AND ENSURE THAT TRANSIT SERVICES ARE ALIGNED WITH THE UNIQUE NEEDS OF THE EMPLOYMENT AREAS ULTIMATELY IMPROVING SERVICE DELIVERY.4. ECONOMIC GROWTH AND WORKFORCE DEVELOPMENT: THE EXPANSION OF TRANSIT SERVICES WILL SUPPORT LOCAL BUSINESSES AND ECONOMIC DEVELOPMENT BY IMPROVING ACCESS TO JOB CENTERS. IT WILL ALSO PROMOTE WORKFORCE PARTICIPATION BY ENSURING THAT ALL RESIDENTS PARTICULARLY THOSE IN UNDERSERVED AREAS HAVE RELIABLE TRANSPORTATION OPTIONS TO REACH EMPLOYMENT OPPORTUNITIES.5. INFORMED DECISION-MAKING FOR FUTURE INVESTMENTS: THE STUDY WILL PROVIDE COMPREHENSIVE DATA AND INSIGHTS THAT WILL GUIDE FUTURE TRANSPORTATION INFRASTRUCTURE INVESTMENTS. IT WILL IDENTIFY THE MOST BENEFICIAL PARTNERSHIPS AND STRATEGIES FOR THE SUCCESSFUL IMPLEMENTATION OF THE TRANSIT EXPANSION ENSURING LONG-TERM SUCCESS..THESE OUTCOMES COLLECTIVELY AIM TO ENHANCE THE OVERALL EFFICIENCY AND ACCESSIBILITY OF THE TRANSIT SYSTEM ULTIMATELY BENEFITING BOTH THE LOCAL ECONOMY AND RESIDENTS QUALITY OF LIFE.; INTENDED BENEFICIARIES: INTENDED BENEFICIARIES:THE INTENDED BENEFICIARIES OF THE TRANSIT EXPANSION AND MOBILITY STUDY INCLUDE A WIDE RANGE OF INDIVIDUALS AND GROUPS WITHIN THE COMMUNITY:1. COMMUTERS: RESIDENTS OF SAVANNAH PARTICULARLY THOSE REGIONS WITH NEW JOB GROWTH WILL BENEFIT FROM EXPANDED TRANSIT SERVICES. THEY WILL HAVE IMPROVED ACCESS TO PUBLIC TRANSPORTATION MAKING IT EASIER FOR THEM TO TRAVEL TO WORK SCHOOL AND OTHER ESSENTIAL DESTINATIONS.2. EMPLOYEES: WORKERS IN AREAS WITH NEWLY DEVELOPED JOB CENTERS WILL DIRECTLY BENEFIT FROM IMPROVED TRANSPORTATION OPTIONS. WITH ENHANCED TRANSIT ACCESS EMPLOYEES WILL BE ABLE TO COMMUTE MORE EFFICIENTLY REDUCING TIME AND COSTS ASSOCIATED WITH TRAVEL AND INCREASING OVERALL WORKFORCE PARTICIPATION.3. EMPLOYERS AND BUSINESSES: LOCAL BUSINESSES PARTICULARLY THOSE IN EMERGING JOB HUBS WILL BENEFIT FROM AN EXPANDED AND MORE RELIABLE WORKFORCE. AS WORKERS GAIN BETTER ACCESS TO JOB CENTERS EMPLOYERS WILL HAVE A LARGER POOL OF POTENTIAL EMPLOYEES AND MAY EXPERIENCE HIGHER PRODUCTIVITY AND LOWER TURNOVER.4. LOCAL GOVERNMENTS AND TRANSIT AGENCIES: THE FINDINGS FROM THE STUDY WILL HELP GUIDE FUTURE POLICY DECISIONS AND INVESTMENTS IN TRANSPORTATION INFRASTRUCTURE BENEFITING LOCAL GOVERNMENTS AND TRANSIT AGENCIES RESPONSIBLE FOR MANAGING AND IMPROVING THE REGIONS TRANSIT NETWORK.THE PROJECT WILL PROVIDE DIRECT AND INDIRECT BENEFITS TO COMMUTERS EMPLOYEES AND BUSINESSES WHILE ALSO SUPPORTING THE OVERALL GROWTH OF SAVANNAHS TRANSPORTATION SYSTEM.; SUBRECIPIENT ACTIVITIES: NONE; THIS AWARD WILL BE DIRECTLY MANAGED BY THE TRANSIT AGENCY WITH ALL ACTIVITIES INCLUDING PROCUREMENT INFRASTRUCTURE DEVELOPMENT WORKFORCE TRAINING AND FLEET INTEGRATION HANDLED INTERNALLY. NO SUBRECIPIENTS ARE PLANNED FOR THIS PROJECT. | Georgia transit (FTA federal awards) | CHATHAM AREA TRANSIT AUTHORITY | $400K | — |
| (1) PURPOSE: THE PURPOSE OF THIS GRANT IS TO FUND ONGOING OPERATING ACTIVITIES FOR COBB COUNTYS TRANSIT SYSTEM COBBLINC. (2) ACTIVITIES TO BE PERFORMED: THE ACTIVITIES TO BE PERFORMED ARE THE DAY TO DAY OPERATIONS OF TRANSIT. (3) ANTICIPATED OUTCOMES: THE ANTICIPATED OUTCOMES ARE THAT SOME OF THE INCREASED COSTS OF OPERATING TRANSIT DURING THE PANDEMIC WILL BE PAID FOR WITH THIS GRANT. (4) INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES OF THE GRANT FUNDING ARE THE CITIZENS OF COBB AND THE REGION AND MORE SPECIFICALLY THOSE WHO UTILIZE COBBLINC FOR THEIR TRANSPORTATION NEEDS TO GET TO WORK ACCESS MEDICAL SERVICES ATTEND SCHOOL AND SOCIAL ACTIVITIES. (5) SUBRECIPIENT ACTIVITIES: THERE ARE NO SUBRECIPIENTS OF THIS GRANT. THE TOTAL AMOUNT OF THE GRANT IS $10390867.00 FEDERAL TO BE REIMBURSED AT A RATE OF 100%. THERE ARE NO LOCAL FUNDS INCLUDED IN THE GRANT.COBB COUNTY IS A DIRECT RECIPIENT OF FTA FUNDS. THE STATE OF GA ATLANTA-REGION TRANSIT LINK AUTHORITY IS THE DESIGNATED RECIPIENT FOR THE ATLANTA URBANIZED AREA. FUNDS INCLUDED IN THIS GRANT HAVE BEEN ALLOCATED THROUGH THE REGIONAL PROCESS. NO INDIRECT COST RATE WILL BE APPLIED TO ANY ACTIVITIES INCLUDED IN THE APPLICATION. THE PURPOSE OF THE GRANT IS TO COVER ELIGIBLE OPERATING EXPENDITURES