Minnesota drainage contracts

22 contracts tracked across 7 DOT regions.

Contracts
22
DOT regions
7
Distinct vendors
0

DOT regions with the most drainage contracts

Recent drainage contracts in Minnesota

TitleDOT regionVendorValueSolicitation
Construct Hwy 61 J-turns at Kingsborough Trl (north intersection), Kimbro Ave and boat dealership just north of Hwy 95 intersection in Cottage Grove; at Kingsborough Trl, repair/replace drainage and relocate fiber optic lineMnDOT ATP M—$3.5M2028-10-15
Construct Hwy 61 J-turns at Kingsborough Trl (north intersection), Kimbro Ave and boat dealership just north of Hwy 95 intersection in Cottage Grove; at Kingsborough Trl, repair/replace drainage and relocate fiber optic lineMnDOT ATP M—$3.5M2028-10-15
Construct Hwy 61 J-turns at Kingsborough Trl (north intersection), Kimbro Ave and boat dealership just north of Hwy 95 intersection in Cottage Grove; at Kingsborough Trl, repair/replace drainage and relocate fiber optic lineMnDOT ATP M—$3.5M2028-10-15
Construct Hwy 61 J-turns at Kingsborough Trl (north intersection), Kimbro Ave and boat dealership just north of Hwy 95 intersection in Cottage Grove; at Kingsborough Trl, repair/replace drainage and relocate fiber optic lineMnDOT ATP M—$3.5M2028-10-15
Replace culvert, repair drainage on Hwy 10 at 8th St in HawleyMnDOT ATP 4—$200K2027-10-15
Remove vertical curve on Hwy 7 just east of Texas Ave in St Louis Park; improve drainageMnDOT ATP M—$5.3M2027-10-15
Replace culvert on Hwy 22 near Glencoe.MnDOT ATP 8—$700K2027-10-15
Replace Hwy 247 box culvert over stream west of PlainviewMnDOT ATP 6—$900K2026-10-15
Improve Hwy 55 drainage and access from just east of Lexington Ave to just west of Dodd Rd in EaganMnDOT ATP M—$1.3M2026-10-15
Resurface Hwy 5 (Stillwater Rd) from McKnight Rd in St Paul to Lakewood Dr in Maplewood; convert from 4 to 3 lanes; improve accessibility (ADA); improve drainage; replace traffic signalsMnDOT ATP M—$3.7M2026-10-15
Repair drainage and install cable median barrier on Hwy 7 from Hwy 41 (Hazeltine Blvd) to CR 19 (Oak St) in Shorewood and from I-494 to CR 61 (Shady Oak Rd) in MinnetonkaMnDOT ATP M—$1.6M2026-10-15
Construct J-turns on Hwy 65 at 209th Ave NE, 217th Ave NE, 219th Ave NE and just south of Klondike in East Bethel; repair/replace drainage from a half mile north of Hwy 22 (Viking Blvd NE) to a quarter mile south of Hwy 74 (221st Ave NE); improve accessiMnDOT ATP M—$2.6M2026-10-15
Repair drainage and install cable median barrier on Hwy 7 from Hwy 41 (Hazeltine Blvd) to CR 19 (Oak St) in Shorewood and from I-494 to CR 61 (Shady Oak Rd) in MinnetonkaMnDOT ATP M—$1.6M2026-10-15
Repair drainage and reconstruct pond at I-494/Minnesota River in EaganMnDOT ATP M—$5.1M2026-10-15
Repair erosion at culvert opening on Hwy 13 and 22nd Ave NE in WasecaMnDOT ATP 7—$300K2026-10-15
Replace Hwy 2/CR 25 centerline culvert in BagleyMnDOT ATP 2—$1.0M2026-10-15
Repair Little Manitou culvert on Hwy 61 south of Lake and Cook county lineMnDOT ATP 1—$1.0M2026-10-15
Repair I-94 drainage from east of Hwy 95 (Stagecoach Trl N) to St Croix River in LakelandMnDOT ATP M—$1.5M2025-10-15
Replace signals, improve accessibility (ADA) and drainage on Hwy 169 at Cedar Lake Rd east ramp in St Louis Park and west ramp in MinnetonkaMnDOT ATP M—$4.2M2025-10-15
Construct dedicated left and right turn lane on Hwy 95 at Pleasant Valley Rd (CR 26) in Franconia; install lighting; build culvertMnDOT ATP M—$2.7M2025-10-15
Update signals at Hwy 61/CR B in Maplewood; improve accessibility (ADA); update drainage; improve traffic management systemMnDOT ATP M—$1.3M2025-10-15
Construct noise wall on southbound Hwy 52 from about Mendota Rd E to 49th St E in Inver Grove Heights; repair drainageMnDOT ATP M—$2.1M2025-10-15