TitleDOT regionVendorValueSolicitation
Rte 1 — Construct Viaduct or retaining wall- LONG LEAD — Roadway Protective BettermentCaltrans District 5——2025-01-01
Rte 395 — Meadow Farms ADA — ADA improvementsCaltrans District 9——2024-01-01
Rte 395 — Virginia Creek Shoulders — Construct ShouldersCaltrans District 9——2024-01-01
Rte 82 — Roadway rehabilitation (3R) — Roadway rehabilitationCaltrans District 4——2024-01-01
Rte 15 — RETROFIT POINT OF CONNECTIONS TO RECYCLED WATER — IN CORONA AND NORCO FROM CORONA AVENUE UC TO DETROIT STREET OCCaltrans District 8——2023-01-01
Rte 395 — Sonora Jct Shoulders — Construct ShouldersCaltrans District 9——2023-01-01
Rte 80 — From Secret Town OC to Monte Vista OC — Drainage RehabCaltrans District 3——2022-01-01
Rte 273 — In Shasta County in Redding from 0.1 mile North of South Redding Underpass to 0.1 mile North of California Street — Improve accessibility for pedestrian and bicyclesCaltrans District 2——2022-01-01
Rte 5 — Rehabilitate Highway Planting and Irrigation — Rehabilitate Highway Planting and IrrigationCaltrans District 3——2022-01-01
Rte 710 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 7——2022-01-01
Rte 80 — Stabilize Cut Slope — Stabilize Cut SlopeCaltrans District 3——2022-01-01
Rte 50 — Drainage Rehabilitation — Drainage RehabilitationCaltrans District 3——2022-01-01
Rte 51 — Pave Slopes, roadside paving, relocate facilities, replacement planting — Pave Slopes, roadside paving, relocate facilities, replacement plantingCaltrans District 3——2022-01-01
Rte 405 — 53 1185 San Gabriel River Br 53 1737H San Gabriel River Br Sub scour Mitigation — STRAINCaltrans District 7——2022-01-01
Rte 80 — Stabilize Cut Slope — Stabilize Cut SlopeCaltrans District 3——2022-01-01
Rte 405 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 7——2022-01-01
Rte 405 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 7——2022-01-01
Rte 210 — Upgrade ADA ramps and accessibility — ADA infrastructureCaltrans District 7——2022-01-01
Rte 164 — Upgrade ADA ramps and accessibility — ADA infrastructureCaltrans District 7——2022-01-01
Rte 138 — Upgrade ADA ramps and accessibility — ADA infrastructureCaltrans District 7——2022-01-01
Rte 134 — Upgrade Transportation Management System — Transportation Management SystemCaltrans District 7——2022-01-01
Rte 118 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 7——2022-01-01
Rte 110 — Widening of Northbound Off-Ramp on Route 110 at Fair Oaks — Widening of Off-Ramp (partnership with the City)Caltrans District 7——2022-01-01
Rte 110 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 7——2022-01-01
Rte 101 — Relocate appurtenances; Add slope/gore & narrow area paving; MVP: Access gates; Access roads; RICS — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 7——2022-01-01
Rte 101 — HUM 101 through Eureka (Wabash to Couplet) — 32 Curb RampsCaltrans District 1——2022-01-01
Rte 101 — Storm Water Source Control — Erosion ControlCaltrans District 7——2022-01-01
Rte 133 — Extend the no. 4 lane on southbound SR-133 from SB I-5 connector and add a second lane to NB 405 connector. In the City of Irvine, SB Route 133 between I-405 and I-5 — Operational ImprovementsCaltrans District 12——2022-01-01
Rte 80 — Roadway rehabilitation (2R) — Roadway rehabilitationCaltrans District 4——2022-01-01
Rte 33 — Upgrade ADA ramps and accessibility — ADA infrastructureCaltrans District 7——2022-01-01
Rte 14 — Protective Betterment, regrade existing slope SB side — Roadway Protective BettermentCaltrans District 7——2022-01-01
Rte 68 — Provide Accessible Pathway — ADA ComplianceCaltrans District 5——2022-01-01
Rte 10 — Source Control — Erosion ControlCaltrans District 7——2022-01-01
Rte 10 — Source Control — Erosion ControlCaltrans District 7——2022-01-01
Rte 41 — Install Fiber Optic System — Improve MobilityCaltrans District 6——2022-01-01
Rte 41 — Aux Ln(s) — Add Aux LanesCaltrans District 6——2022-01-01
Rte 72 — Upgrade ADA ramps and accessibility — ADA infrastructureCaltrans District 7——2022-01-01
Rte 80 — PCC Lane Replacement — PCC Lane ReplacementCaltrans District 3——2022-01-01
Rte 49 — Drainage Rehabilitation — Drainage RehabilitationCaltrans District 3——2022-01-01
Rte 140 — Pvmt Preservation — Cap MCaltrans District 10——2022-01-01
Rte 140 — Pvmt Preservation — Cap MCaltrans District 10——2022-01-01
Rte 4 — Contingency Project: Install Ramp Meters — In San Joaquin County on State Route 4Caltrans District 10——2022-01-01
Rte 80 — Rehabilitate Culverts near Fairfield, from Lynch Road to Red Top Road — Drainage System RestorationCaltrans District 4——2022-01-01
Rte 185 — Upgrade the existing curb ramps and sidewalks on State Route 185 from A Street to Rose Street in the City of Hayward, and from 55th Ave to 50th Ave in the City of Oakland, in Alameda County — ADA pedestrian infrastructureCaltrans District 4——2022-01-01
Rte 154 — Intersection Improvements — Operational ImprovementsCaltrans District 5——2022-01-01
Rte 185 — Upgrade the existing curb ramps and sidewalks on State Route 185 from A Street to Rose Street in the City of Hayward, and from 55th Ave to 50th Ave in the City of Oakland, in Alameda County — ADA pedestrian infrastructureCaltrans District 4——2022-01-01
Rte 1 — SM-1 Travel Time - Install bluetooth readers and VMSs between I-280 to s/o Half Moon Bay. Modify ATMS. — Transportation Management ServicesCaltrans District 4——2022-01-01
Rte 58 — ADA Curb Ramps — Replace curb ramps??¿Caltrans District 6——2022-01-01
Rte 204 — ADA Curb Ramps — Replace curb ramps??¿Caltrans District 6——2022-01-01
Rte 4 — Upgrade/construct MVP's — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01