RELATIVE TO ONGOING ROUTINE ACTIVITIES OF THE SYSTEM AND NOT FOR RESEARCH AND DEVELOPMENT. COBB COUNTY WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN FTA CIRCULAR 4220.1F ENSURE THAT CONTRACTORS PROCURED WILL NOT BE ON THE FTA SUSPENSION AND DEBARMENT LIST AND CERTIFIES THAT INDEPENDENT COST ESTIMATES WILL BE PREPARED AND AVAILABLE ON FILE ALONG WITH THE CORRESPONDING COST/PRICE ANALYSIS FOR PERTINENT PROJECTS INCLUDED IN THIS GRANT.COBB COUNTY AGREES THAT IF IT RECEIVES FEDERAL FUNDING FROM THE FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) OR THROUGH A PASS-THROUGH ENTITY THROUGH THE ROBERT T. STAFFORD DISASTER RELIEF AND EMERGENCY ASSISTANCE ACT A DIFFERENT FEDERAL AGENCY OR INSURANCE PROCEEDS FOR ANY PORTION OF A PROJECT ACTIVITY APPROVED FOR FTA FUNDING UNDER THIS GRANT AGREEMENT IT WILL PROVIDE WRITTEN NOTIFICATION TO FTA AND REIMBURSE FTA FOR ANY FEDERAL SHARE THAT DUPLICATES FUNDING PROVIDED BY FEMA ANOTHER FEDERAL AGENCY OR AN INSURANCE COMPANY.SAFETY AND SECURITY ARE INCLUDED AS SPECIFIC SERVICES IN THE COUNTYS CONTRACTED MAINTENANCE AND OPERATIONS PROVIDER CONTRACT. THIS INFORMATION WAS USED TO DETERMINE THAT SECURITY EXPENDITURES OF 1% OR MORE WILL BE MADE IN ALI 30.09.08. | Georgia transit (FTA federal awards) | COUNTY OF COBB | $10.4M | — |
| APPLICATION PURPOSE: THE ATLANTA-REGION TRANSIT LINK AUTHORITY REQUESTS FTA 5307 URBANIZED AREA FORMULA FUNDS TO SUPPORT THE AUTOMATED FARE COLLECTION 2.0 (AFC 2.0) PROJECT. AFC 2.0 REPLACES THE EXISTING REGIONAL BREEZE CARD AFC SYSTEM WITH THE NEW AND ENHANCED AFC CLOUD BASED OPEN PAYMENT SYSTEM.; ACTIVITIES PERFORMED: ATL WILL FUND AND MANAGE AFC 2.0 DEPLOYMENT FOR ALL REGIONAL AGENCIES.; EXPECTED OUTCOMES: KEY ELEMENTS INCLUDE: DESIGN/CONFIGURATION OF BACK OFFICE TO MEET BUSINESS RULES INSTALLATION OF NEW ONBOARD VALIDATORS/FAREBOX. INTEGRATION WITH EXISTING REGIONAL PARTNER FARE EQUIPMENT TESTING TRAINING AND QUALITY ASSURANCE.; INTENDED BENEFICIARIES: COMMUTERS AND SHIFT WORKERS IN THE ATLANTA REGION; SUBRECIPIENT ACTIVITIES: NONE | Georgia transit (FTA federal awards) | ATLANTA-REGION TRANSIT LINK AUTHORITY | $5.4M | — |
| APPLICATION PURPOSE: THIS GRANT WILL PROVIDE PLANNING ASSISTANCE TO METROPOLITAN PLANNING ORGANIZATIONS (MPOS) ACROSS THE STATE IN SUPPORT OF BOTH SHORT-TERM AND LONG-TERM TRANSIT PLANNING FOR THE PERIOD OF PERFORMANCE BEGINNING JANUARY 1 2026 CONCLUDING ON JUNE 30 2027 TO ACCOMMODATE SUBRECIPIENTS WITH A PERIOD OF PERFORMANCE JANUARY 1 2026 THROUGH DECEMBER 31 2026 AND JULY 1 2026 THROUGH JUNE 30 2027. THIS ORIGINAL APPLICATION IS TO FUND SUBRECIPIENT ARC (ATLANTA REGIONAL COMMISSION) FOR THE PERIOD OF PERFORMANCE JANUARY 1 THROUGH DECEMBER 31. THE REMAINING MPOS WILL BE AMENDED INTO THIS APPLICATION AS THE UPWPS ARE FINALIZED AND UPWP APPROVAL LETTERS ARE AVAILABLE.; ACTIVITIES PERFORMED: SECTION 5303 FUNDS WILL BE USED TO ENTER INTO CONTRACTS WITH MPOS IN GEORGIA TO FUND THEIR WORK PROGRAM AS DESCRIBED IN THE ADOPTED UNIFIED PLANNING WORK PROGRAM (UPWP) DOCUMENTS ATTACHED TO THIS APPLICATION. ; EXPECTED OUTCOMES: FUNDING WILL ENSURE THE SUBRECIPIENTS MEET APPLICABLE PLANNING REQUIREMENTS AND FUTURE PROJECTS ARE APPROPRIATELY PROGRAMMED INTO THEIR UPWPS.; INTENDED BENEFICIARIES: MPOS AND TRANSIT AGENCIES ACROSS THE STATE OF GEORGIA.; SUBRECIPIENT ACTIVITIES: SUBRECIPIENT ACTIVITIES INCLUDE:PROGRAM SUPPORT/ADMIN TO INITIATE AND MANAGE PLANNING PROGRAMS: GENERAL DEVELOPMENT/COMPREHENSIVE PLANNING: REGIONAL POLICY AND SYSTEM PLANNING FOR NON-TRANSPORTATION FUNCTIONAL AREAS PLUS THE DEVELOPMENT AND MAINTENANCE OF RELATED DATA COLLECTION AND ANALYSIS SYSTEMS DEMOGRAPHIC ANALYSIS AND NON-TRANSPORTATION MODELING AND FORECASTING ACTIVITY: LONGTERM PLANNING ACTIVITIES EMPHASIZING LONG-RANGE TRANSPORTATION SYSTEM PLANNING AND ANALYSISSHORT RANGE TRANSIT PLANNING: ACTIVITIES EMPHASIZING SHORT-RANGE TRANSPORTATION SYSTEM OR PROJECT PLANNING AND ANALYSIS PROPOSED IN THE NEXT THREE TO FIVE YEARSTRANSPORTATION IMPROVEMENT PROGRAM (TIP): ACTIVITIES EMPHASIZING TIP DEVELOPMENT AND MONITORING ANDOTHER PLANNING RELATED ACTIVITIES WHOSE PRIMARY EMPHASIS IS UNRELATED TO THE SPECIFIC TYPES OF ACTIVITIES DESCRIBED ABOVE | Georgia transit (FTA federal awards) | GEORGIA DEPARTMENT OF TRANSPORTATION | $4.0M | — |
