South Dakota airfield contracts

DOTContractAlert tracks 132 airfield contracts across 1 South Dakota DOT region, held by 41 vendors. CITY OF WATERTOWN holds the most (7).

Contracts
132
DOT regions
1
Vendors
41

South Dakota airfield contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
Purpose: Reconstruct Taxilane; Reconstruct Taxiway; Reconstruct Runway; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 3,500 Feet Of The Existing Runway 15/33 Pavement That Has Reached The End OfSouth Dakota aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack RepSouth Dakota aviation (FAA federal awards)
Purpose: Seal Taxiway Pavement Surface/pavement Joints; Install Taxiway Lighting; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints; Extend Taxiway. Activities To Be Performed/expected Outcomes: TSouth Dakota aviation (FAA federal awards)
Purpose: Construct Taxiway; Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 1,200 Foot Taxilane To Connect A Hangar Area To Taxiway A. . This Project Constructs A 400 Foot Taxiway Turnaround On TSouth Dakota aviation (FAA federal awards)
Purpose: Extend Taxiway. Activities To Be Performed/expected Outcomes: This Project Extends Taxiway B An Additional 1,280 Feet To Meet The Operational Needs Of The Airport. This Grant Funds The Design Phase. Intended Beneficiary: This GraSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Runway Lighting; Construct/install/expand Airport Lighting Vault; Reconstruct Airport Beacon; Install Runway Vertical/visual Guidance System; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes:South Dakota aviation (FAA federal awards)
Purpose: Construct Taxiway; Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 2,100 Foot Taxiway D To Provide Access To Aircraft Hangars. This Project Constructs A 825 Foot Taxilane To Connect AircSouth Dakota aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected OutcomesSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Taxilane; Extend Taxilane; Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Extends The Hangar Taxilane An Additional 350 Feet To Allow A Higher Service Volume Of AircraSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Airport Beacon; Install Runway Vertical/visual Guidance System; Rehabilitate Runway Lighting; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 13/31South Dakota aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 5,700 Square Yards Of The Existing North General Aviation Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds TheSouth Dakota aviation (FAA federal awards)
Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 3,998 Feet Of Runway 12/30 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Grant FundsSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Runway; Reconstruct Apron; Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 3,300 Square Yards Of The Existing General Aviation Apron Pavement That Has ReacSouth Dakota aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconfigures The Apron Taxiway From ITS Current Airfield Location To The Northwest To Meet Federal Aviation Administration Design StSouth Dakota aviation (FAA federal awards)
Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Crack Sealing To 6,400 Feet Of The Existing Runway 13/31 Surface To Extend The Pavement's Useful Life. . IntendedSouth Dakota aviation (FAA federal awards)
Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Taxiway Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints; Seal Taxilane Pavement Surface/pavement Joints. Activities To Be Performed/expected OutcomesSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Airport Beacon; Install Runway Vertical/visual Guidance System; Rehabilitate Runway Lighting; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 13/31South Dakota aviation (FAA federal awards)
Purpose: Shift Or Reconfigure Existing Runway. Activities To Be Performed/expected Outcomes: This Project Shifts The Runway 13/31 Thresholds To Meet Federal Aviation Administration Design Standards. This Grant Funds The First Phase, WhichSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Taxilane; Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 1,540 Square Yards Of The Existing General Aviation Apron Pavement That Has Reached The End Of ITS Useful Life. ThisSouth Dakota aviation (FAA federal awards)
Purpose: Acquire Friction Measuring Equipment. Activities To Be Performed/expected Outcomes: This Project Acquires A Replacement Friction Measuring Equipment To Maintain Runway Safety. Intended Beneficiary: This Grant Will Provide FederalSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Access Road; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 300 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Project ReconstrucSouth Dakota aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 7,692 Square Yards Of The Existing Terminal Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds Phase 1, Which ConSouth Dakota aviation (FAA federal awards)
Purpose: Construct Access Road; Construct Or Improve Parking Lot; Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 1,400 Foot Taxilane To Connect A New East Apron Area To The Existing Taxiway A. .South Dakota aviation (FAA federal awards)
Purpose: Reconstruct Apron. Activities To Be Performed/expected Outcomes: This Project Reconstructs 3,750 Square Yards Of The Existing Terminal Apron Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Design Phase.South Dakota aviation (FAA federal awards)
Purpose: Reseal Taxilane Pavement; Reconstruct Taxiway; Reseal Apron Pavement; Reseal Taxiway Pavement. Activities To Be Performed/expected Outcomes: This Project Reconstructs 1,760 Feet Of The Existing Paved Taxiway A Pavement That Has ReSouth Dakota aviation (FAA federal awards)

DOT regions with the most airfield contracts

Vendors with the most South Dakota airfield contracts

VendorContractsVolume
CITY OF WATERTOWN7$20.8M
CITY OF SPEARFISH6$6.7M
CITY OF HURON6$3.2M
SIOUX FALLS REGIONAL AIRPORT AUTHORITY5$28.3M
CITY OF PIERRE5$20.8M
CITY OF SPRINGFIELD5$4.8M
CITY OF PARKSTON5$4.4M
CITY OF YANKTON5$2.9M
CITY OF WESSINGTON SPRINGS5$2.0M
COUNTY OF LINCOLN5$2.0M