North Carolina pavement contracts
50 contracts tracked across 7 DOT regions.
Contracts
50
DOT regions
7
Distinct vendors
0
DOT regions with the most pavement contracts
Recent pavement contracts in North Carolina
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| Install signage, pavement markings, and delineators to establish an internal dual-stacking operation. | NCDOT Division 2 | — | $11K | — |
| Install signage, pavement markings, and delineators to establish an internal dual-stacking operation. | NCDOT Division 2 | — | $10K | — |
| Install signage, pavement markings, and delineators to establish an internal dual-stacking operation. | NCDOT Division 2 | — | $11K | — |
| Construct additional dual stacking area on campus to extend existing asphalt pavement from Access A entrance only driveway on NC 231, along the northwest side of the school. Revise pavement markings and signing for new on-campus traffic patterns as shown | NCDOT Division 4 | — | $527K | — |
| Construct an extended dual stacking area in the parking lot near N. Pine St. Modify curbing, pavement, pavement markings, and signing at multiple locations around the school, for a new on-campus traffic pattern as shown on Figure 1 of the MSTA April 9, 2 | NCDOT Division 4 | — | $292K | — |
| Construct a new entrance only driveway on US 117 Alt and extend dual stacking area on the west side of the school. Convert driveway on SR 1979 to exit only. Revise pavement markings and signing for new on-campus traffic patterns as shown on Figure 1 of t | NCDOT Division 4 | — | $491K | — |
| Construct a two-lane stacking area, revise pavement markings, and signing for new on-campus traffic pattern as shown on Figure 1 of the MSTA July 12, 2022 study. | NCDOT Division 4 | — | $393K | — |
| Construct a two-lane stacking area between the large parking lot to the right of the school and the small parking lot in front of the school, revise pavement markings, and signing for new on-campus traffic pattern as shown on Figure 1 of the MSTA August | NCDOT Division 4 | — | $261K | — |
| Construct a two-lane stacking area around the right side of the school. Remove Accesses A and B, revise curbing, pavement markings, signing, and delineators for new on-campus traffic patterns as shown on Figures 1 and 2 of the MSTA June 2, 2022 study. | NCDOT Division 4 | — | $534K | — |
| Widen driveway and extend parking lot to allow a two-lane stacking area around the northwest side of the school. Access B to become entrance only for passenger vehicles. Access C for buses only. Revise curbing, pavement markings, signing, and delineator | NCDOT Division 4 | — | $105K | — |
| Construct a new connection between the west school driveway and the front parking lot, allowing the east school driveway to become exit only. Revise curbing, pavement markings, signing, and delineators for new on-campus traffic pattern. | NCDOT Division 4 | — | $89K | — |
| Construct an extended dual stacking area in the parking lot near N. Pine St. Modify curbing, pavement, pavement markings, and signing at multiple locations around the school, for a new on-campus traffic pattern as shown on Figure 1 of the MSTA April 9, 2 | NCDOT Division 4 | — | — | — |
| Construct additional dual stacking area on campus to extend existing asphalt pavement from Access A entrance only driveway on NC 231, along the northwest side of the school. Revise pavement markings and signing for new on-campus traffic patterns as shown | NCDOT Division 4 | — | — | — |
| Construct a new entrance only driveway on US 117 Alt and extend dual stacking area on the west side of the school. Convert driveway on SR 1979 to exit only. Revise pavement markings and signing for new on-campus traffic patterns as shown on Figure 1 of t | NCDOT Division 4 | — | — | — |
| Widen driveway and extend parking lot to allow a two-lane stacking area around the northwest side of the school. Access B to become entrance only for passenger vehicles. Access C for buses only. Revise curbing, pavement markings, signing, and delineator | NCDOT Division 4 | — | — | — |
| Construct a new entrance only driveway on US 117 Alt and extend dual stacking area on the west side of the school. Convert driveway on SR 1979 to exit only. Revise pavement markings and signing for new on-campus traffic patterns as shown on Figure 1 of t | NCDOT Division 4 | — | $491K | — |
| Construct an extended dual stacking area in the parking lot near N. Pine St. Modify curbing, pavement, pavement markings, and signing at multiple locations around the school, for a new on-campus traffic pattern as shown on Figure 1 of the MSTA April 9, 2 | NCDOT Division 4 | — | $292K | — |
| Construct additional dual stacking area on campus to extend existing asphalt pavement from Access A entrance only driveway on NC 231, along the northwest side of the school. Revise pavement markings and signing for new on-campus traffic patterns as shown | NCDOT Division 4 | — | $527K | — |
| Widen driveway and extend parking lot to allow a two-lane stacking area around the northwest side of the school. Access B to become entrance only for passenger vehicles. Access C for buses only. Revise curbing, pavement markings, signing, and delineator | NCDOT Division 4 | — | $105K | — |
| Construct additional dual stacking area on campus to extend existing asphalt pavement from Access A entrance only driveway on NC 231, along the northwest side of the school. Revise pavement markings and signing for new on-campus traffic patterns as shown | NCDOT Division 4 | — | $527K | — |
| Construct an extended dual stacking area in the parking lot near N. Pine St. Modify curbing, pavement, pavement markings, and signing at multiple locations around the school, for a new on-campus traffic pattern as shown on Figure 1 of the MSTA April 9, 2 | NCDOT Division 4 | — | $292K | — |
