Iowa airfield contracts
DOTContractAlert tracks 180 airfield contracts across 1 Iowa DOT region, held by 66 vendors. DES MOINES AIRPORT AUTHORITY holds the most (7).
Contracts
180
DOT regions
1
Vendors
66
Iowa airfield contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,200 Feet Of Runway 15/33 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Grant Funds | Iowa aviation (FAA federal awards) | |
| Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, Joint Filling To 4,000 Feet Of The Existing Runway 9/27 Surface To Extend The Pavement's Usef | Iowa aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Installs 1,999 Feet Of Edge Drains To Improve Runway 18/36. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associated Wit | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Runway 17/35 Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstruction To Meet Federal | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Runway 12/30 Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstruction To Meet Federal | Iowa aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 1,300 Foot Parallel Taxiway A To Eliminate The Need For Aircraft To Back-taxi On The Runway. This Grant Funds 34.09% Of The Complete Projec | Iowa aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 1,300 Foot Parallel Taxiway A To Eliminate The Need For Aircraft To Back-taxi On The Runway. This Grant Funds 65.91% Of The Complete Projec | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Runway 12/30 Southeast 200 Feet To Meet Current Federal Aviation Administration Standards. This Grant Funds The Fourth Phase, Which Consists Of | Iowa aviation (FAA federal awards) | |
| Purpose: Construct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs A 2,700 Square Yard Apron To Meet The Needs Of The Existing Users Of The Airport. Intended Beneficiary: This Grant Will Provide Federal Fundin | Iowa aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 5,200 Feet Of Runway 15/33 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Grant Funds | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 8,399 Feet Of The Existing Runway 12/30 Surface To | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Runway 12/30 Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstruction To Meet Federal | Iowa aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Performs Crack Repair And Joint Filling To 18,000 Square Yards Of The Existing Terminal Apron Surface To Ex | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting; Reconstruct Runway Lighting; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Taxiway 1 And 2 Lighting Systems That Have Reac | Iowa aviation (FAA federal awards) | |
| Purpose: Improve Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Improves 1,138 Feet Of Drainage System Controls On The Runway 20 End To Meet Federal Aviation Administration Design Standards. Th | Iowa aviation (FAA federal awards) | |
| Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 4,099 Feet Of The Existing Runway 16/34 Surface To Extend The Pavement's | Iowa aviation (FAA federal awards) | |
| Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 4,099 Feet Of The Existing Runway 16/34 Surface To Extend The Pavement's | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 1,800 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds 83.63% Of The Complete Projec | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting; Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Taxiway C Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstructi | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting; Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Taxiway A Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstructi | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 7,000 Square Yards Of The Existing South Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds 25.93% Of The Complet | Iowa aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Connector And Partial Parallel Taxiway Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstructi | Iowa aviation (FAA federal awards) | |
| Purpose: Construct Runway. Activities To Be Performed/expected Outcomes: This Project Constructs A 4000 Foot New Runway 18/36 To Meet FAA Design Standards. This Phase Funds The Acquisition Of 53 Acres Of Land Acquired April, 2023. This Gr | Iowa aviation (FAA federal awards) | |
| Purpose: Construct Runway. Activities To Be Performed/expected Outcomes: This Project Constructs A 4,000 Foot New Runway 18/36 To Meet FAA Design Standards. This Phase Funds The Acquisition Of 53 Acres Of Land Acquired In April, 2023. Thi | Iowa aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 550 Foot Parallel Taxiway From The Runway 11 Turnaround To The Apron To Eliminate The Need For Aircraft To Back-taxi On The Runway. Intend | Iowa aviation (FAA federal awards) |
DOT regions with the most airfield contracts
Vendors with the most Iowa airfield contracts
| Vendor | Contracts | Volume |
|---|---|---|
| DES MOINES AIRPORT AUTHORITY | 7 | $64.9M |
| CITY OF DUBUQUE | 7 | $18.9M |
| POLK COUNTY AVIATION AUTHORITY | 6 | $12.8M |
| CITY OF SIOUX CITY | 5 | $9.6M |
| CITY OF LAMONI | 5 | $1.8M |
| CITY OF STORM LAKE | 5 | $1.7M |
| CITY OF OSCEOLA | 5 | $1.3M |
| CEDAR RAPIDS AIRPORT COMMISSION | 4 | $16.0M |
| CITY OF AMES | 4 | $9.7M |
| CITY OF WATERLOO | 4 | $7.8M |