| APPLICATION PURPOSE: THE PURPOSE OF THIS GRANT IS TO SUPPORT TRANSITS EFFORTS IN IMPROVING THE RIDERSHIP EXPERIENCE BY ADDING/UPDATING SECURITY EQUIPMENT FOR SAFETY EDUCATION AND TRAINING FOR STAFF AND A ROUTE STUDY ALONG WITH THE INTRODUCTION OF MICRO TRANSIT TRANSPORTATION SERVICES IN SOUTH AUGUSTA.; ACTIVITIES PERFORMED: FUNDS WILL BE USED TO PURCHASE/ACQUIRE NEW EQUIPMENT AND REPLACE EXISTING EQUIPMENT TRAINING AND SPECIAL STUDY OF THE ROUTE STRUCTURE. THE MICRO-TRANSIT FUNDING WILL BE UTILIZED TO PROVIDE PROJECT MANAGED SERVICES IN SOUTH AUGUSTA BY PROVIDING SCHEDULED PICK-UPS AND DROP OFFS REQUESTED BY THE RIDER.; EXPECTED OUTCOMES: THESE IMPROVEMENTS WILL IMPROVE TRANSITS RIDERSHIP EXPERIENCE BY MAKING THEM FEEL SAFE AND COMFORTABLE WITH THEIR TRANSPORTATION.; INTENDED BENEFICIARIES: TRANSIT RIDERSHIP AND FUTURE TRANSIT RIDERSHIP ALONG INCREASING STAFF EFFICIENCY IN PERFORMING THEIR DAILY DUTIES.; SUBRECIPIENT ACTIVITIES: N/A | Georgia transit (FTA federal awards) | AUGUSTA-RICHMOND COUNTY GOVERNMENT | $3.7M | — |
| APPLICATION PURPOSE: THE PURPOSE OF THIS GRANT IS TO FUND PE FOR A COBBLINC TRANSIT CENTERS IN SOUTH COBB COUNTY; ACTIVITIES PERFORMED: ACTIVITY TO BE PERFORMED IS PRELIMINARY ENGINEERING FOR THE TRANSIT CENTER.; EXPECTED OUTCOMES: EXPECTED OUTCOMES INCLUDE DEVELOPMENT OF TECHNICAL STUDIES INITIAL DRAWINGS AND PRELIMINARY COST ESTIMATES.; INTENDED BENEFICIARIES: INTENDED BENEFICIARIES ARE ULTIMATELY TRANSIT PATRONS AND THE GENERAL PUBLIC; SUBRECIPIENT ACTIVITIES: NONE. | Georgia transit (FTA federal awards) | COUNTY OF COBB | $2.0M | — |
| APPLICATION PURPOSE: THE PURPOSE OF THIS PROJECT IS TO DEVELOP A TRANSIT TRAVEL BEHAVIOR DATABASE FOR THE ATLANTA METROPOLITAN REGION THAT IS DESIGNED TO SUPPORT PERIODIC UPDATES FOR ONGOING TESTING OF ALTERNATIVE FUTURE GROWTH SCENARIOS. THE SURVEY PROVIDES A MEANS TO UPDATE AND ESTIMATE VARIOUS MODEL COMPONENTS USED IN THE ARC TRAVEL DEMAND FORECASTING PROCESS INCLUDING MODE CHOICE MODELING. THE TRANSIT RIDER TRAVEL DATA WILL SUPPLEMENT THE ARC HOUSEHOLD TRAVEL SURVEY DATA BY COLLECTING TRANSIT RIDE DATA BY PURPOSE LENGTH MODE ORIGIN-DESTINATION AND HOUSEHOLD SOCIO-ECONOMIC CHARACTERISTICS. THE SURVEY WILL COLLECT TRANSIT TRIP PATTERNS AND ASSOCIATED SOCIO-ECONOMIC CHARACTERISTICS FROM 10% OF DAILY TRANSIT RIDERSHIP REPRESENTATIVE OF WEEKDAY TRANSIT BEHAVIOR. THE SURVEY DATA WILL BE USED TO UPDATE THE ATLANTA REGIONAL STOPS MODEL. THE SIMPLIFIED TRIPS-ON-PROJECT SOFTWARE (STOPS) IS A FORECASTING TOOL DEVELOPED BY FTA.; ACTIVITIES PERFORMED: ACTIVITIES TO BE PERFORMED CENTER AROUND IMPLEMENTING A SCIENTIFIC SURVEY INCLUDING SURVEY DESIGN AND SAMPLING PLAN QUALITY ASSURANCE AND QUALITY CONTROL SURVEY INSTRUMENT DESIGN AND TRAINING ADMINISTRATION OF THE SURVEY AND SURVEY DATA ANALYTICS AND BEHAVIOR STORYTELLING AND TRAVEL DEMAND MODELING.; EXPECTED OUTCOMES: ADMINISTRATION AND IMPLEMENTATION OF A SCIENTIFIC SURVEY AND ANALYTICS TO SUPPORT THE TRAVEL MODEL ESTIMATION FOR THE MODE CHOICE MODAL COMPONENT OF THE ARC ACTIVITYSIM MODEL AS WELL AS THE ARC STOPS MODEL APPLICATION.; INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES INCLUDE TRANSPORTATION PLANNING AGENCIES OPERATORS IN THAT IT WILL PROVIDE CURRENT INFORMATION ON TRAVEL PATTERNS AND DEMOGRAPHICS FOR TRANSIT RIDERS INFORMING TRANSPORTATION PLANS . IT WILL BENEFIT THE REGION AS A WHOLE AS THE EXTENSIVE AND RECENT DATA WILL MAKE THE REGION MORE COMPETITIVE FOR FUTURE TRANSIT FUNDING OPPORTUNITIES. TRANSIT RIDERS AND THE GENERAL PUBLIC WILL BENEFIT AS PLANNERS WILL BE ABLE TO HOW RECOMMENDED SERVICE IMPROVEMENTS WILL PERFORM AND BETTER BENEFIT RIDERS THEMSELVES.; SUBRECIPIENT ACTIVITIES: NONE. | Georgia transit (FTA federal awards) | ATLANTA REGIONAL COMMISSION | $1.2M | — |
