Alaska rail transit contracts
DOTContractAlert tracks 22 rail transit contracts across 1 Alaska DOT region. ALASKA RAILROAD CORPORATION holds the most (19).
Contracts
22
DOT regions
1
Vendors
—
Alaska rail transit contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| Application Purpose: To Fund Preventive Maintenance Keeping Assets In A State Of Good Repair Rail-belt Wide.; Activities Performed: Vehicle Preventive Maintenance Includes Servicing And Fueling (not Fuel Costs) Vehicles Inspection Maintenan | Alaska transit (FTA federal awards) | |
| Application Purpose: To Fund Track Rehabilitation And Preliminary Engineering And Design For Signal LED Light Upgrades.; Activities Performed: Activities To Be Performed Are Track Rehabilitation And Preliminary Engineering And Design For Si | Alaska transit (FTA federal awards) | |
| Application Purpose: Fund Bridge Rehabilitation To Ensure Bridges Are Maintained In A State Of Good Repair System-wide.; Activities Performed: Bridge Rehabilitation And Improvements.; Expected Outcomes: Keep Bridges In State Of Good Repair | Alaska transit (FTA federal awards) | |
| Application Purpose: To Fund Bridge Preliminary Engineering And Design And Passenger Operations Office Renovation.; Activities Performed: Bridge Preliminary Engineering And Design Activities. Renovation Includes New Flooring Paint And Light | Alaska transit (FTA federal awards) | |
| Application Purpose: To Fund Design/engineering And Bridge Replacement And/or Rehabilitation To Ensure Bridges Are Maintained In A State Of Good Repair System-wide.; Activities Performed: Bridge Engineering/design Bridge Rehabilitation Brid | Alaska transit (FTA federal awards) | |
| Application Purpose: To Fund Rehabilitation Projects For Mp 357.1 And Passenger Car Rolling Stock And Upgrade/refresh Network Services And Employee Pc Equipment.; Activities Performed: Track Rehabilitation And Culvert Replacement At Mp 357. | Alaska transit (FTA federal awards) | |
| Application Purpose: To Fund Bridge Replacement At Mp 114.3 Due To Aging.; Activities Performed: Bridge Replacement And Improvements.; Expected Outcomes: Keeping Bridges In State Of Good Repair For Continued Rail Operation.; Intended Benefi | Alaska transit (FTA federal awards) | |
| Application Purpose: To Fund Phase 1 Of Bridge Replacement At Mp 127.5 Due To Aging.; Activities Performed: Procurement Of Steel And Concrete Award Of Contracts And Access Road Creation.; Expected Outcomes: Keeping Bridges In State Of Good | Alaska transit (FTA federal awards) | |
| This Grant Includes $17753762 In FY 2020 Section 5307 Cares Act Funding At 100% Federal Share. This Application Includes $16650563 Allocated To The Anchorage Uza And $1103199 Allocated To The Fairbanks Uza For The Track Rehabilitation Progr | Alaska transit (FTA federal awards) | |
| Application Purpose: Ensure The Track Structure And Commuter Locomotive Fleet Is Maintained In A State Of Good Repair.; Activities Performed: Track Rehabilitation Activities Include Replacing Rail Ties Ballast And Drainage Work. Commuter Lo | Alaska transit (FTA federal awards) |
DOT regions with the most rail transit contracts
Vendors with the most Alaska rail transit contracts
| Vendor | Contracts | Volume |
|---|---|---|
| ALASKA RAILROAD CORPORATION | 19 | $267.3M |
| AK STATE DEPARTMENT OF PUBLIC TRANSPORTATION | 3 | — |