Oklahoma airfield contracts

DOTContractAlert tracks 169 airfield contracts across 1 Oklahoma DOT region, held by 66 vendors. TULSA AIRPORTS IMPROVEMENT TRUST holds the most (10).

Contracts
169
DOT regions
1
Vendors
66

Oklahoma airfield contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
Purpose: Install Runway Lighting; Rehabilitate Taxiway; Expand Apron; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Expands The Existing Terminal Apron An Additional 34,500 Square Yards To Meet Federal AviOklahoma aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Crack Repair And Joint Filling To 1,910 Feet Of The Existing Taxiway AOklahoma aviation (FAA federal awards)
Purpose: Rehabilitate Runway Signage/markings; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 17/35 End Identifier Lights To Make The Airport More AcceOklahoma aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconfigures Taxiways A1 Thru A5, L And K From Their Current Airfield Locations To Meet Federal Aviation Administration Design StandOklahoma aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 3,000 Feet Of The Existing Parallel TaxiwaOklahoma aviation (FAA federal awards)
Purpose: Rehabilitate Taxiway; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,000 Feet Of Runway 17/35 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object DebOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Runway 17/35 Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstruction To Meet FederalOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Reconstructs The Existing Runway 17/35 Lighting System That Has Reached The End Of ITS Useful Life And Requires Reconstruction To Meet FederalOklahoma aviation (FAA federal awards)
Purpose: Rehabilitate Runway Lighting. Activities To Be Performed/expected Outcomes: This Project Rehabilitates The Existing Runway 18/36 Lighting System That Has Reached The End Of ITS Useful Life And Requires Rehabilitation To Enhance SaOklahoma aviation (FAA federal awards)
Purpose: Rehabilitate Runway Lighting; Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs A Replacement Runway 18/36 Vertical/visual Guidance System To Make The Airport MoreOklahoma aviation (FAA federal awards)
Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 900 Foot Taxiway A Connector To Eliminate The Need For Aircraft To Back-taxi On The Runway. This Grant Funds The Second Phase, Which ConsisOklahoma aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Crack Repair And Joint FOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 3,000 Feet Of The Existing Parallel Taxiway Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds Phase One, Which ConsiOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 3,000 Feet Of The Existing Parallel Taxiway Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Second Phase, WhicOklahoma aviation (FAA federal awards)
Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 600 Foot Taxilane To Connect A Hangar Development Area To A Parallel Taxiway. . This Grant Funds The Final Phase, Which Consists Of ConstrOklahoma aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Shifts Parallel Taxiway A East From ITS Current Airfield Location To 240 Feet From Runway Centerline To Meet Federal Aviation AdminiOklahoma aviation (FAA federal awards)
Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 900 Foot Taxiway A Connector To Eliminate The Need For Aircraft To Back-taxi On The Runway. This Grant Funds The Final Phase, Which ConsistOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 2,507 Square Yards Of The Existing Terminal Apron Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant WOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 6,118 Square Yards Of The Existing Terminal Apron Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant WOklahoma aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 7,000 Square Yards Of The Existing North Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The First Phase, WhicOklahoma aviation (FAA federal awards)
Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs 4,000 Feet Of Partial Parallel Taxiway E To Eliminate The Need For Aircraft To Back-taxi On The Runway. This Grant Funds Phase 2 Which ConsisOklahoma aviation (FAA federal awards)
Purpose: Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing General Aviation Apron An Additional 4,000 Square Yards To Meet Federal Aviation Administration Design Standards. This Grant Funds 84% OOklahoma aviation (FAA federal awards)
Purpose: Rehabilitate Apron. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,945 Square Yards Of The Existing Terminal Apron Pavement To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign OOklahoma aviation (FAA federal awards)
Purpose: Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing Terminal Apron An Additional 4,000 Square Yards To Meet Federal Aviation Administration Design Standards. This Grant Funds 16% Of The ToOklahoma aviation (FAA federal awards)
Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs 4,000 Feet Of Partial Parallel Taxiway E To Eliminate The Need For Aircraft To Back-taxi On The Runway. This Grant Funds Phase One, Which ConOklahoma aviation (FAA federal awards)

DOT regions with the most airfield contracts

Vendors with the most Oklahoma airfield contracts

VendorContractsVolume
TULSA AIRPORTS IMPROVEMENT TRUST10$29.6M
OKLAHOMA CITY AIRPORT TRUST9$40.0M
ADA, CITY OF5$8.2M
CITY OF WOODWARD5$3.0M
TOWN OF BEAVER5$1.9M
OKLAHOMA DEPARTMENT OF AEROSPACE AND AERONAUTICS5$1.5M
CITY OF MUSKOGEE4$5.2M
CITY OF WATONGA4$3.3M
CITY OF SALLISAW4$2.7M
BLACKWELL TONKAWA AIRPORT AUTHORITY4$1.8M