DOT contracting glossary
Last reviewed
These are short definitions of the terms that state DOTs, FHWA and USAspending use for highway construction, maintenance, consulting and federal awards. Each one links at least one regulation, statute or agency page it relies on, and the full list of sources is at the end. Federal rules apply to federal-aid work, state-funded work follows state rules, and none of this is legal advice.
Advertisement
The public notice that a DOT is seeking bids on a contract. It describes the work and its location and gives the time and place of bid opening (INDOT 2026 Standard Specifications, 101.28). On a federal-aid project, the DOT may not advertise until FHWA authorizes the work, and the advertisement and approved plans and specifications must be available to bidders at least three weeks before bid opening unless FHWA approves a shorter period for a special case (23 CFR 635.112).
Addenda issued while a contract is advertised must reach every bidder. On federal-aid work, an addendum that makes a major change to the approved plans or specifications needs FHWA approval before it is issued, unless the state has assumed that role under its stewardship and oversight agreement. For design-build, the DOT sets its own solicitation schedule, and the rule notes that typical advertising periods run six to ten weeks and can be longer on large or complicated projects (23 CFR 635.112). See construction lettings for how advertisement fits the letting cycle.
Bid opening
The public event at which a DOT opens the sealed bids received for a contract and announces them, item by item or as totals. On federal-aid work, every bid received under the advertisement must be publicly opened and announced, and the DOT may not negotiate with bidders between bid opening and award (23 CFR 635.113).
The amounts announced at bid opening are not an award. The DOT still checks the low bid for responsiveness, responsibility and unbalancing, and on federal-aid work FHWA concurs in award only after reviewing the bid tabulation (23 CFR 635.114). Where a state has assumed contract award under 23 U.S.C. 106(c), as set in its stewardship and oversight agreement, the state gives that approval itself. Design-build proposals are opened and reviewed under the terms of the solicitation instead (23 CFR 635.113).
Bid tabulation
A table of the bids received on a contract, showing each bidder's total and often its price for each item. On federal-aid work, the DOT forwards a tabulation to FHWA, certified by a responsible DOT official, with item details for at least the three lowest acceptable bids and totals for the rest (23 CFR 635.113).
Tabulations show who bid, how far apart the bids were and how each item was priced. On this site, the Enterprise plan includes TxDOT and Cook County bid tabulations, loaded by hand periodically, with each bidder's amount and rank (pricing and methodology). See how firms prepare.
Buy America
The federal-aid highway rule that iron, steel and manufactured products permanently built into a project be produced in the United States (23 CFR 635.410). For iron and steel, every manufacturing process, including the application of coatings, must take place in the United States. Under the Build America, Buy America Act, construction materials such as non-ferrous metals, plastic and polymer-based products, glass, lumber and drywall must also be produced in the United States (FHWA Build America, Buy America Q&As).
A small amount of foreign iron and steel is allowed, up to 0.1 percent of the total contract cost or $2,500, whichever is greater. When a DOT takes alternate bids, it awards on domestic iron or steel products unless that bid is more than 25 percent above the lowest bid using foreign iron or steel products (23 CFR 635.410).
FHWA can waive the requirements in limited cases, and the test for manufactured products depends on when a project's federal funds were obligated (23 CFR 635.410). FHWA's Buy America page shows what currently applies.
Change order
A written order that changes a contract after award and sets how the affected work will be paid (INDOT 2026 Standard Specifications, 101.09). Under the federal rule, major changes and major extra work on federal-aid projects need FHWA approval before they take effect, though in an emergency that approval can be oral and tentative at first (23 CFR 635.120). Other changes also need approval, which can be given after the fact.
FHWA treats a change as major when it would significantly affect the project's cost to the federal government or alter its termini, character or scope (23 CFR 635.102). A change in contract time that goes with a contract change or extra work should be submitted at the same time as that change. Force account, which pays the actual cost of labor, equipment and materials plus an amount for overhead and profit, is to be used only when strictly necessary, such as when the DOT and the contractor cannot agree on a price for a new item (23 CFR 635.120).
