Minnesota airfield contracts
DOTContractAlert tracks 203 airfield contracts across 1 Minnesota DOT region, held by 76 vendors. METROPOLITAN AIRPORTS COMMISSION holds the most (23).
Contracts
203
DOT regions
1
Vendors
76
Minnesota airfield contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Crack Repair To 3,400 Feet Of The Existing Runway 14/32 Surface To Extend The Pavement's Useful Life. . Intended | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconfigure Apron. Activities To Be Performed/expected Outcomes: This Project Reconfigures The Existing Apron To Improve Operational Efficiency. . Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associa | Minnesota aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes | Minnesota aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Performs Crack Repair To 12,484 Square Yards Of The Existin | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting; Reconstruct Taxiway Lighting; Reconstruct Airfield Guidance Signs. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Runway 15/33 Connector Taxiway Lighting System That Has Re | Minnesota aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting; Reconstruct Runway; Install Runway Vertical/visual Guidance System; Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 16 And | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway; Reconstruct Deicing Pad With Associated Facilities; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 400 Feet Of The Existing Taxiway B Pavement That Has Reached The E | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 4,855 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Project Rec | Minnesota aviation (FAA federal awards) | |
| Purpose: Conduct Airport Related Environmental Assessment/plan/study. Activities To Be Performed/expected Outcomes: This Project Conducts An Environmental Study On The Impacts Of The Proposed Turf Crosswind Runway Identified On The Airport | Minnesota aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 200 Foot Taxiway Turnaround On The Runway 31 End To Enhance The Safety Of Operations At The Airport. This Grant Funds The Design Phase. In | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway; Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 10,600 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This P | Minnesota aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 18/36 End Identifier Lights To Make The Airport More Acces | Minnesota aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes | Minnesota aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 2,900 Feet Of The Existing Taxiway P Pavement That Has Reached The End Of ITS Useful Life. This Project Reconstructs 300 Feet Of The Exis | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway; Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 4,400 Feet Of The Existing Runway 16/34 Pavement That Has Reached The End Of ITS Useful Life. This Project Reconstruc | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Runway Lighting; Rehabilitate Taxiway Lighting; Reconstruct Taxiway; Reconstruct Runway; Construct/extend/improve Safety Area. Activities To Be Performed/expected Outcomes: This Project Improves The Runway 12L/30R Safe | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 4,400 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Design Phase. Intended B | Minnesota aviation (FAA federal awards) | |
| Purpose: Construct/extend/improve Safety Area. Activities To Be Performed/expected Outcomes: This Project Constructs The Runway 31 Safety Area To Meet Standards And Enhance The Safety Of Operations At The Airport. . This Grant Funds The Fi | Minnesota aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway; Construct Service Road; Reconstruct Taxiway; Reconstruct Runway; Extend Runway; Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 1 | Minnesota aviation (FAA federal awards) | |
| Purpose: Install Taxiway Lighting. Activities To Be Performed/expected Outcomes: This Project Installs New Lighting On Taxiway B To Bring The Airport Into Conformity With Current Standards. . Intended Beneficiary: This Grant Will Provide | Minnesota aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair | Minnesota aviation (FAA federal awards) | |
| Purpose: Reseal Taxilane Pavement; Reseal/resurface Runway Pavement; Reseal Taxiway Pavement. Activities To Be Performed/expected Outcomes: This Project Reseals 1,070 Feet Of The Existing Taxiway B Joints To Extend ITS Useful Life. This Pr | Minnesota aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxilane; Rehabilitate Taxiway; Reseal/resurface Runway Pavement. Activities To Be Performed/expected Outcomes: This Project Reconstructs 68 Feet Of The Existing Taxilane G Pavement That Has Reached The End Of ITS Use | Minnesota aviation (FAA federal awards) |
DOT regions with the most airfield contracts
Vendors with the most Minnesota airfield contracts
| Vendor | Contracts | Volume |
|---|---|---|
| METROPOLITAN AIRPORTS COMMISSION | 23 | $104.1M |
| DULUTH, CITY OF | 9 | $55.6M |
| CITY OF ROCHESTER | 8 | $109.3M |
| CITY OF NEW ULM | 8 | $3.9M |
| BEMIDJI REGIONAL AIRPORT AUTHORITY COMMISSION | 6 | $9.4M |
| CHISHOLM-HIBBING AIRPORT AUTHORITY | 4 | $6.7M |
| CITY OF FOSSTON | 4 | $6.6M |
| SAINT CLOUD REGIONAL AIRPORT AUTHORITY | 4 | $5.0M |
| CITY OF HECTOR | 4 | $4.1M |
| COUNTY OF MAHNOMEN | 4 | $3.5M |