Massachusetts engineering contracts
DOTContractAlert tracks 54 engineering contracts across 3 Massachusetts DOT regions, held by 32 vendors. NEPONSET VALLEY TRANSPORTATION MANAGEMENT ASSOCIATION, INC. holds the most (5). Massachusetts aviation (FAA federal awards) has the most contracts in this category (45).
Contracts
54
DOT regions
3
Vendors
32
Massachusetts engineering contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Application Purpose: Mwrta Will Use Allocated Funds To Support The Planning And Development Of ITS Blandin Hub Operations And Maintenance Expansion. Reference Estip Project Id# MWRTA011815 - Transit Transformation.; Activities Performed: Mw | Massachusetts transit (FTA federal awards) | |
| Application Purpose: This Application Is To Request Section 5311 National Rural Transit Assistance Program Funds In The Amount Of $3307546 Allocated To Neponset Valley Tma In The State Of Massachusetts To Operate The National Rural Transit | Massachusetts transit (FTA federal awards) | |
| The Purpose Of This Task Order Is To Obtain Support For The Design, Development, Certification, Verification & Integration, Application Demonstration Phases Regarding The Development Of The New Waas Safety Computer. | Massachusetts aviation (FAA federal awards) | |
| Purpose: Conduct Airport Related Environmental Assessment/plan/study; Airport Wildlife Hazard Assessment/management Plan. Activities To Be Performed/expected Outcomes: This Project Conducts An Airport Wildlife Hazard Assessment And Develop | Massachusetts aviation (FAA federal awards) | |
| Purpose: Conduct Airport Related Environmental Assessment/plan/study. Activities To Be Performed/expected Outcomes: This Project Conducts An Environmental Assessment On The Impacts Of The Proposed Projects Identified On The Airport's Layou | Massachusetts aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates An Existing Airport Master Plan Study To Reflect The Future Needs Of The Airport. . Intended Beneficiary: This Grant Will P | Massachusetts aviation (FAA federal awards) | |
| Purpose: Install Perimeter Fencing Not Required By 49 Cfr 1542. Activities To Be Performed/expected Outcomes: This Project Installs 11,500 Feet Of Wildlife Fencing To Enhance Safe Airfield Operations By Mitigating Wildlife Hazards. This Pr | Massachusetts aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates An Existing Airport Master Plan Study. This Grant Funds The Second Phase, Which Consists Of Preparation Of An Environmental Assessment | Massachusetts aviation (FAA federal awards) | |
| Purpose: Conduct Airport Related Environmental Assessment/plan/study. Activities To Be Performed/expected Outcomes: This Project Conducts An Environmental Assessment On The Impacts Of The Proposed Projects Identified On The Airport's Layou | Massachusetts aviation (FAA federal awards) | |
| Purpose: Improve Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Improves 225 Feet Of The Airport's Existing Drainage System To Eliminate Ponding On Airfield Surfaces To Meet Federal Aviation Ad | Massachusetts aviation (FAA federal awards) | |
| Purpose: Noise Mitigation Measures For Residences Within 65-69 Dnl. Activities To Be Performed/expected Outcomes: This Project Installs Insulation Noise Mitigation Measures For 1,300 Residential Dwelling Units Affected By Airport Noise Exp | Massachusetts aviation (FAA federal awards) | |
| Purpose: Noise Mitigation Measures For Residences Within 65-69 Dnl. Activities To Be Performed/expected Outcomes: This Project Installs Sound Insulation Noise Mitigation Measures For Approximately 198 Residences Affected By Airport Noise E | Massachusetts aviation (FAA federal awards) | |
| Boston (bos) Atct Facility Additional Space Project Phase 1 (site Survey / Design) | Massachusetts aviation (FAA federal awards) | |
| Boston Atct (bos) Resiliency Program Security Enhancement Phase I Site Survey And Design | Massachusetts aviation (FAA federal awards) | |
| Application Purpose: The Purpose Of This Grant Is To Support The Cape Cod Regional Transit Authority In Completion Of Comprehensive Assessment Of The Current Operations/maintenance Facility Located At 40 American Way South Dennis Ma. The As | Massachusetts transit (FTA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study. This Grant Funds Phase 2, Which Consists Of Preparation Of An Obstruction Analysis And Environm | Massachusetts aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study. This Grant Funds A Portion Of The Total Project. This Grant Is Associated With An Airport Infra | Massachusetts aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associated With Chi | Massachusetts aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study. . This Grant Funds A Portion Of The Total Project. . This Grant Is Associated With An Airport | Massachusetts aviation (FAA federal awards) | |
| Purpose: Construct/expand Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New Sponsor-owned Hangar For Aircraft Storage To Assist The Airport To Be As Self-sustaining As Possible By Generating Revenue. This | Massachusetts aviation (FAA federal awards) | |
| Purpose: Noise Mitigation Measures For Residences Within 65-69 Dnl. Activities To Be Performed/expected Outcomes: This Project Installs Insulation Noise Mitigation Measures For 1,300 Residences Affected By Airport Noise Exposure In Communi | Massachusetts aviation (FAA federal awards) | |
| Purpose: Construct/expand Snow Removal Equipment Building. Activities To Be Performed/expected Outcomes: This Project Constructs A New 2,000 Square Foot Snow Removal Equipment Storage Building To Bring The Airport Into Conformity With Curr | Massachusetts aviation (FAA federal awards) | |
| Purpose: Conduct/update Miscellaneous Study. Activities To Be Performed/expected Outcomes: This Project Conducts A New Airport-wide Aeronautical Study. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associated | Massachusetts aviation (FAA federal awards) | |
| Purpose: Noise Mitigation Measures For Residences Within 65-69 Dnl. Activities To Be Performed/expected Outcomes: This Project Installs Sound Insulation Noise Mitigation Measures For Approximately 198 Residences Affected By Airport Noise E | Massachusetts aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study. This Grant Funds Phase 2, Which Consists Of Completing A State Required Impact Analysis Of The | Massachusetts aviation (FAA federal awards) |
DOT regions with the most engineering contracts
Vendors with the most Massachusetts engineering contracts
| Vendor | Contracts | Volume |
|---|---|---|
| NEPONSET VALLEY TRANSPORTATION MANAGEMENT ASSOCIATION, INC. | 5 | $16.0M |
| TOWN OF PROVINCETOWN TOWN HALL | 4 | $2.0M |
| SCIENCE APPLICATIONS INTERNATIONAL CORPORATION | 3 | $15.6M |
| MASSACHUSETTS PORT AUTHORITY | 3 | $2.9M |
| WESTFIELD, CITY OF | 3 | $1.9M |
| M. C. DEAN, INC. | 2 | — |
| TOWN OF NANTUCKET | 2 | — |
| URBAN ELECTRIC, INC | 2 | — |
| TOWN OF ORANGE | 2 | — |
| BEVERLY AIRPORT COMMISSION | 2 | — |