Where a state's stewardship and oversight agreement under 23 U.S.C. 106(c) gives it these approvals, the state gives them itself. FHWA notes that its rules on contract changes were last updated in 1991 and do not include later stewardship and oversight changes (FHWA contract changes page).
CM/GC (construction manager/general contractor)
A two-phase delivery method in which a DOT hires a contractor during design to provide preconstruction services, such as scheduling, constructability review, cost estimating and risk analysis (23 CFR 635.502). The DOT then offers that firm the construction contract only if the two agree on a price. On federal-aid work, the firm is chosen by a competitive process based on qualifications, experience, best value or other factors, and the price estimate for the entire project and any price agreement must be approved by FHWA, or by the state where it has assumed that role, before construction is authorized.
The construction phase cannot be awarded, and construction cannot start, until the NEPA environmental review is complete (23 U.S.C. 112(b)(4)). Which CM/GC approvals a state has assumed is set in its stewardship and oversight agreement, although FHWA keeps approval of the state's CM/GC procurement procedures (23 CFR 635.506). A CM/GC contract is awarded under the terms of its solicitation, not on low bid alone. See construction lettings.
Contract time
The number of workdays or calendar days a contract allows for completing the work, including authorized time extensions (23 CFR 635.102). Some DOTs state a completion date instead (INDOT 2026 Standard Specifications, 101.15).
On federal-aid projects where FHWA has kept that oversight, a time extension the DOT grants is subject to FHWA concurrence (23 CFR 635.121), and the state's stewardship and oversight agreement shows who acts. Each day the work runs past the contract time can be charged as liquidated damages.
A construction contract's end date tells you when the work should finish, not when the same work will be bid again. On this site, many end dates are planned completion dates, and the methodology notes that some sources publish an estimate rather than a fixed date. See construction lettings and reading a record.
Davis-Bacon prevailing wages
The federal requirement that laborers and mechanics on federally funded or assisted construction be paid at least the locally prevailing wages set by the Secretary of Labor. On federal-aid highway construction, section 113 of title 23 applies it to contractors and subcontractors, and the wage rates must appear in each bid advertisement, bid form and contract. The federal-aid contract provisions apply it to projects over $2,000 within the right-of-way of a federal-aid highway (Form FHWA-1273).
Roads functionally classified as local roads or rural minor collectors are not federal-aid highways, so projects on them are exempt (23 U.S.C. 101). The exception is work that a law requires to be treated as on a federal-aid highway, such as Surface Transportation Block Grant projects other than recreational trails and projects funded under 23 U.S.C. 117 and 167 (Form FHWA-1273).
As of November 2026, DOTs no longer have to physically attach Form FHWA-1273 to each contract, a requirement that ended June 10, 2026, but the requirements it sets out still apply, with Davis-Bacon in Section III (Form FHWA-1273, sections I and III). Department of Labor rules in 29 CFR parts 1, 3 and 5 also apply (FHWA Davis-Bacon page). When a federal-aid ID/IQ contract is extended, the prevailing wage determination in effect when the extension is executed applies (23 CFR 635.604).
DBE (disadvantaged business enterprise)
A for-profit small business that is at least 51 percent owned by one or more socially and economically disadvantaged individuals who also control its management and daily business operations (49 CFR 26.5). When a federally assisted contract has a DBE goal, the DOT may award it only to a bidder that meets the goal or documents adequate good faith efforts to meet it (49 CFR 26.53).
Bidders show that they meet a contract goal, or the good faith efforts they made, in the way the solicitation sets, either as a matter of responsiveness or no later than five days after bid opening (49 CFR 26.53). On negotiated procurements such as professional services, a firm can make a binding commitment to meet the goal with its proposal and give the details before final selection. On a design-build project solicited with minimal project details, the DOT can instead have proposers meet the goal with an open-ended DBE performance plan (49 CFR 26.53). In consultant selection, a DOT can score DBE participation only as a nominal evaluation factor, and DBE participation and local presence together may count for no more than 10 percent of the evaluation criteria. Where race-neutral measures will not meet its DBE goals, the DOT can set a contract DBE goal instead (23 CFR 172.7).