| Construct a new entrance only driveway on US 117 Alt and extend dual stacking area on the west side of the school. Convert driveway on SR 1979 to exit only. Revise pavement markings and signing for new on-campus traffic patterns as shown on Figure 1 of t | NCDOT Division 4 | — | $491K | — |
| Construct a two-lane stacking area between the large parking lot to the right of the school and the small parking lot in front of the school, revise pavement markings, and signing for new on-campus traffic pattern as shown on Figure 1 of the MSTA August | NCDOT Division 4 | — | $261K | — |
| Construct a two-lane stacking area, revise pavement markings, and signing for new on-campus traffic pattern as shown on Figure 1 of the MSTA July 12, 2022 study. | NCDOT Division 4 | — | $393K | — |
| Construct a new connection between the west school driveway and the front parking lot, allowing the east school driveway to become exit only. Revise curbing, pavement markings, signing, and delineators for new on-campus traffic pattern. | NCDOT Division 4 | — | $89K | — |
| Construct a two-lane stacking area around the right side of the school. Remove Accesses A and B, revise curbing, pavement markings, signing, and delineators for new on-campus traffic patterns as shown on Figures 1 and 2 of the MSTA June 2, 2022 study. | NCDOT Division 4 | — | $534K | — |
| Widen driveway and extend parking lot to allow a two-lane stacking area around the northwest side of the school. Access B to become entrance only for passenger vehicles. Access C for buses only. Revise curbing, pavement markings, signing, and delineator | NCDOT Division 4 | — | $105K | — |
| Construct on campus storage in lieu of more extensive improvements on US 21, by adding additional pavement to provide triple stacking at loading zone 1 and double stacking at loading zone 2, in lieu of turn lane on US 21 and signal modification. | NCDOT Division 11 | — | $156K | — |
| Construct on campus storage in lieu of more extensive improvements on US 21, by adding additional pavement to provide triple stacking at loading zone 1 and double stacking at loading zone 2, in lieu of turn lane on US 21 and signal modification. | NCDOT Division 11 | — | — | — |
| Construct on campus storage in lieu of more extensive improvements on US 21, by adding additional pavement to provide triple stacking at loading zone 1 and double stacking at loading zone 2, in lieu of turn lane on US 21 and signal modification. | NCDOT Division 11 | — | $156K | — |
| Construct on campus storage in lieu of more extensive improvements on US 21, by adding additional pavement to provide triple stacking at loading zone 1 and double stacking at loading zone 2, in lieu of turn lane on US 21 and signal modification. | NCDOT Division 11 | — | $156K | — |
| Install a traffic signal and modify pavement markings to provide a left turn lane. | NCDOT Division 5 | — | $145K | — |
| Install a traffic signal and modify pavement markings to provide a left turn lane. | NCDOT Division 5 | — | $130K | — |
| Install a traffic signal and modify pavement markings to provide a left turn lane. | NCDOT Division 5 | — | $145K | — |
| Install a traffic signal and modify pavement markings to provide a left turn lane. | NCDOT Division 5 | — | $145K | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | $375K | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | $375K | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | — | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | — | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | $375K | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | $375K | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | $375K | — |
| Install on campus improvements including repaving, pavement markings, and signing (MSTA Project #SCH-2022-034). | NCDOT Division 13 | — | $375K | — |
| Install pavement markings and signs as needed on the main school driveway to provide additional queue storage on campus and prevent congestion on SR 2329. Clear vegetation from northern driveway sight triangle. Project is an interim treatment while MSTA | NCDOT Division 7 | — | $7K | — |
| Install pavement markings and signs as needed on the main school driveway to provide additional queue storage on campus and prevent congestion on SR 2329. Clear vegetation from northern driveway sight triangle. Project is an interim treatment while MSTA | NCDOT Division 7 | — | $7K | — |
| Install pavement markings and signs as needed on the main school driveway to provide additional queue storage on campus and prevent congestion on SR 2329. Clear vegetation from northern driveway sight triangle. Project is an interim treatment while MSTA | NCDOT Division 7 | — | $7K | — |
| Install pavement markings and signs as needed on the main school driveway to provide additional queue storage on campus and prevent congestion on SR 2329. Clear vegetation from northern driveway sight triangle. Project is an interim treatment while MSTA | NCDOT Division 7 | — | $7K | — |
| Reconfigure the parent car rider line, the teacher parking, and implement double stacking and a two-way entrance/exit all within the existing pavement. | NCDOT Division 10 | — | $20K | — |
| Reconfigure the parent car rider line, the teacher parking, and implement double stacking and a two-way entrance/exit all within the existing pavement. | NCDOT Division 10 | — | $17K | — |
| Reconfigure the parent car rider line, the teacher parking, and implement double stacking and a two-way entrance/exit all within the existing pavement. | NCDOT Division 10 | — | $20K | — |