California rail track contracts
DOTContractAlert tracks 14 rail track contracts across 1 California DOT region, held by 9 vendors. UNIVERSITY OF CALIFORNIA, SAN DIEGO holds the most (4).
Contracts
14
DOT regions
1
Vendors
9
California rail track contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| The Purpose Of This Requirement Is To Complete Research Conducted On The Project Entitled "non-contact Rail Inspection At Track Speed." Continue The Ongoing Development Of The Non-contact High-speed Rail Inspection Technology That Utilizes | California rail (FRA federal awards) | |
| The Agreement Will Fund Rail Trespass Enforcement Activities To Reduce Trespassing Incidents By Utilizing A Public Safety Engagement Team Railroad Trespasser Reduction Task Force. The Purpose Of This Trespasser Reduction Task Force Is To Pr | California rail (FRA federal awards) | |
| The Contractor Shall Provide The Federal Railroad Administration For For Support, Technical, Oversight, Review, And Monitoring (storm) For RRD-55 West Region. | California rail (FRA federal awards) | |
| The Objective Of The Project Is To Rehabilitate Track, Structures, And Grade Crossings In Ventura County And Northern Los Angeles County On Infrastructure Used By Amtrak Intercity Service, Metrolink Commuter Service, And Freight Service. | California rail (FRA federal awards) | |
| The Project Includes Planning Activities To Study Seven At-grade Crossings Along The Union Pacific Railroad (uprr) Corridor In Madera, California. The Project Will Conduct A Rail Safety Planning Study, Engage Stakeholders, And Perform An Al | California rail (FRA federal awards) | |
| The Objective Of The Burbank Corridor Speed And Safety Improvements Is To Improve Train Control Systems In The Congested Burbank To Los Angeles Segment, Shared By Amtrak, Metrolink, And Uprr, Enhance Safety And Train Throughput At Two Metro | California rail (FRA federal awards) | |
| The Project Will Replace The 109YEAROLD Single Track Wooden Trestle San Dieguito River Railway Bridge. The Replacement Bridge Will Move From A Single Track To A Double Track And Raise The Height Of The Tracks By 8 Feet To Account For Increa | California rail (FRA federal awards) |
DOT regions with the most rail track contracts
Vendors with the most California rail track contracts
| Vendor | Contracts | Volume |
|---|---|---|
| UNIVERSITY OF CALIFORNIA, SAN DIEGO | 4 | $1.0M |
| SOUTHERN CALIFORNIA REGIONAL RAIL AUTHORITY | 2 | — |
| CALIFORNIA PUBLIC UTILITIES COMMISSION | 2 | — |