An interim final rule of October 2025 and a final rule effective September 25, 2026 removed the program's presumptions of disadvantage based on race or sex, so each owner now shows disadvantage individually (Federal Register final rule). As of November 2026, a DOT may not set contract goals or count DBE participation until the unified certification program (UCP) covering it finishes reevaluating existing DBEs (49 CFR 26.51(h) and 26.55(i)). The deadline in 49 CFR 26.111(c) is December 24, 2026, unless USDOT grants the UCP a one-time extension of up to 90 days. Check the state DOT's current DBE notices before relying on a goal.
Design-bid-build
The traditional delivery method, in which the design is finished first and construction is then bid as a separate contract (23 CFR 636.103). On federal-aid work, the construction contract goes to the lowest responsive bid from a responsible bidder (23 CFR 635.114).
Competitive bidding with low-bid award is the default for federal-aid construction. Design-build, CM/GC and ID/IQ are exceptions, and a DOT awards them under the terms of its solicitation (23 CFR 635.104 and 635.114). A DOT can also use another method, such as doing the work with its own forces, when it shows FHWA that the method is more cost effective or that an emergency exists (23 U.S.C. 112(b)(1) and 23 CFR 635.104). See four kinds of work.
Design-build
A single contract under which one firm or team both designs and builds a project, and may also maintain, operate or finance it (23 CFR 636.103). Selection can be in two phases, a request for qualifications to shortlist teams and then a request for proposals, or in one phase on proposals alone. Award follows the terms of the solicitation, which can mean best value rather than low bid.
On federal-aid work, a DOT may use any procurement process its state and local law permit, and final design and physical construction cannot start until the NEPA review is complete (23 U.S.C. 112(b)(3) and 23 CFR 636.109). A DOT may pay a stipend to unsuccessful offerors (23 CFR 636.103). See construction lettings.
Engineer's estimate
The DOT's own estimate of what a contract's work should cost, prepared with the plans and specifications before bids are opened. After bid opening, the DOT compares the bids with it, especially the low bidder's unit prices, to judge whether the low bid is reasonable (23 CFR 635.114).
On federal-aid work, the estimate must be detailed enough to permit an effective review and comparison of the bids received (23 CFR 630.205). A bid with extreme variations from it, or with obvious unbalancing of unit prices, must be thoroughly evaluated before award (23 CFR 635.114 and FHWA's bid analysis guidance).
On this site, the value on a TxDOT project row is TxDOT's estimated low bid, or its sealed engineer's estimate when no low-bid estimate is given. It is a forecast, not a contract amount. These rows are on the TxDOT district pages listed on the Texas page. See reading a record.
Federal-aid project
A transportation project funded in part with federal money under title 23 of the United States Code, usually carried out by a state DOT under a project agreement with FHWA. The agreement is the federal government's contractual commitment to pay its share. Work generally has to be authorized by FHWA before it starts for its costs to be eligible.
Federal-aid status is what makes the federal rules in this glossary apply, such as competitive bidding, Buy America, Davis-Bacon wages and DBE rules. State-funded work follows state law, which varies by state. See four kinds of work.
Under 23 U.S.C. 106(c), a state assumes FHWA's responsibilities for design, plans, specifications, estimates, contract awards and inspection on projects off the National Highway System unless it decides that is not appropriate, and it may assume them on NHS projects unless FHWA decides otherwise. FHWA may not assign them on projects it places in a high-risk category. The state's stewardship and oversight agreement sets the extent, so who approves what can differ by state and by project.
