Idaho airfield contracts

DOTContractAlert tracks 125 airfield contracts across 1 Idaho DOT region, held by 30 vendors. BOISE, CITY OF holds the most (10).

Contracts
125
DOT regions
1
Vendors
30

Idaho airfield contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected OutcomesIdaho aviation (FAA federal awards)
Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 700 Foot Taxilane To Connect The Parallel Taxiway To A Hangar Area. This Grant Funds The Second Phase, Which Consists Of Wetland MitigatioIdaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected OutcomesIdaho aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 800 Feet Of The Existing Taxiway E Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant Will Provide FIdaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected OutcomesIdaho aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts The Runway 4/22 Thresholds To Meet Federal Aviation Administration Design Standards. This Grant Funds The Design Phase. IntenIdaho aviation (FAA federal awards)
Purpose: Install Airfield Guidance Signs; Construct Taxiway; Install Runway Vertical/visual Guidance System; Rehabilitate Runway Lighting; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Constructs A 400 FooIdaho aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 500 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Project RehabilitatesIdaho aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing/crack RepairIdaho aviation (FAA federal awards)
Purpose: Widen Taxiway; Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs An 850 Foot Taxilane To Connect Existing Taxiway A To A Future Hangar Area. This Project Widens Taxiway A An Additional 10 FeIdaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing/crack Repair ToIdaho aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway; Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 1,925 Feet Of The Existing Parallel Taxiway Pavement To Maintain The Structural Integrity Of The Pavement And To MIdaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing/crack Repair To 35,500 Square Yards Of The Existing Runway 6/2Idaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected OutcomesIdaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Rehabilitate Runway Signage/markings; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 242,000 Square Yards Of The ExisIdaho aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway; Rehabilitate Apron; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 200 Feet Of The Existing Taxiway A Pavement That Requires Rehabilitation To Ensure Safe AirfieIdaho aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway; Rehabilitate Apron; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 200 Feet Of The Existing Taxiway A Pavement That Requires Rehabilitation To Ensure Safe AirfieIdaho aviation (FAA federal awards)
Purpose: Strengthen Apron; Rehabilitate Apron; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 12,000 Square Yards Of The Existing North Cargo Apron Pavement To Maintain The Structural IntegritIdaho aviation (FAA federal awards)
Purpose: Construct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs A 13,762 Square Yard General Aviation Apron To Meet The Needs Of The Existing Users Of The Airport. This Grant Funds Phase 1, Which Consists OfIdaho aviation (FAA federal awards)
Purpose: Coronavirus Aid, Relief, And Economic Security Act Funds Awarded As Economic Relief U.s. Airports Affected By The Prevention Of, Preparation For, And Response To The COVID-19 Pandemic. Activities To Be Performed/expected Outcomes:Idaho aviation (FAA federal awards)
Purpose: Reconstruct Apron; Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing General Aviation Apron An Additional 3,000 Square Yards To Meet Federal Aviation Administration Design Standards. ThiIdaho aviation (FAA federal awards)
Purpose: Construct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs A 13,762 Square Yard Ga Apron To Meet The Needs Of The Existing Users Of The Airport. . This Grant Funds 36.7% Of The Complete Project. . ThisIdaho aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing/crack RepairIdaho aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 29,449 Square Yards Of The Existing Northeast Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The First PhaseIdaho aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing/crack Repair ToIdaho aviation (FAA federal awards)

DOT regions with the most airfield contracts

Vendors with the most Idaho airfield contracts

VendorContractsVolume
BOISE, CITY OF10$114.5M
COUNTY OF KOOTENAI9$13.6M
LEWISTON-NEZ PERCE COUNTY REGIONAL AIRPORT AUTHORITY7$15.9M
CITY OF IDAHO FALLS6$19.6M
FRIEDMAN MEMORIAL AIRPORT AUTHORITY6$12.2M
CITY OF DRIGGS6$12.0M
CITY OF TWIN FALLS6$5.2M
CITY OF MCCALL6$3.6M
CITY OF CALDWELL6$3.0M
COUNTY OF BONNER6$2.8M