Rail Track contracts

DOTContractAlert tracks 487 rail track contracts across 47 states, held by 268 vendors. District of Columbia has the most (60). The vendor with the most is ENSCO INC (45).

Contracts
487
States covered
47
Vendors
268

Rail Track contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionStateEnds
The Purpose Of This Requirement Is To Complete Research Conducted On The Project Entitled "non-contact Rail Inspection At Track Speed." Continue The Ongoing Development Of The Non-contact High-speed Rail Inspection Technology That UtilizesCalifornia rail (FRA federal awards)CA
The Objective Of The Project Is To Raise The Loading Capacity Of Railcars On The Maine Northernrailway (mnr) To The Industry Standard Of Class 2 Track (25 Mph) To Match The Recently Completed Track, Yard, Interchange, And Bridge ImprovementMaine rail (FRA federal awards)ME
The Project Will Improve The Safety, Efficiency, And Reliability Of Passenger And Freight Traffic Along The Pnwrc, Avoiding Or Minimizing Service Interruptions Between Mp 24.68 To Mp 25.52 Resulting From Slope Failures (landslides). This PWashington rail (FRA federal awards)WA
Railroad Safety Information Management Support (rsims) Swes Bpa Call Order With A One Year Base Period And Four Option Year Periods. Option Clins Are Subject To The Availability Of Funds.Maryland rail (FRA federal awards)MD
U.s. Department Of Transportation (dot), Federal Railroad Administration (fra), Office Of Acquisition (RAD-30) In Support Of The Office Of Railroad Development (rrd) For A Bpa Order For Support, Technical, Oversight, Review, Monitoring (stoDistrict of Columbia rail (FRA federal awards)DC
The Objective Of This Program Funded Under This Agreement Is To Attract Research Proposals That Are Intended To Improve Safety And Performance In Railroad Systems, Including The Following Areas: Safety, Environmental Impact, Human Factors,District of Columbia rail (FRA federal awards)DC
The Project Funds The Design And Construction Of Supplemental Safety Measures (delineators, Roadway Striping, Raised Pavement Markings, Rail Dynamic Envelopes, And Signage) At Targeted Locations Along 195 Miles Of The Shared-use Florida EasFlorida rail (FRA federal awards)FL
The Purpose Of The Project Is To Rehabilitate The Georgia Southern Mainline To Achieve FRA Class 1 Track Safety Standards. The Project Scope Includes The Installation Of Ties And Resurfacing Across 12.3 Miles Of Rail Line, The Resurfacing OGeorgia rail (FRA federal awards)GA
The Project Will Replace The Railroad Bridge That Stretches Over The Blanchard River, With A Three-span, Through Plate Girder, Ballast Deck Bridge. Maumee Watershed Conversancy District (the Grantee) Will Complete The Following DeliveOhio rail (FRA federal awards)OH
1. The Study Will Analyze All Of The Existing Crossings, Evaluate Alternatives To Improve Safety (including Closure, Grade Separation, And Upgraded Signals And Protective Devices), And Recommend Designs For Safety Improvements With The InteWisconsin rail (FRA federal awards)WI
The Project Was Selected To Study The Feasibility Of Replacing An Existing Highway-rail Grade Crossing Of The Barge Channel Road Uprr Intersection With A Grade-separated Crossing At The Southport River Terminal In Saint Paul, Minnesota.theMinnesota rail (FRA federal awards)MN
This Project Seeks To Enhance Safety And Reduce Delays In Birmingham And Jefferson County Throughimproved Rail Infrastructure And The Elimination Of At-grade Crossings. Key Tasks Include Preliminary Engineering (pe), Which Involves DesigninAlabama rail (FRA federal awards)AL
The Purpose Of The Stephenson County At-grade Rail Crossing Mitigation Plan Is To Evaluate Public At-grade Railroad Crossings In Stephenson County. The Project Will Assess Current Crossing Conditions, Identify Candidates For Grade SeparatioIllinois rail (FRA federal awards)IL