Grant agreement
The legal instrument for a federal award of financial assistance, used when the main purpose is to transfer money or other value to a recipient for a public purpose and the agency does not expect substantial involvement (title 31, section 6304). A procurement contract is used instead when the government is buying property or services for its own direct benefit or use (section 6303).
FHWA uses financial assistance to fund states for public roads, and states then spend it through their own construction and consultant contracts. On USAspending, an award's value is measured by its obligations, which are promises to spend, and its outlays, which are payments made (USAspending spending guide). See federal grants.
On this site, USAspending awards are labeled direct contract even when they are grants, and their values are often multi-year totals. The award type on the source record shows whether it is a grant or a contract. See reading a record.
ID/IQ contract
An indefinite delivery/indefinite quantity contract: an open-ended quantity of work over a fixed period, used for a recurring need whose exact quantities are left open above any specified minimum (23 CFR 635.602). Bidders price estimated quantities of standard work items. The DOT then issues work orders that set the location, timing, scope and pay items for each job.
On federal-aid construction, the initial term plus all extensions may not exceed five years, each extension can be no longer than the initial term, and under the federal rule extensions need FHWA concurrence. When a DOT awards several ID/IQ contracts for the same work, it assigns work orders on lowest cost or lowest cost plus time, not by rotation (23 CFR 635.604). Some state-funded contracts guarantee no minimum at all, NCDOT's guardrail contract D3POC0247 among them (NCDOT proposal D3POC0247).
DOTs also call these job order, master, on-call, push-button, stand-by or task order contracts. Because the term is limited, to five years on federal-aid work and by the contract and state rules on state-funded work, the same work comes back to bid on a cycle, as covered in maintenance term contracts.
Job order contract (JOC)
A form of ID/IQ contract in which the DOT supplies a book of unit prices for standard tasks, and bidders compete on a multiplier or adjustment factor applied to those prices (23 CFR 635.602). The DOT then orders individual jobs as needed during the term.
Missouri DOT, for example, uses job order contracts for on-call maintenance repair such as asphalt and concrete pavement, guardrail and guard cable, bridge and fence work, and it is not bound to issue a minimum or maximum number of job orders. Its policy guide sets a standard term of two years, running July 1 to June 30 (MoDOT Engineering Policy Guide 147.3). Its 2026 guardrail repair provisions reach that as a one-year term with one optional one-year extension, as described in maintenance term contracts.
Federal-aid JOCs follow the same five-year limit as other ID/IQ contracts (23 CFR 635.604).
Letting
The official receipt and opening of bids on a set of contracts at a scheduled event, and the determination of the apparent low bidder on each (TxDOT contract letting page). A letting can cover both construction and maintenance contracts.
DOTs publish letting schedules in advance. TxDOT, for example, holds its statewide letting in Austin on two consecutive days each month and posts the dates on its letting page. The guide compares state schedules in construction lettings.
On this site, TxDOT project rows, on the TxDOT district pages listed on the Texas page, carry an estimated let date but no end date. They do not trigger alerts, so for construction the letting schedule stays the primary source. See how firms prepare.
Liquidated damages
The daily amount set in a contract that the DOT deducts from the contract price to cover its added costs when the contractor does not finish within the contract time (23 CFR 635.102). The term can also mean the total of those daily deductions on a contract.
On federal-aid work, each DOT sets its rates, either for each project or as a table by project cost or type, and the rates must at least cover its average daily construction engineering costs. Under the federal rule, the rates are subject to FHWA approval and are reviewed at least every two years. With FHWA concurrence, a DOT may also add other costs of delay, such as road user delay costs, and any incentive or disincentive amounts are shown separately (23 CFR 635.127).
INDOT, for example, deducts the daily sum stated in the proposal or special provisions for each calendar day from April through November that the work stays incomplete after the time allowed. From December through March, it does not deduct them once the project is open for its intended purpose or modified for safe use (INDOT 2026 Standard Specifications, 108.09). See contract time.
