North Carolina its signals contracts

244 contracts tracked across 3 DOT regions.

Contracts
244
DOT regions
3
Distinct vendors
0

DOT regions with the most its signals contracts

Recent its signals contracts in North Carolina

TitleDOT regionVendorValueSolicitation
Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane.NCDOT Division 12—$110K—
Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7).NCDOT Division 12—$85K—
Install traffic signal.NCDOT Division 12—$40K—
Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal.NCDOT Division 12—$175K—
US 321B/NC 155/275/279 WB from US 321 SB on Ramp to US 321B NB right turn lane. Right turn lane on US 321 SB Ramp & Thru Right on NC 275 WB from US 321 SB on ramp to the right turn lane for US 321B NB, Revise Signal at US 321 SB off Ramp.NCDOT Division 12—$249K—
Install traffic signal.NCDOT Division 12———
Install traffic signal.NCDOT Division 12—$40K—
Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane.NCDOT Division 12—$110K—
Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7).NCDOT Division 12—$77K—
Maintain 8 phase signal. Remove free flow right movement from southbound NC 16 Business to create a channelized yielding right condition. Alter right turn lane on westbound NC 73 to become a through-right lane, therefore providing two through lanes.NCDOT Division 12—$135K—
Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal.NCDOT Division 12———
Install traffic signal.NCDOT Division 12—$45K—
Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7).NCDOT Division 12—$85K—
Install traffic signal.NCDOT Division 12—$40K—
Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane.NCDOT Division 12—$110K—
Maintain 8 phase signal. Remove free flow right movement from southbound NC 16 Business to create a channelized yielding right condition. Alter right turn lane on westbound NC 73 to become a through-right lane, therefore providing two through lanes.NCDOT Division 12—$210K—
Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal.NCDOT Division 12—$175K—
Install signal with queue detection on off ramp.NCDOT Division 12—$104K—
Install traffic signal.NCDOT Division 12—$45K—
Install traffic signal.NCDOT Division 12—$40K—
Install traffic signal.NCDOT Division 12—$45K—
Install signal with queue detection on off ramp.NCDOT Division 12—$104K—
Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7).NCDOT Division 12—$85K—
Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane.NCDOT Division 12—$110K—
Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal.NCDOT Division 12—$175K—
US 321B/NC 155/275/279 WB from US 321 SB on Ramp to US 321B NB right turn lane. Right turn lane on US 321 SB Ramp & Thru Right on NC 275 WB from US 321 SB on ramp to the right turn lane for US 321B NB, Revise Signal at US 321 SB off Ramp.NCDOT Division 12—$1.2M—
Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal.NCDOT Division 8—$750K—
Install new traffic signal with wood poles.NCDOT Division 8—$235K—
Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal.NCDOT Division 8—$750K—
Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal.NCDOT Division 8—$451K—
Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal.NCDOT Division 8—$683K—
Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal.NCDOT Division 8—$750K—
Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal.NCDOT Division 8—$750K—
Install new traffic signal with wood poles.NCDOT Division 8—$235K—
Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal.NCDOT Division 8—$750K—
Install new traffic signal with wood poles.NCDOT Division 8—$235K—
Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal.NCDOT Division 8—$750K—
Install traffic signal without turn lanes.NCDOT Division 9—$230K—
Install traffic signal.NCDOT Division 9—$185K—
Install 2-phase traffic signal.NCDOT Division 9—$125K—
Install traffic signal.NCDOT Division 9—$185K—
Install a traffic signal. Intersection does not have left turn lanes but experiences delay on southbound and westbound approaches. Traffic signal design should provide a delayed call exclusive left turn phase for the southbound SR 1351 approach. Signal hNCDOT Division 9—$150K—
Install dual left turn lanes. Modify traffic signal as needed.NCDOT Division 9—$460K—
Construct a right turn lane with 200 feet of storage on SR 3210 at SR 1525. Modify traffic signal to provide right-turn overlap on SR 3210 approach and FYA''s on SR 1525 approaches.NCDOT Division 9—$425K—
Install traffic signal without turn lanes.NCDOT Division 9—$230K—
Install dual left turn lanes. Modify traffic signal as needed.NCDOT Division 9—$425K—
Construct a right turn lane with 200 feet of storage on SR 3210 at SR 1525. Modify traffic signal to provide right-turn overlap on SR 3210 approach and FYA''s on SR 1525 approaches.NCDOT Division 9—$288K—
Install 2-phase traffic signal.NCDOT Division 9—$120K—
Install a traffic signal. Intersection does not have left turn lanes but experiences delay on southbound and westbound approaches. Traffic signal design should provide a delayed call exclusive left turn phase for the southbound SR 1351 approach. Signal hNCDOT Division 9—$140K—
Install signal with queue detection on off ramp.NCDOT Division 12—$104K—