Texas consultant engineering contracts

116 contracts tracked across 15 DOT regions.

Contracts
116
DOT regions
15
Distinct vendors
0

DOT regions with the most consultant engineering contracts

Recent consultant engineering contracts in Texas

TitleDOT regionVendorValueSolicitation
MGNT & OVERSIGHT OF SAFETY PRG FY29TxDOT Dallas$1.1M2029-08-02
FY26_Lufkin District CECTxDOT Lufkin$1.9M2029-08-02
SH 183; SH 121 to Bear Creek BlvdTxDOT Fort Worth$292.8M2029-08-02
SH 183 ExpansionTxDOT Fort Worth$438.0M2029-08-02
Bonds Ranch Rd; Grade Separation at BNSFTxDOT Fort Worth$19.3M2029-06-01
CAMPO Freight StudyTxDOT Austin$200K2029-04-01
Context sensitive design 2029 Ft WorthTxDOT Fort Worth$250K2029-01-02
DISTRICTWIDE GEOTECHTxDOT Waco$100K2029-01-01
Limestone Trail Segment 2 & 3 DesignTxDOT Dallas$2.2M2028-12-02
Districtwide_CEC ServicesTxDOT Pharr$850K2028-12-02
E Rosedale; Amanda Ave to Liberty StTxDOT Fort Worth$896K2028-09-15
High Capacity Transit Study - Bundle 2TxDOT Houston$1.3M2028-08-15
VA_Pavement Related Data Collect - WATxDOT Lufkin$450K2028-08-04
TA25 Magoffin/ Piedras/ Paisano SUPTxDOT El Paso$10.3M2028-08-02
MGNT & OVERSIGHT OF SAFETY PRG FY28TxDOT Dallas$546K2028-08-01
CFI ErathTxDOT Fort Worth$310K2028-08-01
Regional Managed Lane System FY2028TxDOT Dallas$1.1M2028-08-01
CFI Palo PintoTxDOT Fort Worth$310K2028-08-01
CFI Somervell CountyTxDOT Fort Worth$310K2028-08-01
City of Dripping Springs - Crosswalk ImpTxDOT Austin$1.1M2028-07-06
Bulldog Blvd Sidewalk & Bike TrailTxDOT Amarillo$3.3M2028-06-01
Cienegas Terrace Pedestrian ImprovementsTxDOT Laredo$1.8M2028-05-13
US 70 / Hillcrest Walkability ProjectTxDOT Wichita Falls$1.1M2028-05-03
Harlingen North-South Corridor LinkTxDOT Pharr$430K2028-05-02
Santa Maria Sidewalk Improvement ProjectTxDOT Pharr$3.4M2028-05-01
TA25 Mission Valley PDN Trail Ph. 1TxDOT El Paso$12.2M2028-05-01
Various; Kings Gate and Meadow Place DrTxDOT Fort Worth$429K2028-04-05
City of Early 2025 Pedestrian PathwayTxDOT Brownwood$4.3M2028-04-05
VA from VARIOUS LOCATIONS DISTRICTWI -1TxDOT Austin$2.1M2028-04-01
SH71-From Colorado River to S.Colorado DTxDOT Austin$5.0M2028-03-07
SH71-N of Riverbend Pk to Colorado RiveTxDOT Austin$5.0M2028-03-07
IH 45: I-69 N & I-10 E (NHHIP Seg. 3C-2)TxDOT Houston$1.9B2028-03-02
IH 69 HOT Lanes: NHHIP Seg. 3C-2TxDOT Houston$43.7M2028-03-02
IH 69 at IH 10 (NHHIP 3C-2)TxDOT Houston$32.0M2028-03-02
TA25Howard Lowe Pedestrian MallTxDOT El Paso$1.3M2028-02-01
25_TA_Livingston - SidewalksTxDOT Lufkin$1.4M2028-01-05
25_TA_Coldspring - SidewalksTxDOT Lufkin$1.6M2028-01-05
Districtwide Planning StudyTxDOT Waco$12028-01-01
SL 12 from US 67 to IH 30TxDOT Dallas$20.0M2027-12-04
Wheeler Main St/Canadian St Hwy 83 SUPsTxDOT Childress$937K2027-11-02
Clarendon PED-Sidewalk Improvement 2025TxDOT Childress$260K2027-11-02
HC Pct2: Sidewalk & Crosswalk HomesteadTxDOT Houston$902K2027-10-05
Lateral Pressure StudyTxDOT Houston$557K2027-09-15
NW & SW FT WORTH SUBAREA STUDY '26TxDOT Fort Worth$300K2027-08-08
Atlanta District Safe Streets 4 All StudTxDOT Atlanta$29K2027-08-04
FY 25 Lufkin District GEC WATxDOT Lufkin$880K2027-08-02
Technology to Detect & Verify Auto OccupTxDOT Dallas$2.1M2027-08-02
FY 2023 Lufkin District GECTxDOT Lufkin$1.0M2027-08-01
Atlanta District Safe Streets 4All StudyTxDOT Atlanta$28K2027-08-01
VA: CoSA 0915-12-721; TNRTxDOT San Antonio$1.0M2027-07-03