Lowest responsive responsible bidder
The bidder with the lowest bid that complies with the bid documents, provided the bidder meets the DOT's criteria for responsibility, meaning it is able to perform the work. Federal-aid construction contracts let by competitive bidding are awarded on this basis (23 CFR 635.114).
Responsiveness is about the bid: whether it follows the bid documents. Responsibility is about the bidder: whether it is qualified and able to perform, under criteria the DOT sets through its approved qualification procedures (23 CFR 635.110). On federal-aid work, a DOT that finds the low bidder not responsive or not responsible needs FHWA concurrence before awarding to the next bidder, and rejecting all bids needs FHWA concurrence and an adequate justification (23 CFR 635.114). Where a state has assumed contract award under 23 U.S.C. 106(c), the state gives those approvals itself.
Federal-aid contracts let by competitive bidding also require a sworn non-collusion statement (23 U.S.C. 112(c)). See construction lettings.
Materially unbalanced bid
A bid that is mathematically unbalanced, with item prices that do not reflect reasonable actual costs plus a reasonable share of profit and overhead, in a way that raises reasonable doubt that awarding to it will result in the lowest final cost to the federal government (23 CFR 635.102). A bid that is only mathematically unbalanced, with no such doubt, can still be awarded (23 CFR 635.114).
After bid opening, the DOT compares the low bidder's unit prices with the engineer's estimate. If there are obviously unbalanced items, it documents in writing why it awards or rejects the bid. When a federal-aid bid is both mathematically and materially unbalanced, FHWA can decline to concur in award or limit federal funding (23 CFR 635.102 and 635.114). FHWA's bid analysis guidance also lists unbalancing as a review point.
Notice to proceed
A written notice from the DOT telling the contractor to proceed with the contract work, including, when it applies, the date on which contract time begins (INDOT 2026 Standard Specifications, 101.35 and 108.03). INDOT, for example, expects active work to start within 15 calendar days after the notice, unless the proposal sets a delayed starting date, and does not allow work to begin before the notice.
It is not the same as FHWA's authorization to proceed, which a state needs before work on a federal-aid project starts if the costs are to be eligible (23 CFR 630.106). Where FHWA concurs in a construction award, that concurrence also serves as authorization to begin construction unless it says otherwise (23 CFR 635.114).
Obligation
A promise by the federal government to spend money, made when an agency takes an action that requires it to make a payment, such as signing a contract, awarding a grant or placing an order (USAspending spending guide). An outlay is the later payment of that money, and a de-obligation reduces an obligation, for example to correct an error or when a project costs less than expected.
On USAspending, the value of an award is measured by its obligations and outlays, and an award amount is the running total of obligations over the award's life, not a yearly value. On this site, federal award values are total amounts that can cover several years and many projects (methodology). See federal grants.
In federal grant rules, 2 CFR 200.1 uses the term financial obligations for something different: the orders, contracts and subawards a recipient makes that will require payment.
On-call contract
A contract under which a DOT can call on a firm for work as needs arise over a fixed period, through task or work orders, instead of procuring each job separately. For federal-aid consultant work, it is procured by competitive negotiation or small purchase procedures, and it must state a maximum term of no more than five years including extensions, a maximum total amount and the general scope of services (23 CFR 172.9).
When a DOT selects several on-call consultants through qualifications-based selection, the task orders are not competed on cost. They are assigned by further qualifications-based selection among the firms, or on a regional basis, as the solicitation states (23 CFR 172.9). For construction, an on-call contract is a form of ID/IQ contract (23 CFR 635.602).
Because the term and amount are capped, the work goes back out once either limit is reached. See consultant selection.
Period of performance
The time between the start date and the end date of a federal award (2 CFR 200.1). It can include one or more budget periods. Stating it in the award does not commit the agency to fund the award beyond the currently approved budget period.
An approved extension moves the end of the period of performance to the end of the extension, a termination ends it on the date the termination takes effect, and a renewal award starts a new and distinct period (2 CFR 200.309). On this site, federal awards often have no end date and show multi-year totals (methodology). See federal grants.
