California safety contracts

345 contracts tracked across 11 DOT regions.

Contracts
345
DOT regions
11
Distinct vendors
0

DOT regions with the most safety contracts

Recent safety contracts in California

TitleDOT regionVendorValueSolicitation
Rte 1 — Shoulder widening, rumble stripe, guardrail upgrades, CURE concepts — Collision Severity ReductionCaltrans District 5——2024-01-01
Rte 299 — In Trinity County near Douglas City from 0.4 mile East of Douglas City Safety Roadside Rest Area to Shasta County line — Stabalize Slope and install STBMP's to reduce sediment and nutrient dischargeCaltrans District 2——2023-01-01
Rte 99 — SRRA Waste & Drinking Water — Improve SafetyCaltrans District 6——2023-01-01
Rte 12 — Widen shoulders and install shoulder rumble strips — Improve safety & reduce accidentsCaltrans District 4——2023-01-01
Rte 101 — Near Fortuna from 0.15 mile north of Van Duzen River Br to 0.02 mile south of the 12th Street OC and from 0.04 mile north of Finch Creek Rd UC to 0.08 mile south of Salmon Ck Br — Roadside Safety ImprovementsCaltrans District 1——2023-01-01
Rte 10 — Replace existing concrete barrier with transition to sign structure pedestal along the Rte 10 and Rte 110 HOT lanes — Reduce severity collisionsCaltrans District 7——2022-01-01
Rte 8 — Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP, gates/fencing — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 11——2022-01-01
Rte 405 — Upgrade guide signs to retro-reflective panels, & replace overhead signs lighting — Upgrade guide signs to current standards, and increase operational safety by improving visibilityCaltrans District 7——2022-01-01
Rte 101 — Roadside safety improvements; Upgrade existing fence to vandal resistant security fence, and install walk gates, vehicle gates and protective window coverings. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 33 — Upgrade Rock Barrier to Standard Concrete Barrier — Reduce severity collisionsCaltrans District 7——2022-01-01
Rte 5 — MBGR Upgrade Rte.5 from Rte. 405 to Rte. 55 — Collision Severity ReductionCaltrans District 12——2022-01-01
Rte 8 — Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP, gates/fencing — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 11——2022-01-01
Rte 80 — Roadside safety improvements; Upgrade existing fence to vandal resistant security fence, and install walk gates, vehicle gates and protective window coverings. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 5 — Relocate facilities away from traffic, construct roadside paving, access gates and trails to improve worker safety. In Anaheim from La Palma Ave to Magnolia Ave — Roadside Safety ImprovementsCaltrans District 12——2022-01-01
Rte 101 — NB On-ramp roadway safety improvements — Market street roadway safety improvementsCaltrans District 5——2022-01-01
Rte 5 — In Tehama County near Red Bluff from Nine Mile Hill overcrossing to Shasta County Line. — Upgrade MBGR and possibly flatten some slopesCaltrans District 2——2022-01-01
Rte 805 — Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP, gates/fencing — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 11——2022-01-01
Rte 99 — Upgrade SRRA waste & drinking water sytems to comply with water quality standards — Improve SafetyCaltrans District 6——2022-01-01
Rte 111 — Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP, gates/fencing — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 11——2022-01-01
Rte 40 — Regrade Median Cross Slope — Collision Severity ReductionCaltrans District 8——2022-01-01
Rte 5 — Relocate facilities away from traffic, construct roadside paving, access gates and trails toimprove worker safety. In Anaheim, Fullerton and Buena Park from Magnolia Ave to Stanton Ave and on Route 91 from Stanton Ave to Brookhurst St (PM 2.8/3.8) — Roadside Safety ImprovementsCaltrans District 12——2022-01-01
Rte 880 — Roadside safety improvements; Pave extended gore and miscellaneous areas, install maintenance vehicle pullouts, and upgrade impact attenuators. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 37 — Roadside safety improvements; Upgrade existing fence to vandal resistant security fence, and install walk gates, vehicle gates and protective window coverings. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 3 — In Siskiyou County in Yreka on route 3 from 0.4 mile North of Laura Lane to Juniper Drive and on route 263 from route 3 to 0.2 mile North of Yreka City Safety Roadside Rest Area. — RehabCaltrans District 2——2022-01-01
