North Carolina its signals contracts
244 contracts tracked across 3 DOT regions.
Contracts
244
DOT regions
3
Distinct vendors
0
DOT regions with the most its signals contracts
Recent its signals contracts in North Carolina
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane. | NCDOT Division 12 | — | $110K | — |
| Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7). | NCDOT Division 12 | — | $85K | — |
| Install traffic signal. | NCDOT Division 12 | — | $40K | — |
| Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal. | NCDOT Division 12 | — | $175K | — |
| US 321B/NC 155/275/279 WB from US 321 SB on Ramp to US 321B NB right turn lane. Right turn lane on US 321 SB Ramp & Thru Right on NC 275 WB from US 321 SB on ramp to the right turn lane for US 321B NB, Revise Signal at US 321 SB off Ramp. | NCDOT Division 12 | — | $249K | — |
| Install traffic signal. | NCDOT Division 12 | — | — | — |
| Install traffic signal. | NCDOT Division 12 | — | $40K | — |
| Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane. | NCDOT Division 12 | — | $110K | — |
| Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7). | NCDOT Division 12 | — | $77K | — |
| Maintain 8 phase signal. Remove free flow right movement from southbound NC 16 Business to create a channelized yielding right condition. Alter right turn lane on westbound NC 73 to become a through-right lane, therefore providing two through lanes. | NCDOT Division 12 | — | $135K | — |
| Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal. | NCDOT Division 12 | — | — | — |
| Install traffic signal. | NCDOT Division 12 | — | $45K | — |
| Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7). | NCDOT Division 12 | — | $85K | — |
| Install traffic signal. | NCDOT Division 12 | — | $40K | — |
| Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane. | NCDOT Division 12 | — | $110K | — |
| Maintain 8 phase signal. Remove free flow right movement from southbound NC 16 Business to create a channelized yielding right condition. Alter right turn lane on westbound NC 73 to become a through-right lane, therefore providing two through lanes. | NCDOT Division 12 | — | $210K | — |
| Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal. | NCDOT Division 12 | — | $175K | — |
| Install signal with queue detection on off ramp. | NCDOT Division 12 | — | $104K | — |
| Install traffic signal. | NCDOT Division 12 | — | $45K | — |
| Install traffic signal. | NCDOT Division 12 | — | $40K | — |
| Install traffic signal. | NCDOT Division 12 | — | $45K | — |
| Install signal with queue detection on off ramp. | NCDOT Division 12 | — | $104K | — |
| Improved Geometry: Convert split side street signal to 8 phase with protected lefts on all approaches. Relocate stop bar and median further back on eastbound E. Franklin Blvd. in order to run side street protected lefts consecutively (allows phase 3+7). | NCDOT Division 12 | — | $85K | — |
| Construct on-campus operational improvements and improvements to Signal #12-1093 in lieu of more extensive improvements to NC 127, by add additional in bound lane to pick-up area in lieu of right turn lane. | NCDOT Division 12 | — | $110K | — |
| Reasign a portion of the southbound left turn near US 29/74 to a north bound dual left turn lane on to US 29/74 west bound by removing median, restrip lanes and revise signal. | NCDOT Division 12 | — | $175K | — |
| US 321B/NC 155/275/279 WB from US 321 SB on Ramp to US 321B NB right turn lane. Right turn lane on US 321 SB Ramp & Thru Right on NC 275 WB from US 321 SB on ramp to the right turn lane for US 321B NB, Revise Signal at US 321 SB off Ramp. | NCDOT Division 12 | — | $1.2M | — |
| Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal. | NCDOT Division 8 | — | $750K | — |
| Install new traffic signal with wood poles. | NCDOT Division 8 | — | $235K | — |
| Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal. | NCDOT Division 8 | — | $750K | — |
| Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal. | NCDOT Division 8 | — | $451K | — |
| Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal. | NCDOT Division 8 | — | $683K | — |
| Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal. | NCDOT Division 8 | — | $750K | — |
| Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal. | NCDOT Division 8 | — | $750K | — |
| Install new traffic signal with wood poles. | NCDOT Division 8 | — | $235K | — |
| Construct a southbound right turn lane on US 15-501 and an exclusive eastbound right turn lane on Memorial Drive and revise the traffic signal. | NCDOT Division 8 | — | $750K | — |
| Install new traffic signal with wood poles. | NCDOT Division 8 | — | $235K | — |
| Realign SR 1208 (Page Rd) approach to US 15-501. Construct exclusive left and right turn lanes on Page Rd and a southbound right turn lane and northbound left turn lane on US 15-501. Install a wood pole traffic signal. | NCDOT Division 8 | — | $750K | — |
| Install traffic signal without turn lanes. | NCDOT Division 9 | — | $230K | — |
| Install traffic signal. | NCDOT Division 9 | — | $185K | — |
| Install 2-phase traffic signal. | NCDOT Division 9 | — | $125K | — |
| Install traffic signal. | NCDOT Division 9 | — | $185K | — |
| Install a traffic signal. Intersection does not have left turn lanes but experiences delay on southbound and westbound approaches. Traffic signal design should provide a delayed call exclusive left turn phase for the southbound SR 1351 approach. Signal h | NCDOT Division 9 | — | $150K | — |
| Install dual left turn lanes. Modify traffic signal as needed. | NCDOT Division 9 | — | $460K | — |
| Construct a right turn lane with 200 feet of storage on SR 3210 at SR 1525. Modify traffic signal to provide right-turn overlap on SR 3210 approach and FYA''s on SR 1525 approaches. | NCDOT Division 9 | — | $425K | — |
| Install traffic signal without turn lanes. | NCDOT Division 9 | — | $230K | — |
| Install dual left turn lanes. Modify traffic signal as needed. | NCDOT Division 9 | — | $425K | — |
| Construct a right turn lane with 200 feet of storage on SR 3210 at SR 1525. Modify traffic signal to provide right-turn overlap on SR 3210 approach and FYA''s on SR 1525 approaches. | NCDOT Division 9 | — | $288K | — |
| Install 2-phase traffic signal. | NCDOT Division 9 | — | $120K | — |
| Install a traffic signal. Intersection does not have left turn lanes but experiences delay on southbound and westbound approaches. Traffic signal design should provide a delayed call exclusive left turn phase for the southbound SR 1351 approach. Signal h | NCDOT Division 9 | — | $140K | — |
| Install signal with queue detection on off ramp. | NCDOT Division 12 | — | $104K | — |