New Mexico airfield contracts

DOTContractAlert tracks 168 airfield contracts across 1 New Mexico DOT region, held by 42 vendors. CITY OF ALBUQUERQUE holds the most (14).

Contracts
168
DOT regions
1
Vendors
42

New Mexico airfield contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
The Subject Task Order Is Hereby Issued To Support The Airport, Safety, Design, Analysis, And Planning (asdap) Program Area (rpa). The Order Is To Provide And Support Airport Safety Database Mining And Runway Incursion Mitigation TechnicalNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway Signage/markings. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Existing Taxiways B, D, E, F, G, H, And M Markings To Extend Their Useful Lives. Intended Beneficiary: This GrantNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Existing Runway 1/19 Lighting System That Has Reached The End Of ITS Useful Life And Requires Rehabilitation To Enhance SafNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 5,700 Feet Of The Existing Taxiway A Pavement To Extend ITS Useful Life. This Grant Funds Phase 3, Which Consists Of The Final Design PNew Mexico aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Joint Filling To 8,000 Feet Of The Existing Taxiway A Surface To Extend The Pavement's Useful Life. InNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Taxiway; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 5,400 Feet Of The Existing Runway 4/22 South Surface To Extend TheNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 4,500 Feet Of The Existing Taxiway B Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Second Phase, Which ConsiNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 16,000 Square Yards Of The Existing Terminal Apron To Maintain The Structural Integrity Of The Pavement. . This Grant Funds The Design PhNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,106 Feet Of Runway 12/30 Pavement To Maintain The Structural Integrity Of The Pavement. This Grant Funds The Design Phase. Intended BNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Runway 03/21 Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstruction To Meet FederalNew Mexico aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Performs Sealing, Crack Repair, And Joint Filling To 8,100 Feet Of The Existing Taxiway B Surface To ExNew Mexico aviation (FAA federal awards)
Purpose: Improve Airport Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Installs 5,983 Feet Of Edge Drains To Protect Runway 17/35 From Deterioration To Meet Federal Aviation Administration Design StanNew Mexico aviation (FAA federal awards)
Purpose: Install Runway Vertical/visual Guidance System; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Installs New Runway 1/19 Precision Approach Path Indicators To Make The Airport More AccessiNew Mexico aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Joint Filling Of Approximately 500 Square Yards Of The Existing Aircraft Parking Apron Surface To ExtendNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 5,007 Feet Of The Existing Runway 16/34 Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds 55.8% Of Phase 3. The GranNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 3,257 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Final Phase, Which ConsisNew Mexico aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Crack Repair And Sealing To 12,000 Square Yards Of The Existing Main Apron Surface To Extend The Pavement's Useful LiNew Mexico aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 3,600 Feet Of The Existing Taxiway B Surface To Extend The Pavement's Useful Life. IntNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 2,500 Feet Of The Existing Taxiway A Connectors A1 Through A7 Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds TheNew Mexico aviation (FAA federal awards)
Purpose: Reconstruct Runway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 5,007 Feet Of The Existing Runway 16/34 Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds 43.94% Of Phase 3. This GrNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 8,018 Feet Of Runway 08/26 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Grant FundsNew Mexico aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Crack And Seal To 10,110 Square Yards Of The Existing North Apron And Associated Apron Taxiway Connections To ExtendNew Mexico aviation (FAA federal awards)
Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 7,854 Feet Of Existing Paved Runway 3/21 To Maintain The Structural Integrity And Minimize Foreign Object Debris To Extend ITS Useful LiNew Mexico aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 30,000 Square Yards Of The Existing Main ANew Mexico aviation (FAA federal awards)
Purpose: Reseal Taxiway Pavement. Activities To Be Performed/expected Outcomes: This Project Reseals 7,000 Feet Of The Existing Taxiway A Pavement And Joints At A Non Primary Airport To Extend ITS Useful Life. This Grant Funds The Final PhNew Mexico aviation (FAA federal awards)

DOT regions with the most airfield contracts

Vendors with the most New Mexico airfield contracts

VendorContractsVolume
CITY OF ALBUQUERQUE14$16.8M
COUNTY OF LEA9$8.1M
TOWN OF TAOS TOWN HALL8$11.6M
CITY OF CARLSBAD7$10.6M
CITY OF RATON7$3.2M
CITY OF ARTESIA7$2.4M
CITY OF FARMINGTON5$20.1M
VILLAGE OF RUIDOSO5$8.8M
CITY OF SANTA FE5$8.4M
TOWN OF CLAYTON5$5.0M