| APPLICATION PURPOSE: A PLANNING STUDY WILL BE PERFORMED TO ADVANCE THE PRIOR WORK IDENTIFIED THROUGH 1) THE MARTA FUNDED 2023 TOD MASTER PLAN FOR THE CORRIDOR 2) DISCUSSIONS WITH THE COMMUNITY AND 3) DISCUSSIONS WITH THE CITY OF ATLANTAS NEIGHBORHOOD WORKING GROUP WHICH IS A SUBCOMMITTEE OF THE MAYOR OF ATLANTAS AFFORDABLE HOUSING STRIKE FORCE.; ACTIVITIES PERFORMED: PLANNING STUDY WILL BE COMPLETED WITH THE FOLLOWING DELIVERABLES: TASK 1 - DEVELOPMENT OF A COMPREHENSIVE LIST OF COMMUNITY AND ECONOMIC DEVELOPMENT PROJECTS; TASK 2 - PRIORITIZATION OF PROPOSED PROJECTS; TASK 3 - FORMULATE RESOURCE GAP ANALYSIS; TASK 4 - IDENTIFY POTENTIAL PUBLIC PRIVATE AND PHILANTHROPIC PARTNERS; TASK 5 - STRATEGIC IMPLEMENTATION PLAN; AND TASK 6 - PRODUCTION OF A SLIDE DECK PRESENTATION.; EXPECTED OUTCOMES: THE PROPOSED STUDY HAS SIX TASKS ALL FOCUSED ON IMPROVING THE LIVES OF THE PEOPLE WHO LIVE WORK AND PLAY ALONG THIS CORRIDOR. THE AREAS OF FOCUS INCLUDE OPPORTUNITIES TO ADDRESS 1) FOOD INSECURITY 2) AFFORDABLE HOUSING AND THE UNSHELTERED 3) SMALL BUSINESS RETENTION/ATTRACTION AND OTHER ECONOMIC DEVELOPMENT 4) GREENSPACE AND STORMWATER MANAGEMENT 5) EDUCATION AND 6) TRANSIT ACCESSIBILITY.; INTENDED BENEFICIARIES: THE CAMPBELLTON COMMUNITY INVESTMENT CORRIDOR BRT WILL BE A NEW 6-MILE BRT SERVICE ON CAMPBELLTON ROAD. THE PLANNING STUDY AS WELL AS THE FUTURE BRT PROJECT WILL BENEFIT THE COMMUNITY AND MARTA PATRONS ALONG THE CORRIDOR AND SURROUNDING AREAS. IN ADDITION THE PROPOSED CORRIDOR IS HOME TO SIGNIFICANT ENVIRONMENTAL JUSTICE COMMUNITIES.; SUBRECIPIENT ACTIVITIES: NOT APPLICABLE - NO SUBRECIPIENT ACTIVITIES UNDER THIS AWARD. | Georgia transit (FTA federal awards) | METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY | $750K | — |
| APPLICATION PURPOSE: FUNDS TO COVER ARCHITECT SERVICES AND ADMINISTRATION COSTS FOR A NEW ADMINISTRATIVE BUILDING; ACTIVITIES PERFORMED: ARCHITECTURAL AND ENGINEERING SERVICES TO INCLUDE PROGRAMMING SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENTS BIDDING ASSISTANCE AND CONTRACT ADMINISTRATION FOR A NEW CHEROKEE AREA TRANSIT SERVICES (CATS) FACILITY.; EXPECTED OUTCOMES: WE EXPECT TO HIRE AN ARCHITECTURAL ENGINEER ALONG WITH COMPLIANCE OFFICER AND PROGRAM MANAGER TO ASSIST WITH THE NEW CATS ADMINISTRATIVE FACILITY WHICH ALLOW FOR GROWTH.; INTENDED BENEFICIARIES: EMPLOYEES AND RIDERS OF CHEROKEE COUNTY.; SUBRECIPIENT ACTIVITIES: N/A | Georgia transit (FTA federal awards) | CHEROKEE COUNTY BOARD OF COMMISSIONERS | $629K | — |
| APPLICATION PURPOSE: THE GOAL OF THIS AWARD IS TO EVALUATE DEVELOP AND COMPLETE A NEW FARE POLICY FOR THE AUTHORITY.; ACTIVITIES PERFORMED: A FARE POLICY STUDY IS TO BE COMPLETED INCLUDING PUBLIC ENGAGEMENT ACTIVITIES VIA A THIRD-PARTY CONSULTANT TO EVALUATE AND DEVELOP A NEW FARE POLICY FOR THE AUTHORITY.; EXPECTED OUTCOMES: A COMPLETED NEW FARE POLICY STUDY WILL WILL ASSIST THE AUTHORITY IN EVALUATING FARES AND THE RESULTING IMPACTS TO DEVELOP A POTENTIAL NEW FARE POLICY FOR MARTA.; INTENDED BENEFICIARIES: THE INTENDED BENEFICIARIES OF THE COMPLETED STUDY ARE MARTA PATRONS THAT UTILIZE THE AUTHORITYS TRANSIT SERVICES AND BENEFIT FROM THEM.; SUBRECIPIENT ACTIVITIES: NOT APPLICABLE - NO SUBRECIPIENT ACTIVITIES INCLUDED UNDER THIS AWARD. | Georgia transit (FTA federal awards) | METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY | $537K | — |
| 5307 PLANNING SPALDING CO. MOBILITY MANAGEMENT STUDY; ARC; ATLANTA GA | Georgia transit (FTA federal awards) | ATLANTA REGIONAL COMMISSION | $156K | — |
| THIS IS AN FY2022 SECTION 5307 CASH CRITICAL APPLICATION IN THE AMOUNT OF $100000 FEDERAL SHARE AND $25000 LOCAL SHARE TOTALING $125000 WILL BE USED FOR METROPOLITAN PLANNING. LOCAL MATCH FUNDS WILL COME FROM CHEROKEE COUNTY GA. CHEROKEE COUNTY WILL FOLLOW ALL 3RD PARTY PROCUREMENT POLICIES AS DEFINED IN C4220.1F (THIRD PARTY CONTRACTING GUIDANCE). CHEROKEE COUNTY WILL ENSURE CONTRACTORS PROCURED WILL NOT BE ON THE FTA SUSPENSION AND DEBARMENT LIST. 1. PURPOSE OF THE AWARD: THE PURPOSE OF THIS AWARD IS TO PROVIDE FUNDING FOR A SHORT RANGE TRANSPORTATION STUDY.2. ACTIVITIES TO BE PERFORMED: FUNDS WILL BE USED TO COVER ALL ELIGIBLE PLANNING ACTIVITIES EXPENSE TO A THIRD-PARTY CONTRACTOR TO PERFORM THE STUDIES. 3. EXTENDED OUTCOMES: FUNDING WILL PERMIT CHEROKEE COUNTY CATS TO HAVE MORE DATA ON THEIR OPERATIONS AND FUTURE NEEDS TO BEST IMPROVE TRANSPORTATION. 4. INTENDED BENEFICIARIES: CATS AND THE RIDERS THAT RELY ON ITS SERVICE WILL BENEFIT FROM IMPROVEMENTS MADE ON SERVICES AS A RESULT OF THE PLANNING STUDY.5. SUBRECIPIENT ACTIVITIES-NONETHE 5307 ATLANTA UZA SPLIT LETTER DATED 04/25/2022 IS ATTACHED IN TRAMS. THE APPLICATION IS FOR METROPOLITAN PLANNING.THIS IS CASH CRITICAL BECAUSE TO STAY ON TRACK WITH THIS PROJECTS TIMELINE WE ESTIMATE TO HAVE THIS PROJECT BE COMPLETED BY THE END OF DECEMBER 2022. | Georgia transit (FTA federal awards) | CHEROKEE COUNTY BOARD OF COMMISSIONERS | $100K | — |