Prequalification
A DOT's process for rating contractors or consultants before they may bid or be selected. It can rate firms by type of work and, for contractors, by how much work they can carry, known as bidding capacity. On federal-aid construction other than design-build, CM/GC and ID/IQ, prequalification can be a condition of bidding or award only if bidders have enough time between the call for bids and bid opening to obtain a rating (23 CFR 635.110).
On federal-aid work, the DOT's procedures need FHWA approval and may not restrict competition from any responsible contractor, whether or not it is based in the state. FHWA approves limits on how much work a contractor may bid on or be awarded only when they rest on a full and appropriate evaluation of the contractor's capability. Design-build, CM/GC and ID/IQ projects may use the DOT's own bonding, licensing and prequalification procedures, but not an in-state or local preference. On other federal-aid construction, a DOT cannot require a contractor's license before bidding (23 CFR 635.110).
Consultants can be prequalified for general categories of work, but under competitive negotiation the DOT still issues a request for proposals specific to the project, task or service (23 CFR 172.7).
PS&E (plans, specifications and estimate)
The package of plans, specifications and cost estimate that describes a project's location, design and construction requirements and forecasts its cost. On a federal-aid project, FHWA approval of the PS&E, or the state's own approval where it has assumed that role, is needed before the work is advertised for bids, except for ID/IQ projects that follow 23 CFR part 635, subpart F (23 CFR 630.205).
Before construction is authorized, the DOT also certifies that right-of-way, utility, railroad and environmental clearances have been obtained, or that the necessary arrangements have been made (FHWA PS&E page and 23 CFR 635.309). The estimate in the PS&E is the engineer's estimate that bids are later compared against.
Qualifications-based selection (Brooks Act)
The usual method for selecting architectural and engineering consultants on federal-aid highway work, based on the Brooks Act. Firms are evaluated and ranked on published qualifications criteria, and price is not a factor in evaluation, ranking or selection. The agency then negotiates a fair and reasonable fee with the top-ranked firm, and moves to the next firm if they cannot agree.
Under the Brooks Act, the agency publicly announces the work, holds discussions with at least three firms and ranks at least three as most qualified (40 U.S.C. 1101-1104). FHWA's rules add that, except in unusual circumstances, firms get at least 14 calendar days from the date the request for proposals is issued to respond, and that the DOT prepares an independent cost estimate before negotiating (23 CFR 172.7).
Small purchases at or under the federal simplified acquisition threshold, or a lower state threshold, and narrow noncompetitive cases follow other procedures, and state-funded consultant work follows state law. Federal-aid on-call contracts procured by competitive negotiation are selected the same way, and their task orders are not competed on cost (23 CFR 172.9). See consultant selection.
Renewal option
A contract clause that lets the agency extend the contract for a further period, often one year, on the stated terms. In federal procurement an option is a unilateral right of the government, but some state contracts also need the contractor to accept each renewal.
North Carolina, for example, bid its state-funded guardrail and cable rail ID/IQ contract D3POC0247 for one year, March 20, 2026 to March 19, 2027, with up to two more one-year extensions at NCDOT's option and a possible CPI-U price adjustment on renewal. The Engineer gives written notice by December 1 if the contract may be extended, and the contractor must accept or reject in writing by December 15 (NCDOT proposal D3POC0247). Federal-aid ID/IQ terms, extensions included, are capped at five years (23 CFR 635.604).
The remaining option years show the longest a contract can run, not when it will end. Whether a DOT will exercise an option is decided during each term, often by a notice date the contract sets, months before the term ends. See maintenance term contracts.
Solicitation
Any request from a buyer for firms to submit bids, proposals or quotations (FAR 2.101). Sealed bidding uses an invitation for bids, and negotiated procurements use a request for proposals. In design-build, a request for qualifications is the first-phase document used to shortlist teams (23 CFR 636.103), while in simplified federal purchasing a solicitation can ask for a quotation instead of an offer.
