Kansas airfield contracts
DOTContractAlert tracks 200 airfield contracts across 1 Kansas DOT region, held by 64 vendors. METROPOLITAN TOPEKA holds the most (9).
Contracts
200
DOT regions
1
Vendors
64
Kansas airfield contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Purpose: Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 4,200 Feet Of The Existin | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 5,000 Feet Of The Existin | Kansas aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,200 Feet Of Runway 16/34 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Grant Funds | Kansas aviation (FAA federal awards) | |
| Purpose: Obstruction Marking/lighting/removal [non-hazard]. Activities To Be Performed/expected Outcomes: This Project Removes Trees, Brush, And Other Vegetative Non-hazard Type Obstructions From The Runway 16/34 Approach And Departure Pat | Kansas aviation (FAA federal awards) | |
| Purpose: Construct Runway. Activities To Be Performed/expected Outcomes: This Project Constructs A 4,400 Foot New Primary Runway 4/22 To Enhance Wind Coverage For The Airport. This Grant Funds The Final Phase, Which Consists Of Reimburseme | Kansas aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting; Reconstruct Airport Beacon; Reconstruct Airfield Guidance Signs; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs A Replacement Runway | Kansas aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,400 Feet Of Runway 18/36 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Deb | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 5,506 Feet Of The Existing Runway 17/35 Surface To Extend The Pavement's | Kansas aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 2,653 Feet Of Runway 1/19 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Grant Funds The | Kansas aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 2,212 Feet Of Runway 10/28 To Enhance Safe Airfield Operations. This Grant Funds The Design Phase. Intended Beneficiary: This Grant Wil | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, A | Kansas aviation (FAA federal awards) | |
| Purpose: Reconstruct Airport Beacon; Install Runway Vertical/visual Guidance System; Construct Runway. Activities To Be Performed/expected Outcomes: This Project Installs New Runway 9/27 End Identifier Lights To Make The Airport More Acces | Kansas aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 4,649 Feet Of Runway 2/20 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Project Funds T | Kansas aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Installs A New Wind Cone To Improve Safety And Provide Pilots With Critical Airfield Information. . Th | Kansas aviation (FAA federal awards) | |
| Purpose: Construct Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Runway 16/34 South 1,200 Feet To Meet Federal Aviation Administration Airfield Design Standards. This Grant Funds The Final Phase, Which Consists | Kansas aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Existing Runway 17 By 186 Feet To Bring The Airport Into Conformity With Current Standards. This Grant Funds The Final Phase, | Kansas aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting; Reconstruct Taxiway Lighting; Install Runway Visual Guidance System; Reconstruct Airfield Guidance Signs. Activities To Be Performed/expected Outcomes: This Project Installs Precision Approach Path Ind | Kansas aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 200 Feet Of The Existing Taxiway F Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant Will Provide F | Kansas aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts The Runway 17 Threshold To Meet Federal Aviation Administration Design Standards. This Grant Funds The Design Phase. Intende | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Reseals 4,900 Feet Of The Existing Taxiway B Pavement And Joints To Extend ITS Useful Life. . This Grant Funds A Portion Of | Kansas aviation (FAA federal awards) | |
| Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs 900 Feet Of Hangar Taxilanes To Connect A T-hangar To The Taxiway. . This Grant Funds 50.17% Of The Total Project. This Project Is Associate | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Reseals 5,500 Feet Of The Existing Taxiway A Pavement And Joints To Extend ITS Useful Life. . This Grant Funds A Portion Of | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 5,500 Feet Of The Existing Parallel Taxiway Surface To Extend The Pavem | Kansas aviation (FAA federal awards) | |
| Purpose: Install Taxiway Signage/markings; Reconstruct Taxiway Lighting; Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Installs New Taxiway M Signage To Enhance Safety. This Project Reconstructs 4,501 Feet | Kansas aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 3,398 Feet Of The Existing | Kansas aviation (FAA federal awards) |
DOT regions with the most airfield contracts
Vendors with the most Kansas airfield contracts
| Vendor | Contracts | Volume |
|---|---|---|
| METROPOLITAN TOPEKA | 9 | $21.4M |
| COUNTY OF JOHNSON | 8 | $37.4M |
| CITY OF ATCHISON | 7 | $12.3M |
| CITY OF PITTSBURG KS | 7 | $5.3M |
| WICHITA AIRPORT AUTHORITY | 5 | $34.3M |
| LIBERAL, CITY OF | 5 | $7.1M |
| PRATT AIRPORT AUTHORITY | 5 | $2.2M |
| MCPHERSON AIRPORT AUTHORITY | 5 | $1.6M |
| KEARNY, COUNTY OF | 5 | $1.5M |
| CITY OF GARNETT | 5 | $1.3M |