| APPLICATION PURPOSE: THIS BUDGET REVISION (#8) EXTENDS THE PERFORMANCE END DATE FOR THIS GRANT ALLOWING FOR THE CONTINUATION AND CLOSEOUT OF PROJECT ACTIVITIES TO MARCH 30 2026 (2QTR2026).PROJECT SCOPE: THIS PROJECT INCLUDES SHORT RANGE TRANSIT PLANNING; PURCHASE OF FOUR (4) 40FT BUSES FOR ROUTE 403 EXPANSION; PURCHASE OF TWO (2) PARATRANSIT VEHICLES; APPRAISALS LAND ACQUISITION ENGINEERING DESIGN AND CONSTRUCTION COST FOR A MAINTENANCE FACILITY; ENGINEERING DESIGN LAND ACQUISITION AND CONSTRUCTION COSTS FOR THE SOUTHLAKE TRANSFER FACILITY; PURCHASE OF 20 SHELTERS; PURCHASE OF MOBILE FARE COLLECTION EQUIPMENT FOR BREEZE CARD; OPERATING COST FOR PARATRANSIT SERVICE; CMAQ OPERATING ASSISTANCE FOR FIXED ROUTE; PREVENTIVE MAINTENANCE COSTS; AND ACQUISITION OF SURVEILLANCE AND SECURITY EQUIPMENT. ; ACTIVITIES PERFORMED: PROJECT SCOPE: THIS PROJECT INCLUDES SHORT RANGE TRANSIT PLANNING; PURCHASE OF FOUR (4) 40FT BUSES FOR ROUTE 403 EXPANSION; PURCHASE OF TWO (2) PARATRANSIT VEHICLES; APPRAISALS LAND ACQUISITION ENGINEERING DESIGN AND CONSTRUCTION COST FOR A MAINTENANCE FACILITY; ENGINEERING DESIGN LAND ACQUISITION AND CONSTRUCTION COSTS FOR THE SOUTHLAKE TRANSFER FACILITY; PURCHASE OF 20 SHELTERS; PURCHASE OF MOBILE FARE COLLECTION EQUIPMENT FOR BREEZE CARD; OPERATING COST FOR PARATRANSIT SERVICE; CMAQ OPERATING ASSISTANCE FOR FIXED ROUTE; PREVENTIVE MAINTENANCE COSTS; AND ACQUISITION OF SURVEILLANCE AND SECURITY EQUIPMENT. PROJECT FUNDING: THIS APPLICATION INCLUDES $1110000 IN 5307 FUNDS; MATCHING FUNDS FOR THESE DOLLARS WILL BE PAID FOR 50% BY GRTA AND 50% BY CLAYTON COUNTY. ALSO INCLUDED ARE $5792000 IN CMAQ FUNDS (MINOR TIP AMENDMENT #1 TO THE FY 2006-2011 TIP PAGE 1 OF 3. REPROGRAM PREVIOUSLY FLEXED FY 2003 CMAQ FUNDS TO MEET FTA FFY 2006 GRANT APPROVAL DEADLINES); APPROVAL BY GRTA BOARD JUNE 14 2006; INCORPORATED INTO THE STIP BY REFERENCE); THE MATCHING FUNDS FOR THESE DOLLARS WILL BE PAID 50% BY GRTA AND 50% BY CLAYTON COUNTY. THE 20 % NON-FEDERAL MATCH WILL BE PROVIDED BY STATE BOND FUNDS - SMART CARD - PI # 003544-1227825.; EXPECTED OUTCOMES: EXPECTED OUTCOMES: 1. ENHANCED TRANSIT PLANNING 2. FLEET EXPANSION 3. INFRASTRUCTURE DEVELOPMENT 4. PASSENGER CONVENIENCE 5. OPERATIONAL IMPROVEMENTS 6. SAFETY AND SECURITY; INTENDED BENEFICIARIES: INTENDED BENEFICIARIES INCLUDE PUBLIC TRANSIT USERS INDIVIDUALS WITH DISABILITIES RELYING ON PARATRANSIT SERVICES AND THE BROADER COMMUNITY BENEFITING FROM IMPROVED TRANSPORTATION INFRASTRUCTURE ENHANCED SAFETY MEASURES AND ENVIRONMENTAL IMPROVEMENTS.; SUBRECIPIENT ACTIVITIES: MARTA (METROPOLITAN ATLANTA RAPID TRANSIT AUTHORITY) IS THE SUBRECIPIENT FOR ALL PROJECT ACTIVITIES OUTLINED. | Georgia transit (FTA federal awards) | GEORGIA REGIONAL TRANSPORTATION AUTHORITY | — | — |
| MAY 20 2015THE PROJECTS DOUGLAS COUNTY REQUESTS ASSISTANCE WITH IN THIS APPLICATION ARE AS FOLLOWS:1. DESIGN AND PE OF AN ADDITION TO AN EXISTING 6500 SQUARE FOOT TRANSPORTATION ADMINISTRATIVE AND CUSTOMER SERVICE BUILDING AT THE DOUGLAS COUNTY MULTI-MODAL TRANSPORTATION CENTER THAT IS ON PROPERTY OWNED BY DOUGLAS COUNTY AND PURCHASED WITH FTA FUNDS.2. CONSTRUCTION FUNDS FOR THE ADDITION TO THE DOUGLAS COUNTY MULTI-MODAL TRANSPORTATION CENTER. THE FEDERAL FUNDS REQUESTED IN THIS APPLICATION ALONG WITH THE LOCAL MATCH WILL COVER ALL COSTS ASSOCIATED WITH CONSTRUCTION OF THIS EXPANSION/ADDITION. ONCE CONSTRUCTED THE USEFUL LIFE OF THIS ADDITION TO THE DOUGLAS COUNTY TRANSPORTATION CENTER WILL BE 40 YEARS. THIS EXPANSION/ADDITION TO THE EXISTING 6500 