California highway construction contracts
261 contracts tracked across 11 DOT regions.
Contracts
261
DOT regions
11
Distinct vendors
0
DOT regions with the most highway construction contracts
Recent highway construction contracts in California
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| Rte 1 — Construct Viaduct or retaining wall- LONG LEAD — Roadway Protective Betterment | Caltrans District 5 | — | — | 2025-01-01 |
| Rte 395 — Meadow Farms ADA — ADA improvements | Caltrans District 9 | — | — | 2024-01-01 |
| Rte 395 — Virginia Creek Shoulders — Construct Shoulders | Caltrans District 9 | — | — | 2024-01-01 |
| Rte 82 — Roadway rehabilitation (3R) — Roadway rehabilitation | Caltrans District 4 | — | — | 2024-01-01 |
| Rte 15 — RETROFIT POINT OF CONNECTIONS TO RECYCLED WATER — IN CORONA AND NORCO FROM CORONA AVENUE UC TO DETROIT STREET OC | Caltrans District 8 | — | — | 2023-01-01 |
| Rte 395 — Sonora Jct Shoulders — Construct Shoulders | Caltrans District 9 | — | — | 2023-01-01 |
| Rte 80 — From Secret Town OC to Monte Vista OC — Drainage Rehab | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 273 — In Shasta County in Redding from 0.1 mile North of South Redding Underpass to 0.1 mile North of California Street — Improve accessibility for pedestrian and bicycles | Caltrans District 2 | — | — | 2022-01-01 |
| Rte 5 — Rehabilitate Highway Planting and Irrigation — Rehabilitate Highway Planting and Irrigation | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 710 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 80 — Stabilize Cut Slope — Stabilize Cut Slope | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 50 — Drainage Rehabilitation — Drainage Rehabilitation | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 51 — Pave Slopes, roadside paving, relocate facilities, replacement planting — Pave Slopes, roadside paving, relocate facilities, replacement planting | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 405 — 53 1185 San Gabriel River Br 53 1737H San Gabriel River Br Sub scour Mitigation — STRAIN | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 80 — Stabilize Cut Slope — Stabilize Cut Slope | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 405 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 405 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 210 — Upgrade ADA ramps and accessibility — ADA infrastructure | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 164 — Upgrade ADA ramps and accessibility — ADA infrastructure | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 138 — Upgrade ADA ramps and accessibility — ADA infrastructure | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 134 — Upgrade Transportation Management System — Transportation Management System | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 118 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 110 — Widening of Northbound Off-Ramp on Route 110 at Fair Oaks — Widening of Off-Ramp (partnership with the City) | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 110 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 101 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 101 — HUM 101 through Eureka (Wabash to Couplet) — 32 Curb Ramps | Caltrans District 1 | — | — | 2022-01-01 |
| Rte 101 — Storm Water Source Control — Erosion Control | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 133 — Extend the no. 4 lane on southbound SR-133 from SB I-5 connector and add a second lane to NB 405 connector. In the City of Irvine, SB Route 133 between I-405 and I-5 — Operational Improvements | Caltrans District 12 | — | — | 2022-01-01 |
| Rte 80 — Roadway rehabilitation (2R) — Roadway rehabilitation | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 33 — Upgrade ADA ramps and accessibility — ADA infrastructure | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 14 — Protective Betterment, regrade existing slope SB side — Roadway Protective Betterment | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 68 — Provide Accessible Pathway — ADA Compliance | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 10 — Source Control — Erosion Control | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 10 — Source Control — Erosion Control | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 41 — Install Fiber Optic System — Improve Mobility | Caltrans District 6 | — | — | 2022-01-01 |
| Rte 41 — Aux Ln(s) — Add Aux Lanes | Caltrans District 6 | — | — | 2022-01-01 |
| Rte 72 — Upgrade ADA ramps and accessibility — ADA infrastructure | Caltrans District 7 | — | — | 2022-01-01 |
| Rte 80 — PCC Lane Replacement — PCC Lane Replacement | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 49 — Drainage Rehabilitation — Drainage Rehabilitation | Caltrans District 3 | — | — | 2022-01-01 |
| Rte 140 — Pvmt Preservation — Cap M | Caltrans District 10 | — | — | 2022-01-01 |
| Rte 140 — Pvmt Preservation — Cap M | Caltrans District 10 | — | — | 2022-01-01 |
| Rte 4 — Contingency Project: Install Ramp Meters — In San Joaquin County on State Route 4 | Caltrans District 10 | — | — | 2022-01-01 |
| Rte 80 — Rehabilitate Culverts near Fairfield, from Lynch Road to Red Top Road — Drainage System Restoration | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 185 — Upgrade the existing curb ramps and sidewalks on State Route 185 from A Street to Rose Street in the City of Hayward, and from 55th Ave to 50th Ave in the City of Oakland, in Alameda County — ADA pedestrian infrastructure | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 154 — Intersection Improvements — Operational Improvements | Caltrans District 5 | — | — | 2022-01-01 |
| Rte 185 — Upgrade the existing curb ramps and sidewalks on State Route 185 from A Street to Rose Street in the City of Hayward, and from 55th Ave to 50th Ave in the City of Oakland, in Alameda County — ADA pedestrian infrastructure | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 1 — SM-1 Travel Time - Install bluetooth readers and VMSs between I-280 to s/o Half Moon Bay. Modify ATMS. — Transportation Management Services | Caltrans District 4 | — | — | 2022-01-01 |
| Rte 58 — ADA Curb Ramps — Replace curb ramps??¿ | Caltrans District 6 | — | — | 2022-01-01 |
| Rte 204 — ADA Curb Ramps — Replace curb ramps??¿ | Caltrans District 6 | — | — | 2022-01-01 |
| Rte 4 — Upgrade/construct MVP's — Reduce the frequency and duration of highway workers' exposure to traffic | Caltrans District 4 | — | — | 2022-01-01 |