On this site, an upcoming solicitation is work a buyer plans to put out to bid, with no vendor yet. On a paid plan, an alert fires when a planned solicitation's expected date comes within its window, as it does for a contract's end date. TxDOT project rows are labeled direct contract, not upcoming solicitation, and do not trigger alerts. See the methodology and how firms prepare.
Stewardship and oversight agreement
The agreement between FHWA and a state DOT that documents which FHWA responsibilities under title 23 the state has assumed and how the federal-aid highway program will be administered in that state (FHWA stewardship and oversight page). It sets which project approvals, such as PS&E approval and concurrence in contract award, the state gives itself.
Under 23 U.S.C. 106(c), a state assumes FHWA's responsibilities for design, plans, specifications, estimates, contract awards and inspection on projects off the National Highway System unless it decides that is not appropriate, and it may assume them on NHS projects unless FHWA decides otherwise. FHWA may not assign them on projects it places in a high-risk category. For CM/GC, the agreement also sets which approvals the state holds (23 CFR 635.506).
In the federal rules, approvals such as authorizing advertisement, concurring in award and concurring in time extensions belong to the FHWA Division Administrator (23 CFR 635.112, 635.114 and 635.121), the chief FHWA official in each state (23 CFR 635.102). FHWA posts each state's agreement on its stewardship page. See construction lettings.
STIP (Statewide Transportation Improvement Program)
A state's prioritized program of transportation projects, covering at least four years, that are to receive federal highway or transit funds. With limited exceptions, a project must be in an approved STIP to receive FHWA or FTA funding.
The STIP includes each metropolitan area's TIP without change once the MPO and the Governor approve it, and it is updated at least every four years. FHWA and FTA treat years beyond the first four as informational. Changes are made by amendment or, for minor ones, by administrative modification (23 CFR 450.104 and 450.218).
Because projects appear in the STIP before they are advertised, it gives an early view of construction likely to be let in the next few years. See construction lettings.
Task order
An order for services placed under an existing contract, such as an on-call or ID/IQ contract (FAR 2.101). The federal-aid highway ID/IQ rules call these work orders and note that agencies may also call them job orders, service orders or task orders. Each one sets the location, timing, scope and pay items for one job (23 CFR 635.602).
The main competition happens when the base contract is procured. Under a federal-aid on-call consultant contract awarded to several firms through qualifications-based selection, task orders are assigned by further qualifications-based selection or by region, not by price (23 CFR 172.9). For federal-aid construction ID/IQ contracts awarded to several contractors under one solicitation, work orders must go on lowest cost or lowest cost plus time, not by rotation (23 CFR 635.604). See consultant selection.
TIP (Transportation Improvement Program)
A prioritized program of transportation projects for a metropolitan area, covering at least four years and updated at least every four years, that the metropolitan planning organization (MPO) develops with the state and transit operators (23 CFR 450.326). It must be consistent with the metropolitan transportation plan, and projects need to be in it to be eligible for federal highway or transit funds (23 CFR 450.104).
Once the MPO and the Governor approve it, the TIP goes into the STIP without change (23 CFR 450.326 and 450.218). For city, county and transit work in a metropolitan area, the MPO's TIP is where planned federally funded projects are listed.