SQUARE FOOT DOUGLAS COUNTY MULTI-MODAL TRANSPORTATION CENTER WILL BE 3000 TO 3500 SQUARE FEET AND WILL INCLUDE ADDITIONAL OFFICE SPACE A MULTI-PURPOSE TRAINING/MEETING ROOM AND A SUITE FOR FTA-MANDATED DRUG TESTING. THE OFFICE SPACE WILL BE NEEDED FOR EXTRA PERSONNEL INVOLVED IN RISK AND SAFETY OPERATIONS AND FACILITY MANAGEMENT AND NEW TRANSPORTATION SERVICES AND EXPANSION OF EXISTING TRANSPORTATION SERVICES. DOUGLAS COUNTY WILL DESIGN THIS EXPANSION/ADDITION IN 2016 WITH CONSTRUCTION ANTICIPATED DURING THE FIRST SIX MONTHS OF 2017. THIS TIMETABLE COINCIDES WITH DOUGLAS COUNTYS PLANS TO ADD SERVICES AND STAFF TO ITS TRANSPORTATION MENU IN 2017.3. DESIGN PE AND ENVIRONMENTAL FOR A MAINTENANCE FACILITY ON THE CAMPUS OF THE EXISTING TRANSPORTATION CENTER.4. DESIGN PE AND ENVIRONMENTAL OF A NEW PARK AND RIDE LOT ON LAND TO LATER BE IDENTIFIED AND PURCHASED.5. PURCHASE OF FOUR SEVEN PASSENGER VANS FOR DOUGLAS COUNTYS COMMUTER VANPOOL PROGRAM. THE USEFUL LIFE OF THESE VANS IS FOUR YEARS OR 100000 MILES.DOUGLAS COUNTYS PROJECTED TIMELINE FOR THESE PROJECTS IS AS FOLLOWS:1. DESIGN OF EXPANSION FOR TRANSPORTATION CENTER: 2016.2. CONSTRUCTION OF EXPANSION FOR TRANSPORTATION CENTER: 2017.3. DESIGN OF MAINTENANCE FACILITY: 20174. DESIGN OF NEW PARK AND RIDE LOT: 20175. PURCHASE OF FOUR SEVEN PASSENGER VANS: 2016.TIP INFO. IS ATTACHED ON PAGES 38-39.************************************** THREE PROJECTS ARE LISTED IN THIS APPLICATION:(1) THE PURCHASE OF FOUR 15-PASSENGER BUSES FOR A DEMAND RESPONSE SERVICE FOR SENIOR ADULTS. THE USEFUL LIFE OF THE BUSES IS FIVE YEARS OR 150000 MILES. (2) ADDITIONAL PARK AND RIDE FACILITES TO ADDRESS A CRITICAL NEED IN WEST DOUGLAS COUNTY. LAND NEEDS TO BE IDENTIFIED AND PURCHASED SO THIS MUCH-NEEDED FACILITY CAN BE DESIGNED AND CONSTRUCTED.3. PREVENTIVE MAINTENANCE FOR RIDESHARES FLEET OF VANS THAT DELIVER COMMUTERS TO AND FROM WORK LOCATIONS.SECTION 5307 FUNDS ARE BEING USED FOR THESE PROJECTS. THE BREAKDOWN IS AS FOLLOWS: FY 2011 - FTA FUNDS IN THE AMOUNT OF $500560. FY 2012 - FTA FUNDS IN THE AMOUNT OF $1067019. TOTAL AMOUNT OF FEDERAL FUNDS: $1567579. | Georgia transit (FTA federal awards) | DOUGLAS COUNTY BOARD OF COMMISSIONERS | $-778115 | — |
| PURPOSE: IMPROVE AIRPORT DRAINAGE/EROSION CONTROL. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT INSTALLS 4,000 FEET OF DRAINAGE IMPROVEMENTS NECESSARY TO ADEQUATELY HANDLE STORM WATER RUNOFF TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. . THIS GRANT FUNDS THE FINAL PHASE, WHICH CONSIST OF CONSTRUCTION OF 1,125 FEET OF DRAINAGE IMPROVEMENTS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SAVANNAH, GEORGIA. | Georgia aviation (FAA federal awards) | SAVANNAH AIRPORT COMMISSION | $1.6M | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN OR STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE AIRPORT MASTER PLAN NARRATIVE REPORT AND AIRPORT LAYOUT PLAN TO ADDRESS KEY ISSUES, OBJECTIVES AND GOALS PERTINENT TO THE AIRPORT'S FUTURE DEVELOPMENT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ALBANY, GEORGIA. | Georgia aviation (FAA federal awards) | CITY OF ALBANY GEORGIA | $795K | — |
| PURPOSE: UPDATE STATE/REGIONAL SYSTEM PLAN OR STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE 2018 GEORGIA AIRPORT PAVEMENT MANAGEMENT PLAN. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ATLANTA, GEORGIA. | Georgia aviation (FAA federal awards) | GEORGIA DEPARTMENT OF TRANSPORTATION | $788K | — |
| BIL FUNDS. SITE SURVEY, DESIGN AND INSTALL FOR EG/FST INDOOR EG INSTALLATION FOR MARIETTA, GA (ATLG) ARSR JCN:23007802 | Georgia aviation (FAA federal awards) | CHICKASAW STRATEGIC POINTE, LLC | $516K | — |
| SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR AUGUSTA, GA (AGS) ASR JCN: 236152 | Georgia aviation (FAA federal awards) | WELLS GLOBAL, LLC | $35K | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN OR STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE AIRPORT MASTER PLAN NARRATIVE REPORT AND AIRPORT LAYOUT PLAN TO ADDRESS KEY ISSUES, OBJECTIVES AND GOALS PERTINENT TO THE AIRPORT'S FUTURE DEVELOPMENT. . INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH COLUMBUS, GEORGIA. | Georgia aviation (FAA federal awards) | COLUMBUS AIRPORT COMMISSION | $185K | — |