Rte 263 — In Siskiyou County in Yreka on route 3 from 0.4 mile North of Laura Lane to Juniper Drive and on route 263 from route 3 to 0.2 mile North of Yreka City Safety Roadside Rest Area. — RehabCaltrans District 2——2022-01-01
Rte 94 — Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP, gates/fencing — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 11——2022-01-01
Rte 29 — Roadside safety improvements; Upgrade existing fence to vandal resistant security fence, and install walk gates, vehicle gates and protective window coverings. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 280 — Roadside paving including extended gore areas, narrow areas and area between shoulder and soundwall. In and near San Jose from Rte. 101 Separation to Rte. 880/17 Separation at various locations. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 140 — Install ADA curb ramps and sidewalk — ADA pedestrian safetyCaltrans District 10——2022-01-01
Rte 132 — Widen asphalt concrete (AC) shoulder, install/upgrade sidewalks, install curb ramps and/or AC level pads — ADA pedestrian safetyCaltrans District 10——2022-01-01
Rte 80 — Replace Guardrail with Concrete Barrier, Relocate Lighting Roadside Paving — Replace Guardrail with Concrete Barrier, Relocate Lighting Roadside PavingCaltrans District 3——2022-01-01
Rte 80 — Construct rockfall wire mesh drapery on slopes, flatten cut slope to 2:1, construct a rockwall barrier. — Reduce Caltrans Maintenance Worker exposure and reduce/stop material entering the traveled way.Caltrans District 3——2022-01-01
Rte 101 — In Humboldt County from 0.30 mile south of the Arcata OH BR 4-79 to 0.as mile south of the Boyd Draw BR 4-85 — Construct GuardrailCaltrans District 1——2022-01-01
Rte 56 — Relocate appurtenances; add concrete barrier/end treatment, slope/gore/narrow area paving, MVP, gates/fencing — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 11——2022-01-01
Rte 101 — Upgrade Metal Beam Guardrail (MBGR) & End Treatments — Reduce severity collisionsCaltrans District 7——2022-01-01
Rte 152 — Roadside safety improvements; Install vegetation control under guard rail and maintenance vehicle pullouts. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 101 — Roadside safety improvements; Upgrade existing fence to vandal resistant security fence, and install walk gates, vehicle gates and protective window coverings. — Reduce the frequency and duration of highway workers' exposure to trafficCaltrans District 4——2022-01-01
Rte 5 — Roadside Safety Improvements — Roadside Safety ImprovementsCaltrans District 10——2021-01-01
Rte 4 — Roadside Safety Improvements — Roadside Safety ImprovementsCaltrans District 10——2021-01-01
Rte 4 — Install/upgrade Metal Beam Guardrail — Collision Severity ReductionCaltrans District 4——2021-01-01
Rte 60 — GORE PAVING & PLACE REMOVABLE EXIT SIGNS — Roadside Preservation/Worker SafetyCaltrans District 8——2021-01-01
Rte 60 — GORE PAVING & PLACE REMOVABLE EXIT SIGNS — Roadside Preservation/Worker SafetyCaltrans District 8——2021-01-01
Rte 40 — Regrade Median Cross Slope — Collision Severity ReductionCaltrans District 8——2021-01-01
Rte 101 — Construct contrasting surface treatment beyond gores, vegetation control under guard rails and maintenance vehicle pullouts. From Alisos Canyon Road to Los Berros Rd — Roadside Safety ImprovementsCaltrans District 5——2021-01-01
Rte 5 — Relocate facilities away from traffic, construct roadside paving, access gates and trails to improve worker safety. In Anaheim from Harbor Blvd to La Palma Ave — Roadside Safety ImprovementsCaltrans District 12——2021-01-01
Rte 198 — Roadside Safety Improvements — Improve SafetyCaltrans District 6——2021-01-01
Rte 65 — Pave narrow and areas beyond the gores; and install maintenance vehicle pullouts — Improve SafetyCaltrans District 6——2021-01-01
Rte 2 — Install and upgrade MBGR — Reduce severity collisionsCaltrans District 7——2021-01-01
Rte 5 — Relocate facilities away from traffic, construct roadside paving, access gates and trails to improve worker safety. In Santa Ana and Anaheim from Santa Ana River to Harbor Blvd. — Roadside Safety ImprovementsCaltrans District 12——2021-01-01
Rte 15 — GORE PAVING & PLACE REMOVABLE EXIT SIGNS — Roadside Preservation/Worker SafetyCaltrans District 8——2021-01-01