The Purpose Of The Project Is To Address The Long-term Safety And Economic Viability Of The Areas Surrounding Three Railroad Crossings At Hosea Road, Oak And Gloster Road, And Arcado Road. Gwinnett County Will Conduct A Feasibility Study ToGeorgia rail (FRA federal awards)GA
The Award Purpose Is To Improve The Long-term Safety Of ITS Railroad By Reducing Emissions And Improving The Efficiency Of Operation. The Activities To Be Performed Include Re-powering Six Lal Locomotives With Tier 3 Or Higher Technology. ANew York rail (FRA federal awards)NY
This Grant Is In Support Of Oli Administration Of Public Information, Education And Awareness Programs To Help Prevent And Reduce Pedestrian, Motor Vehicle, And Other Accidents, Incidents, Injuries, And Fatalities, And To Improve AwarenessDistrict of Columbia rail (FRA federal awards)DC
The Objective Of The Project Is To Rehabilitate The 9-MILE Ewr Mainline (mp 0 To Mp 9) From The Ns Connection In Elkhart West Intost. Joseph County To FRA Class I Safety Standards. A New Interchange Track Will Provide Additional Siding To AIndiana rail (FRA federal awards)IN
The Navajo Circle Life Safety Grade Separation Planning Project Includes Activities To Evaluate And Recommend Safety Improvements To The Navajo Circle Crossing In Gainesville, Ga. The Project Will Prepare And Assess Various Alternatives ToGeorgia rail (FRA federal awards)GA
1. Award Purpose: The Objective Of The Project Is To Complete A Comprehensive Corridor Study That Identifies The Improvements Necessary To Create A Sealed Corridor Concept Within The City Of Emporia. Planning Activities Undertaken By The StKansas rail (FRA federal awards)KS
This Project Will Perform Environmental Analysis And Preliminary Engineering In Support Of Replacing The 135-YEAR-OLD Through Plate Girder Bridge Over Bartlett Street At Mp 9.21 On The Csx Portsmouth Branch In The City Of Portsmouth, Nh (foNew Hampshire rail (FRA federal awards)NH
The Cedar Rapids Iowa City Railway Co. (crandic) (the Recipient) Is A Classiii Railroad That Provides Last-mile And Switching Services For 17 Customers On Itsline. The Up Overhead Bridge Is The Sole Route Across The Union Pacific (up)mainIowa rail (FRA federal awards)IA
The Powder Springs Dallas Road Corridor Crossing Closure Project Or Project Is A Track 1 Projectplanning Proposal To Examine Closing Three Highway-rail Crossings, Angham Road (719820N), Finch ROAD(719821V), And Huddleston Drive (719822C) IGeorgia rail (FRA federal awards)GA
The Florence Railroad Crossing Safety Improvement Planning Project Is A Planning Initiative That Will Study 33 Railroad Crossings Within City Limits. The Project Will Result In A Publicly Available Action Plan That Will Identify Crossings RSouth Carolina rail (FRA federal awards)SC
This Project Seeks To Perform Construction Activities To Rehabilitate And Upgrade Approximately 5.5 Miles Of Track And Related Infrastructure On The Texas Northwestern Railroads (txnw) Etter Lead Track Operating Between Cactus And Sunray, TTexas rail (FRA federal awards)TX
The Project Is Located Just East Of Plankinton, South Dakota On Property That Is Owned By The Ringneck Western Railroad At The Intersection Of Hwy 281 And Old Hwy 16. The Project Includes An Approximate 989 Locomotive Shop Track, Two TraSouth Dakota rail (FRA federal awards)SD

Rail Track contracts by state

Vendors with the most rail track contracts

VendorContractsVolume
ENSCO INC45$103.3M
SHARMA & ASSOCIATES INC19$7.7M
STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION11$103.5M
TRANSPORTATION TECHNOLOGY CENTER, INC.11$7.9M
NATIONAL RAILROAD PASSENGER CORPORATION10$4.5B
BOOZ ALLEN HAMILTON INC9$23.5M
UNIVERSITY OF SOUTH CAROLINA9$2.5M
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION7$51.4M
RAIL DEVELOPMENT COMMISSION OHIO6$58.2M
GEORGIA DEPARTMENT OF TRANSPORTATION5$17.8M