| PURPOSE: CONSTRUCT AIRCRAFT RESCUE & FIRE FIGHTING BUILDING. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONSTRUCTS A 7,686 SQUARE FOOT AIRCRAFT RESCUE AND FIREFIGHTING BUILDING TO ASSIST THE AIRPORT IN MEETING SAFETY REQUIREMENTS OF 14 CFR PART 139 AND EXTEND THE LIFE OF THE EQUIPMENT BY PROTECTING IT FROM ADVERSE WEATHER CONDITIONS. . THIS GRANT FUNDS THE DESIGN PHASE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH BRUNSWICK, GEORGIA. | Georgia aviation (FAA federal awards) | GLYNN COUNTY GOVERNMENT | $379K | — |
| PURPOSE: CONDUCT/UPDATE MISCELLANEOUS STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES EXHIBIT A PROPERTY MAPS AT GENERAL AVIATION AIRPORTS WITHIN THE STATE OF GEORGIA. THIS GRANT FUNDS THE SECOND PHASE, WHICH CONSIST OF 30 EXHIBIT A UPDATES. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH ATLANTA, GEORGIA. | Georgia aviation (FAA federal awards) | GEORGIA DEPARTMENT OF TRANSPORTATION | $1.0M | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE EXISTING AIRPORT MASTER PLAN STUDY. THIS GRANT FUNDS PHASE 3, WHICH CONSISTS OF INVENTORY, FORECAST, FACILITY REQUIREMENTS, DEMAND ALTERNATIVES AND FINAL DRAWINGS. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH COLUMBUS, GEORGIA. | Georgia aviation (FAA federal awards) | COLUMBUS AIRPORT COMMISSION | $794K | — |
| ZTL ACEPS II PHASE 2 STANDBY POWER SYSTEM MODIFICATION, DESIGN AND INSTALLATION | Georgia aviation (FAA federal awards) | WELLS GLOBAL, LLC | $8.4M | — |
| ATLANTA ARTCC (ZTL) RESILIENCY PROGRAM SECURITY ENHANCEMENT PHASE I SITE SURVEY AND DESIGN | Georgia aviation (FAA federal awards) | M. C. DEAN, INC. | $5.3M | — |
| ATLANTA ATCT (ATL1) RESILIENCY PROGRAM SECURITY ENHANCEMENT PHASE I SITE SURVEY AND DESIGN. | Georgia aviation (FAA federal awards) | M. C. DEAN, INC. | $2.3M | — |
| WELLS GLOBAL WILL PROVIDE THE MANPOWER, EQUIPMENT, MATERIALS, TOOLS, AND OTHER NECESSARY RESOURCES TO DELIVER THE PRODUCTS, SERVICES, AND SYSTEMS OUTLINED IN THE ACEPS II PHASE 2 PERMANENT POWER SYSTEMS INSTALLATION DESIGN SCOPE OF WORK AT THE ATLANT | Georgia aviation (FAA federal awards) | WELLS GLOBAL, LLC | $1.9M | — |
| THE SUPPORT TASKS INCLUDE PROGRAM MANAGEMENT, FINANCIAL MANAGEMENT; ACQUISITION MANAGEMENT, AND TECHNICAL ENGINEERING SUPPORT FOR AVIATION WEATHER SYSTEMS. | Georgia aviation (FAA federal awards) | POLYCON SOLUTIONS LLC | $1.4M | — |
| DESIGN & CONSTRUCTION FUNDING FOR ATLANTA INTERNATIONAL AIRPORT ATCT (ATL) FIRE ALARM REPLACEMENT PROJECT PROJECT. | Georgia aviation (FAA federal awards) | HONEYWELL INTERNATIONAL INC | $1.4M | — |
| AHN ATCT A&E DESIGN SERVICES | Georgia aviation (FAA federal awards) | WILEY & WILSON INC | $1.0M | — |
| NEMC BUILDING (ZTL) - PHASE 1 (DESIGN ONLY) | Georgia aviation (FAA federal awards) | M. C. DEAN, INC. | $841K | — |
| JEKYLL ISLAND, GA - DESIGN AND CONSTRUCTION FOR REFURBISHING THE EXISTING VOR FACILITY IN JEKYLL ISLAND, GEORGIA IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS. | Georgia aviation (FAA federal awards) | MEJIA INTERNATIONAL GROUP CORP | $730K | — |
| ATLANTA REGIONAL OFFICE (ATL RO) RESILIENCY PROGRAM SECURITY ENHANCEMENT PHASE I SITE SURVEY AND DESIGN | Georgia aviation (FAA federal awards) | M. C. DEAN, INC. | $296K | — |
| THE CONTRACTOR MUST PROVIDE ENGINEERING PROFESSIONAL SERVICES TO SUPPORT THE FEDERAL AVIATION ADMINISTRATION PORTION OF THE BIPARTISAN INFRASTRUCTURE LAW AND REIMBURSABLE PROGRAMS IN THE EASTERN SERVICE AREA DISTRICTS IN ACCORDANCE WITH THE STATEMENT | Georgia aviation (FAA federal awards) | CGH TECHNOLOGIES INC | $291K | — |
| ISSUE FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION OF DIESEL FST AT CHAMBLEE, GA (PDK) ATCT JCN: 18028037 | Georgia aviation (FAA federal awards) | URBAN ELECTRIC, INC | $271K | — |
| THE DESIGN REVIEW AND CHECKING SYSTEM (PROJNET-DRCHECKS) IS A UNIQUE INTERNET-BASED DESIGN REVIEW AND CHECKING APPLICATION. THROUGH A SINGLE POINT OF ACCESS TO ALL PROJECT MATERIALS - BEGINNING WITH ORIGINAL DESIGN DOCUMENTS - DRCHECKS ALLOWS AUTHOR | Georgia aviation (FAA federal awards) | NATIONAL INSTITUTE OF BUILDING SCIENCES | $214K | — |
