South Carolina aviation contracts
DOTContractAlert tracks 145 aviation contracts across 1 South Carolina DOT region, held by 73 vendors. COUNTY OF BEAUFORT holds the most (12).
Contracts
145
DOT regions
1
Vendors
73
South Carolina aviation contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Replace 3 Existing Comm Towers, Shelter, And Fencing At The Qjm Facility In Owings, Sc In Accordance With The Sow, Specs And Drawings. | South Carolina aviation (FAA federal awards) | |
| A&e Contract | South Carolina aviation (FAA federal awards) | |
| Purpose: Install Perimeter Fencing Not Required By 49 Cfr 1542. Activities To Be Performed/expected Outcomes: This Project Installs 10,500 Feet Of Wildlife Fencing To Enhance Safe Airfield Operations By Mitigating Wildlife Hazards. This Pr | South Carolina aviation (FAA federal awards) | |
| Ups Equipment Purchase. JCN:18065744, Loc:gsp Asr, Greer, Sc. Cost For Eaton Equipment At Greer, Sc (gsp) Asr - Ups Replacement Project. Note $8,000.00 Will Be Charged To The Freight Task Order. | South Carolina aviation (FAA federal awards) | |
| Purpose: Acquire Land For Development. Activities To Be Performed/expected Outcomes: This Project Acquires 2.75 Acres Of Land Adjacent To The Existing Airport Property To Use For Future Eligible Airport Improvement Program Development. In | South Carolina aviation (FAA federal awards) | |
| Rsmeans Data Online Needed To Support The Development Of Accurate And Defensible Construction Cost Estimates For Nas Defense Programs (ndp) Projects. | South Carolina aviation (FAA federal awards) | |
| Facility Maintenance At Greenville-spartanburg Atct, Greer, Sc | South Carolina aviation (FAA federal awards) | |
| Purpose: Acquire Land For Development. Activities To Be Performed/expected Outcomes: This Project Acquires 0.6 Acres Of Land For Future Eligible Development. This Grant Funds The Reimbursement For The Land Acquisition Completed On June 13, | South Carolina aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Layout Plan With Master Plan Narrative. Intended Beneficiary: This Grant Will Provide Federal Funding For Airport | South Carolina aviation (FAA federal awards) | |
| Purpose: Reconstruct Passenger Boarding Bridges. Activities To Be Performed/expected Outcomes: This Project Reconstructs 15 Existing Passenger Boarding Bridges, Replaces 5 Existing Passenger Boarding Bridge Preconditioned Air Units, And Re | South Carolina aviation (FAA federal awards) | |
| Purpose: Construct/modify/improve/rehabilitate Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New 20,370 Square Foot Sponsor-owned Hangar For Aircraft Storage To Assist The Airport To Be As Self-sustaining | South Carolina aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Layout Plan With Narrative. Intended Beneficiary: This Grant Will Provide Federal Funding For Airports Associated | South Carolina aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Layout Plan With Master Plan Narrative. Intended Beneficiary: This Grant Will Provide Federal Funding For Airport | South Carolina aviation (FAA federal awards) | |
| Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A New 215 Foot Connector Taxilane To Provide Airfield Access To A Non-exclusive Hangar Development Area To Bring The Airport Into Conformity | South Carolina aviation (FAA federal awards) | |
| Purpose: Construct/expand Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New 13,200 Square Foot Sponsor-owned Hangar For Aircraft Storage/maintenance To Assist The Airport To Be As Self-sustaining As Possib | South Carolina aviation (FAA federal awards) | |
| Purpose: Reconstruct Airfield Drainage/erosion Control. Activities To Be Performed/expected Outcomes: This Project Reconstructs Drainage Structures That Have Reached The End Of Their Useful Lives. This Grant Funds The Final Phase, Which CO | South Carolina aviation (FAA federal awards) | |
| Purpose: Acquire Land For Development. Activities To Be Performed/expected Outcomes: This Project Acquires 2.42 Acres Of Land For Future Eligible Development. This Project Funds The Reimbursement Of This Project Completed In February 2025. | South Carolina aviation (FAA federal awards) | |
| Purpose: Obstruction Marking/lighting/removal. Activities To Be Performed/expected Outcomes: This Project Removes Structures And Properties Identified As Obstructions By The Federal Aviation Administration To Bring The Airport Into Conform | South Carolina aviation (FAA federal awards) | |
| Purpose: Update Airport Master Plan. Activities To Be Performed/expected Outcomes: This Project Updates The Existing Airport Layout Plan With Master Plan Narrative. Intended Beneficiary: This Grant Will Provide Federal Funding For Airport | South Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxilane. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 594 Feet Of Existing T-hangar Taxilane Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Final Phase, Which C | South Carolina aviation (FAA federal awards) | |
| Purpose: Obstruction Marking/lighting/removal. Activities To Be Performed/expected Outcomes: This Project Removes Trees Identified As Obstructions By The Federal Aviation Administration To Bring The Airport Into Conformity With Current Sta | South Carolina aviation (FAA federal awards) | |
| Purpose: Obstruction Marking/lighting/removal. Activities To Be Performed/expected Outcomes: This Project Removes Trees Identified As Obstructions By The Federal Aviation Administration To Bring The Airport Into Conformity With Current Sta | South Carolina aviation (FAA federal awards) | |
| Purpose: Construct/expand Hangar. Activities To Be Performed/expected Outcomes: This Project Constructs A New 9,570 Square Foot Hangar Building For Aircraft Storage To Assist The Airport To Be As Self-sustaining As Possible By Generating R | South Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxilane. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,500 Feet Of Existing Taxilane Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds A Portion Of Phase 2, Which Con | South Carolina aviation (FAA federal awards) | |
| Purpose: Rehabilitate Taxilane. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 4,500 Feet Of Existing Taxilane Pavement To Extend ITS Useful Life. This Grant Funds A Portion Of Phase 2, Which Consists Of Construct | South Carolina aviation (FAA federal awards) |
DOT regions with the most aviation contracts
Vendors with the most South Carolina aviation contracts
| Vendor | Contracts | Volume |
|---|---|---|
| COUNTY OF BEAUFORT | 12 | $14.4M |
| COUNTY OF RICHLAND | 7 | $3.6M |
| GREENVILLE-SPARTANBURG AIRPORT DISTRICT | 5 | $24.1M |
| OCONEE COUNTY | 5 | $3.8M |
| RICHLAND-LEXINGTON AIRPORT DISTRICT | 4 | $8.9M |
| CHARLESTON REGIONAL AIRPORT DISTRICT | 4 | $1.9M |
| AMENTUM ENVIRONMENT & ENERGY, INC. | 3 | $44.0M |
| COUNTY OF DARLINGTON | 3 | $5.1M |
| GREENVILLE AIRPORT COMMISSION | 3 | $4.2M |
| FLORENCE REGIONAL AIRPORT | 3 | $2.1M |