North Carolina airfield contracts
DOTContractAlert tracks 75 airfield contracts across 1 North Carolina DOT region, held by 14 vendors. AVIATION DIVISION holds the most (14).
Contracts
75
DOT regions
1
Vendors
14
North Carolina airfield contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Purpose: Expand Access Road; Conduct Airport Related Environmental Assessment/plan/study; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Conducts An Environmental Study And Assessment To Evaluate Any Potent | North Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 2,500 Feet Of The Existing Taxiway A (south) Pavement To Extend ITS Useful Life. This Project Rehabilita | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 6,400 Foot End-around Taxiway At The Runway 18C End To Reduce The Delay Of Existing Traffic. . This Grant Funds The Fourth Phase, Whic | North Carolina aviation (FAA federal awards) | |
| Purpose: Reconfigure Apron; Install Runway Lighting; Conduct Or Update Miscellaneous Study; Construct/modify/improve/rehabilitate Hangar; Install Weather Reporting Equipment. Activities To Be Performed/expected Outcomes: This Project Award | North Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 6,450 Feet Of The Existing Taxiway D Pavement To Extend ITS Useful Life. This Project Rehabilitates 6, | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 6,400 Foot End-around Taxiway At The Runway 18C End To Reduce The Delay Of Existing Traffic. . This Grant Funds The Fifth Phase, Which | North Carolina aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Runway 5L/23R From ITS Current Airfield Location To The West In Order To Meet FAA Standards. . This Grant Funds The First Ph | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 6,400 Foot End Around Taxiway At The Runway 18C End To Reduce The Delay Of Existing Traffic. . This Grant Funds The Sixth Phase, Which | North Carolina aviation (FAA federal awards) | |
| Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Runway 5L/23R From ITS Current Airfield Location To The West To Meet Federal Aviation Administration Design Standards. . This | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Taxiway; Construct Deicing Pad With Associated Facilities; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs A 108,656 Square Yard Aircraft Deicing Pad. This Project Constructs A Ne | North Carolina aviation (FAA federal awards) | |
| Purpose: Expand Terminal; Construct Taxiway; Construct Apron; Install Perimeter Fencing. Activities To Be Performed/expected Outcomes: This Project Constructs A New 20,000 Square Yard Apron To Bring The Airport Into Conformity With Current | North Carolina aviation (FAA federal awards) | |
| Purpose: Expand Terminal; Rehabilitate Taxiway; Acquire Aircraft Rescue And Fire Fighting Vehicle. Activities To Be Performed/expected Outcomes: This Project Acquires One New Class 5, Index C Aircraft Rescue And Fire Fighting Vehicle To En | North Carolina aviation (FAA federal awards) | |
| Purpose: Shift Taxiway; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 14,905 Square Yards Of The Existing Terminal Apron Pavement That Has Reached The End Of ITS Useful Life. This Project Shifts | North Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 6,400 Feet Of The Existing Paved Taxiway D To Extend ITS Useful Life. This Project Rehabilitates The Exi | North Carolina aviation (FAA federal awards) | |
| Purpose: Expand Terminal; Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands An Existing East Apron An Additional 10,000 Square Yards To Accommodate More Passengers And Accommodate More Aircraft Operations. Th | North Carolina aviation (FAA federal awards) | |
| Purpose: Shift Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Existing Paved Runway 05R/23L By 523 Feet To Bring The Airport Into Conformity With Current Standards. This Grant Funds Phase 3, Which Consists Of Con | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Service Road; Reconstruct Airport Rotating Beacon; Construct/expand Hangar; Construct Apron; Rehabilitate Runway; Install Perimeter Fencing; Expand Apron; Conduct/update Miscellaneous Study. Activities To Be Performed/ex | North Carolina aviation (FAA federal awards) | |
| Purpose: Obstruction Marking\lighting\removal; Expand Apron; Install Weather Reporting Equipment. Activities To Be Performed/expected Outcomes: This Project Awards A State Block Grant Program Grant To The State Of North Carolina To Adminis | North Carolina aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting; Reconstruct Runway Lighting; Install Airfield Guidance Signage. This Grant Is Funded By The Coronavirus Aid, Relief, And Economic Security Act To Increase The Federal Share To 100 Percent For The Airpo | North Carolina aviation (FAA federal awards) | |
| Purpose: Shift Runway. Activities To Be Performed/expected Outcomes: This Project Shifts Existing Paved Runway 05R/23L By 523 Feet To Bring The Airport Into Conformity With Current Standards. This Grant Funds Phase 4, Which Consists Of The | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Service Road; Construct Taxiway; Construct/expand Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs 741 Feet Of A New Service Road To Provide Designated Personnel And Vehicles Accessing Airpor | North Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 1,594 Feet Of Existing Paved Taxiways F And G To Maintain The Structural Integrity Of The Pavement To Extend Their Useful Lives. Inten | North Carolina aviation (FAA federal awards) | |
| Purpose: Construct Runway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 10,000 Foot Runway 1C-19C To Reduce Delays And Accommodate More Aircraft Operations. This Grant Funds Phase 1, Which Consists Of Constru | North Carolina aviation (FAA federal awards) | |
| Purpose: Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands Existing South Apron An Additional 414,400 Square Yards To Accommodate More Aircraft Operations And Allow Access To A Broader Fleet Mix. This Grant F | North Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxiway Lighting; Construct Airport Drainage/erosion Control; Rehabilitate Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Awards A State Block Grant Program Grant To The State Of North Car | North Carolina aviation (FAA federal awards) |
DOT regions with the most airfield contracts
Vendors with the most North Carolina airfield contracts
| Vendor | Contracts | Volume |
|---|---|---|
| AVIATION DIVISION | 14 | $60.4M |
| CITY OF CHARLOTTE | 12 | $280.6M |
| RALEIGH-DURHAM AIRPORT AUTHORITY | 11 | $153.1M |
| NEW HANOVER COUNTY AIRPORT AUTHORITY | 6 | $35.1M |
| PIEDMONT TRIAD AIRPORT AUTHORITY | 5 | $41.7M |
| GREATER ASHEVILLE REGIONAL AIRPORT AUTHORITY | 5 | $18.6M |
| PITT-GREENVILLE AIRPORT AUTHORITY | 5 | $12.8M |
| COUNTY OF ONSLOW | 4 | $22.7M |
| FAYETTEVILLE, CITY OF | 4 | $14.9M |
| CITY OF CONCORD | 3 | $6.9M |