Florida rail track contracts
DOTContractAlert tracks 25 rail track contracts across 1 Florida DOT region, held by 18 vendors. STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION holds the most (7).
Contracts
25
DOT regions
1
Vendors
18
Florida rail track contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| The Project Funds The Design And Construction Of Supplemental Safety Measures (delineators, Roadway Striping, Raised Pavement Markings, Rail Dynamic Envelopes, And Signage) At Targeted Locations Along 195 Miles Of The Shared-use Florida Eas | Florida rail (FRA federal awards) | |
| The Government Has A Need For Contracted Services Supporting The Automated Track Inspection Program (atip). Atip Provides Guidance And Understanding Regarding On-track Safety Requirements, Geometry Measurement Technology, Operation, And Nat | Florida rail (FRA federal awards) | |
| The Corridor Links Floridas Largest Three Metropolitan Areas (miami, Tampa And Orlando), With Two Potential Alignments. There Are Three Alignments For The Corridor, Which Have The Potential To Be Used Independently Or In Various Combination | Florida rail (FRA federal awards) | |
| The Proposed Corridor Will Connect Several Of Floridas Largest Metropolitan Areas (see Figure 1 Below). There Are Two Alignments For The Corridor, Which Have The Potential To Be Used Independently Or In Various Combinations. One Alignment W | Florida rail (FRA federal awards) | |
| The Proposed Project Involves Project Development, Final Design, And Construction Activities To Replace Ties And Resurface As Necessary Across Approximately 50 Miles Of Track On The Florida Central Railroad And The Florida Midland Railroad. | Florida rail (FRA federal awards) | |
| The Federal Railroad Administration (fra) Seeks The Development Of Testing And Validation Of Mobile Railcar Inspection Portal (mrip). The Scope Of This Effort Involves The Deployment, Operation, And Validation Of A Vendor-owned And Vendor-o | Florida rail (FRA federal awards) | |
| The Purpose Of The Project Is To Improve The Reliability And Enhance The Economic Competitiveness Of Seminole Gulf Railway (sglr)s Freight Operations By Rehabilitating The Most Severely Impaired Segment Of Main Line Trackage Between Arcadia | Florida rail (FRA federal awards) | |
| The Project Will Benefit Broward County And The Entire East Coast Of Florida By Constructing Supplemental Safety Measures At 21 Highway-rail Grade Crossings On The Florida East Coast Railway (fecr) Brightline Florida LLC (brightline) Shared | Florida rail (FRA federal awards) | |
| The Purpose Of The Project Is To Advance A Technology That Will Provide Real-time Alerts And Aggregate Data To Generate Heat-maps Of Trespassing And Potential Collision Events On The Florida East Coast Railroad Right Of Way From Miami To CO | Florida rail (FRA federal awards) |
DOT regions with the most rail track contracts
Vendors with the most Florida rail track contracts
| Vendor | Contracts | Volume |
|---|---|---|
| STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION | 7 | $51.4M |
| CITY OF JACKSONVILLE | 2 | — |