Utah airfield contracts
DOTContractAlert tracks 102 airfield contracts across 1 Utah DOT region, held by 27 vendors. CITY OF SALT LAKE holds the most (15).
Contracts
102
DOT regions
1
Vendors
27
Utah airfield contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 5,700 Feet Of Existing Runway 18/36 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris. This Gr | Utah aviation (FAA federal awards) | |
| Purpose: Seal Taxiway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 2,850 Feet Of The Existing Taxiway C Surface To Extend The Pavement's Useful Life. Int | Utah aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 990 Feet Of The Existing Taxiway E Pavement That Has Reached The End Of ITS Useful Life. Intended Beneficiary: This Grant Will Provide F | Utah aviation (FAA federal awards) | |
| Purpose: Construct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs A 83,750 Square Yard Terminal Apron To Meet The Needs Of The Existing Users Of The Airport. This Grant Funds The First Phase, Which Consists Of | Utah aviation (FAA federal awards) | |
| Purpose: Install Runway Vertical/visual Guidance System; Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Installs A Replacement Runway 4/22 Vertical/visual Guidance System To Make The Airport More Accessible | Utah aviation (FAA federal awards) | |
| Purpose: Seal Apron Pavement Surface/pavement Joints; Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing And Crack Repair To 5,032 Feet Of The Existing Runway 13/31 Sur | Utah aviation (FAA federal awards) | |
| Purpose: Construct Apron; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A 8,900 Square Yard North General Aviation Apron To Meet The Needs Of The Existing Users Of The Airport. This Project Reco | Utah aviation (FAA federal awards) | |
| Purpose: Construct Taxiway; Reconstruct Apron; Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing West Commercial Apron An Additional 18,000 Square Yards And The South General Aviation Apron An Ad | Utah aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 6,000 Feet Of The Existing Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds The Construction Phase. Inte | Utah aviation (FAA federal awards) | |
| Purpose: Construct Apron. Activities To Be Performed/expected Outcomes: This Project Constructs A 83,750 Square Yard Terminal Apron To Meet The Needs Of The Existing Users Of The Airport. This Grant Funds The Second Phase, Which Consists O | Utah aviation (FAA federal awards) | |
| Purpose: Reconstruct Apron; Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing Terminal Apron An Additional 16,000 Square Yards To Meet Federal Aviation Administration Design Standards. This Proje | Utah aviation (FAA federal awards) | |
| Purpose: Install Runway Vertical/visual Guidance System. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 3/21 End Identifier Lights To Make The Airport More Accessible By Improving Approaches To The R | Utah aviation (FAA federal awards) | |
| Purpose: Seal Runway Pavement Surface/pavement Joints. Activities To Be Performed/expected Outcomes: This Project Performs Sealing To 6,000 Feet Of The Existing Runway 16/34 Surface To Extend The Pavement's Useful Life. . Intended Benef | Utah aviation (FAA federal awards) | |
| Purpose: Expand Apron; Obstruction Marking/lighting/removal [non-hazard]. Activities To Be Performed/expected Outcomes: This Project Expands The Existing Southeast Runup Apron To 3,395 Square Yards To Meet Federal Aviation Administration D | Utah aviation (FAA federal awards) | |
| Purpose: Install Runway Vertical/visual Guidance System; Install Miscellaneous Navaids. Activities To Be Performed/expected Outcomes: This Project Installs Replacement Runway 13/31 End Identifier Lights To Make The Airport More Accessible | Utah aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway Lighting; Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 900 Feet Of The Existing Taxiway F, From Taxiway G To Taxiway F1, Pavement That Has Reached The End Of ITS | Utah aviation (FAA federal awards) | |
| Purpose: Construct Apron. Activities To Be Performed/expected Outcomes: This Project Constructed A 46,100 Square Yard South General Aviation Apron To Meet The Needs Of The Existing Users Of The Airport. This Grant Funds A Partial Reimburse | Utah aviation (FAA federal awards) | |
| Purpose: Construct Taxilane. Activities To Be Performed/expected Outcomes: This Project Constructs A 600 Foot Taxilane To Connect A Taxiway To A New Hangar Area. . This Project Constructs A 650 Foot Taxilane To Connect An Existing Parking | Utah aviation (FAA federal awards) | |
| Purpose: Coronavirus Aid, Relief, And Economic Security Act Funds Awarded As Economic Relief U.s. Airports Affected By The Prevention Of, Preparation For, And Response To The COVID-19 Pandemic. Activities To Be Performed/expected Outcomes: | Utah aviation (FAA federal awards) | |
| Purpose: Rehabilitate Runway. Activities To Be Performed/expected Outcomes: This Project Rehabilitates 5,700 Feet Of The Existing Paved Runway 18/36 To Maintain The Structural Integrity Of The Pavement And To Minimize Foreign Object Debris | Utah aviation (FAA federal awards) | |
| Purpose: Acquire Easements/land For Approaches. Activities To Be Performed/expected Outcomes: This Project Acquires 10 Acres Of Land To Protect The Approach To Runway 4 To Bring The Airport Into Conformity With Current Standards. Intended | Utah aviation (FAA federal awards) | |
| Purpose: Construct Taxiway. Activities To Be Performed/expected Outcomes: This Project Constructs A New 265 Foot Paved Taxiway A1 To Bring The Airport Into Conformity With Current Standards. This Grant Funds The Final Phase, Which Consists | Utah aviation (FAA federal awards) | |
| Purpose: Expand Apron. Activities To Be Performed/expected Outcomes: This Project Expands The Existing General Aviation Apron By Adding 15,630 Square Yards To Bring The Airport Into Conformity With Current Standards. Intended Beneficiary: | Utah aviation (FAA federal awards) | |
| Purpose: Reconstruct Taxiway. Activities To Be Performed/expected Outcomes: This Project Reconstructs 9,300 Feet Of The Existing Paved Taxiway A Pavement That Has Reached The End Of ITS Useful Life. This Grant Funds Phase 1, Which Consists | Utah aviation (FAA federal awards) | |
| Purpose: Reseal/resurface Runway Pavement; Reseal Taxiway Pavement; Reseal Apron Pavement. Activities To Be Performed/expected Outcomes: This Project Reseals 3,500 Square Yards Of The Existing East And West Apron Pavement To Extend ITS Use | Utah aviation (FAA federal awards) |
DOT regions with the most airfield contracts
Vendors with the most Utah airfield contracts
| Vendor | Contracts | Volume |
|---|---|---|
| CITY OF SALT LAKE | 15 | $205.8M |
| CITY OF ST. GEORGE | 9 | $32.3M |
| CITY OF PROVO | 7 | $30.2M |
| CITY OF SPANISH FORK | 7 | $3.9M |
| OGDEN CITY CORPORATION | 6 | $13.4M |
| COUNTY OF GARFIELD | 6 | $1.3M |
| COUNTY OF UINTAH | 5 | $8.6M |
| HEBER CITY CORPORATION | 5 | $8.3M |
| CEDAR CITY CORP | 5 | $1.9M |
| COUNTY OF GRAND | 4 | $12.7M |