Montana engineering contracts
DOTContractAlert tracks 43 engineering contracts across 3 Montana DOT regions, held by 26 vendors. MONTANA DEPARTMENT OF TRANSPORTATION holds the most (8). Montana aviation (FAA federal awards) has the most contracts in this category (32).
Contracts
43
DOT regions
3
Vendors
26
Montana engineering contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Bil Funding For Site Survey, Design, And Eg Installation For Great Falls, Mt (gtfj) Atct JCN:22002309 | Montana aviation (FAA federal awards) | |
| Site Survey Travel, Report And Design For The Dc Bus Demo Only For Miller Mountain, Mt (qjx) Rclr Jcn: 26001000 | Montana aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates The Airport Master Plan Narrative Report And Airport Layout Plan To Address Key Issues, Objectives And Goals Pertinent To The | Montana aviation (FAA federal awards) | |
| Purpose: Construct/rehabilitate/modify/expand Snow Removal Equipment Building. Activities To Be Performed/expected Outcomes: This Project Constructs A 3,000 Square Foot Snow Removal Equipment Building To Extend The Life Of The Equipment By | Montana aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates An Existing Airport Master Plan Study To Reflect The Future Needs Of The Airport. . Intended Beneficiary: This Grant Will P | Montana aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan Or Study. Activities To Be Performed/expected Outcomes: This Project Updates An Existing Airport Master Plan Study To Reflect The Future Needs Of The Airport. . Intended Beneficiary: This Grant Will P | Montana aviation (FAA federal awards) | |
| Purpose: Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Replaces The Airport's Wind Cone And Segmented Circle That Have Reached The End Of Their Useful Life And No Longer Meet Federal Aviation Adm | Montana aviation (FAA federal awards) | |
| Purpose: Install Weather Reporting Equipment; Install Perimeter Fencing. Activities To Be Performed/expected Outcomes: This Project Acquires And Installs A New Automated Weather Observing System Iii To Provide Site-specific Weather Informa | Montana aviation (FAA federal awards) | |
| Purpose: Install Weather Reporting Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires And Installs A New Automated Weather Observing System Iii To Provide Site-specific Weather Information. This Grant Funds Phas | Montana aviation (FAA federal awards) | |
| Application Purpose: The Purpose Of This Grant Award Is To Provide Rural Technical Assistance To Rural Transit Providers In Montana.; Activities Performed: The Activity To Be Performed Includes Hiring A 3RD Party Consultant To Develop Train | Montana transit (FTA federal awards) | |
| Purpose: Reconstruct Access Road. Activities To Be Performed/expected Outcomes: This Project Reconstructs 2,895 Feet Of The Existing Fixed Base Operator, Fuel Farm, And Hangar Development Access Road That Has Reached The End Of ITS Usefu | Montana aviation (FAA federal awards) | |
| Purpose: Acquire Land For Development. Activities To Be Performed/expected Outcomes: This Project Acquires 83.8 Acres Of Land For Future Eligible Development. This Grant Funds Phase 2, Which Acquires 4.5 Acres And The Administrative And En | Montana aviation (FAA federal awards) | |
| Purpose: Acquire Snow Removal Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires One Carrier Vehicle With Broom And Blower Snow Removal Equipment To Enhance The Airport's Ability To Clear The Priority Areas Of T | Montana aviation (FAA federal awards) | |
| Purpose: Acquire Snow Removal Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires One Self-propelled Power Broom Snow Removal Equipment To Enhance The Airport's Ability To Clear The Priority Areas Of The Airfield | Montana aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Master Plan Study/airport Layout Plan With Master Plan Narrative. This Project Funds A Portion Of The Project Whic | Montana aviation (FAA federal awards) |
DOT regions with the most engineering contracts
Vendors with the most Montana engineering contracts
| Vendor | Contracts | Volume |
|---|---|---|
| MONTANA DEPARTMENT OF TRANSPORTATION | 8 | $1.4M |
| HELENA REGIONAL AIRPORT AUTHORITY | 3 | $635K |
| CHICKASAW STRATEGIC POINTE, LLC | 3 | $50K |
| MISSOULA COUNTY AIRPORT AUTHORITY | 2 | — |
| STANTEC CONSULTING SERVICES INC. | 2 | — |
| C.N.S. COMMUNICATIONS, LLC | 2 | — |
| LAUREL AIRPORT AUTHORITY | 2 | — |
| COUNTY OF CARBON | 2 | — |
| ROSEBUD COUNTY | 2 | — |