| ARCHITECT AND ENGINEERING- CONSTRUCTION: AIR TRAFFIC CONTROL TOWERS | Georgia aviation (FAA federal awards) | WALSH FEDERAL LLC | $150K | — |
| AUGUSTA ATCT (AGS) RESILIENCY PROGRAM SECURITY ENHANCEMENT PHASE I SITE SURVEY/DESIGN AND PHASE II INSTALLATION | Georgia aviation (FAA federal awards) | M. C. DEAN, INC. | $107K | — |
| ISSUE FUNDING FOR SITE SURVEY REPORT, DEVELOP DESIGN OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT MACON, GA (MCNC) ASR JCN: 18027934 | Georgia aviation (FAA federal awards) | QUAD J INC | $42K | — |
| ENGINEERING SUPPORT AND INSTALLATION SERVICES (ENGINEERING SERVICE FOR DME SN 002 UPDATED WITH THE FAA SELECTED ECPS) IAW IDIQ CLIN 3016 AND SECTION C.3.10 OF THE IDIQ SOW. | Georgia aviation (FAA federal awards) | INDRA AIR TRAFFIC, INC. | $37K | — |
| ISSUE FUNDING FOR SITE SURVEY REPORT, DEVELOP DESIGN OF OUTDOOR EG WITH SUBBASE TANK AND ERMS AT COLUMBUS, GA (CSGD) ASR JCN: 1503061 | Georgia aviation (FAA federal awards) | QUAD J INC | $6K | — |
| DESIGN FOR ATLANTA ARTCC, ZTL | Georgia aviation (FAA federal awards) | HONEYWELL INTERNATIONAL INC | — | — |
| BIL FUNDS 2024 OUTDOOR EG BASELINE FUNDING FOR SITE SURVEY, DESIGN AND INSTALL FOR POWER SYSTEM EQUIPMENT FOR MT OGLETHORPE, GA (QRP) RCAG JCN: 19003423 | Georgia aviation (FAA federal awards) | CUSA CONSULTING LLC | — | — |
| ISSUE FUNDING FOR SITE SURVEY AND DESIGN OF OUTDOOR EG WITH SUBBASE TANK AT CHAMBLEE, GA (PDK) ATCT JCN: 18028037 | Georgia aviation (FAA federal awards) | SENTINEL POWER SERVICES, LLC | — | — |
| PURPOSE: CONDUCT/UPDATE AIRPORT DRAINAGE STUDY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT CONDUCTS A NEW AIRPORT DRAINAGE STUDY. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH VALDOSTA, GEORGIA. | Georgia aviation (FAA federal awards) | CITY OF VALDOSTA | $79K | — |
| PURPOSE: CONSTRUCT NEW AIRPORT. THIS GRANT IS FUNDED BY THE CORONAVIRUS AID, RELIEF, AND ECONOMIC SECURITY ACT TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT AWARDS A STATE BLOCK GRANT PROGRAM GRANT TO THE STATE OF GEORGIA TO ADMINISTER AIRPORT IMPROVEMENT PROGRAM SUB-AWARDS FOR NONPRIMARY AIRPORTS WITHIN THE STATE. THIS PROJECT CONSTRUCTS A NEW GENERAL AVIATION AIRPORT THAT MEETS CURRENT FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS GRANT FUNDS PHASE 2, WHICH CONSISTS OF WETLAND MITIGATION. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS IN THE GEORGIA STATE BLOCK GRANT PROGRAM. | Georgia aviation (FAA federal awards) | GEORGIA DEPARTMENT OF TRANSPORTATION | $4.7M | — |
| PURPOSE: UPDATE AIRPORT MASTER PLAN. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT UPDATES THE EXISTING AIRPORT MASTER PLAN STUDY. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH SAVANNAH, GEORGIA. | Georgia aviation (FAA federal awards) | SAVANNAH AIRPORT COMMISSION | $1.3M | — |
| THIS GRANT WILL FUND THE PREPARATION OF A SERVICE DEVELOPMENT PLAN (SDP) AND ENVIRONMENTAL IMPACT STATEMENT (EIS) FOR THE ATLANTA TO SAVANNAH CORRIDOR IN PARTNERSHIP WITH FRA. THE MAIN OBJECTIVES OF AN SDP ARE TO IDENTIFY THE DRAFT PURPOSE AND NEED FOR INTERCITY PASSENGER RAIL DEVELOPMENT INCORPORATE AN ANALYSIS OF ALTERNATIVES SUPPORTED BY TECHNICAL TRANSPORTATION PLANNING AND CONCEPTUAL ENGINEERING INCORPORATE A HIGH-LEVEL ANALYSIS AND CONSIDERATION OF ENVIRONMENTAL FACTORS ASSOCIATED WITH THE ALTERNATIVES INCLUDE INPUT PROVIDED THROUGH PUBLIC INVOLVEMENT AND RELEVANT PUBLIC AGENCIES AND IDENTIFY THE GOVERNANCE STRUCTURE FOR THE IMPLEMENTATION AND OPERATION OF THE CORRIDOR.THE SDP RESULTS IN THE IDENTIFICATION OF A CORRIDOR PROJECT INVENTORY NECESSARY TO ACHIEVE THE PROPOSED SERVICE AND SERVE AS THE FOUNDATION FOR INITIATING AND PREPARING THE EIS FOR THE CORRIDOR. THE PRIMARY PURPOSE OF THE EIS, PREPARED PURSUANT TO THE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA), IS TO ENSURE AGENCIES CONSIDER THE ENVIRONMENTAL IMPACTS OF THEIR ACTIONS IN DECISION MAKING. | Georgia rail (FRA federal awards) | GEORGIA DEPARTMENT OF TRANSPORTATION | $8.0M | — |