Sources
- 23 CFR 635.112, Advertising for bids and proposals (govinfo, CFR 2025 edition)
- INDOT 2026 Standard Specifications, Section 100
- 23 CFR 635.113, Bid opening and bid tabulations (govinfo, CFR 2025 edition)
- 23 CFR 635.114, Award of contract and concurrence in award (govinfo, CFR 2025 edition)
- 23 U.S.C. 106, Project approval and oversight (govinfo)
- FHWA Construction Program Guide: Buy America
- 23 CFR 635.410, Buy America requirements (govinfo, CFR 2025 edition)
- FHWA: Q&As on the Build America, Buy America Act for federal financial assistance programs (updated January 5, 2026)
- 23 CFR 635.120, Changes and extra work (govinfo, CFR 2025 edition)
- 23 CFR 635.102, Definitions (govinfo, CFR 2025 edition)
- FHWA Construction Program Guide: Contract changes
- 23 CFR 635.502, Definitions (govinfo, CFR 2025 edition)
- 23 U.S.C. 112, Letting of contracts (govinfo)
- 23 CFR 635.506, Project approvals and authorizations (govinfo, CFR 2025 edition)
- 23 CFR 635.121, Contract time and contract time extensions (govinfo, CFR 2025 edition)
- 23 U.S.C. 113, Prevailing rate of wage (govinfo)
- 23 U.S.C. 101, Definitions and declaration of policy (govinfo)
- Form FHWA-1273, Required contract provisions for federal-aid construction contracts (revised June 25, 2026)
- FHWA Construction Program Guide: Davis-Bacon
- 23 CFR 635.604, ID/IQ Requirements (govinfo, CFR 2025 edition)
- 49 CFR 26.5, Definitions (eCFR, current)
- 49 CFR 26.51, What means do recipients use to meet overall goals? (eCFR, current)
- 49 CFR 26.53, What are the good faith efforts procedures recipients follow in situations where there are contract goals? (eCFR, current)
- 49 CFR 26.55, How is DBE participation counted toward goals? (Cornell LII, current)
- 49 CFR 26.111, DBE reevaluation process (Cornell LII, current)
- Federal Register, DBE program final rule, document 2026-19688 (govinfo)
- 23 CFR 172.7, Procurement methods and procedures (govinfo, CFR 2025 edition)
- 23 CFR 636.103, What are the definitions of terms used in this part? (govinfo, CFR 2025 edition)
- 23 CFR 635.104, Method of construction (govinfo, CFR 2025 edition)
- 23 CFR 636.109, How does the NEPA process relate to the design-build procurement process? (govinfo, CFR 2025 edition)
- FHWA Construction Program Guide: Bid analysis and award
- 23 CFR 630.205, Preparation, submission, and approval (govinfo, CFR 2025 edition)
- 23 CFR 630.106, Authorization to proceed (govinfo, CFR 2025 edition)
- FHWA: Stewardship and oversight agreements
- 31 U.S.C. 6304, Using grant agreements (govinfo)
- 31 U.S.C. 6303, Using procurement contracts (govinfo)
- 2 CFR 200.1, Definitions (govinfo, CFR 2025 edition)
- USAspending Federal Spending Guide
- 23 CFR 635.602, Definitions (govinfo, CFR 2025 edition)
- NCDOT: Division 3 proposal D3POC0247 (bids opened February 5, 2026)
- MoDOT Engineering Policy Guide 147.3, Job Order Contracting
- TxDOT: Contract letting
- 23 CFR 635.127, Agreement provisions regarding overruns in contract time (govinfo, CFR 2025 edition)
- 23 CFR 635.110, Licensing and qualification of contractors (govinfo, CFR 2025 edition)
- 23 CFR 172.9, Contracts and administration (govinfo, CFR 2025 edition)
- 2 CFR 200.309, Modifications to Period of Performance (govinfo, CFR 2025 edition)
- 23 CFR 635.309, Authorization (govinfo, CFR 2025 edition)
- FHWA Construction Program Guide: Plans, specifications and estimates
- 40 U.S.C. chapter 11, Selection of architects and engineers (govinfo)
- 23 CFR 172.3, Definitions (govinfo, CFR 2025 edition)
- 48 CFR 2.101, Definitions (FAR) (govinfo, CFR 2025 edition)
- 23 CFR 450.104, Definitions (govinfo, CFR 2025 edition)
- 23 CFR 450.218, Development and content of the statewide transportation improvement program (STIP) (govinfo, CFR 2025 edition)
- 23 CFR 450.326, Development and content of the transportation improvement program (TIP) (govinfo, CFR 2025 edition)