Illinois rail track contracts
DOTContractAlert tracks 34 rail track contracts across 1 Illinois DOT region, held by 10 vendors. SHARMA & ASSOCIATES INC holds the most (18).
Contracts
34
DOT regions
1
Vendors
10
Illinois rail track contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| The Purpose Of The Stephenson County At-grade Rail Crossing Mitigation Plan Is To Evaluate Public At-grade Railroad Crossings In Stephenson County. The Project Will Assess Current Crossing Conditions, Identify Candidates For Grade Separatio | Illinois rail (FRA federal awards) | |
| The Purpose Of This Stand-alone Contract Is To Provide Funding For The Research And Development Of An Innovative Algorithm Development To Identify Derailment Risks Using Rail Profiles And Track Geometry. Once Developed, This Algorithm Will | Illinois rail (FRA federal awards) | |
| Improve Rail Safety By Developing A Framework To Assess The Condition, Stress State, And Risk Associated With Railway Curves. Curves Are Known Locations Of Increased Lateral Track Loading Demands And Are Also Known To Deteriorate Faster Tha | Illinois rail (FRA federal awards) | |
| The Contractor Shall Provide The Federal Railroad Administration By Evaluating The Performance Of Tank Car Gaskets During Derailment Fire In Accordance With Sharma & Associates Inc. Proposal Dated April 14, 2025. | Illinois rail (FRA federal awards) | |
| The Contractor Shall Provide The Federal Railroad Administration By Evaluating The Impact Of Advanced Energy Locomotive Technologies On Train Makeup And Handling Using Simulation Method In Accordance With Sharma & Associates Inc. Proposal D | Illinois rail (FRA federal awards) | |
| The Project Is An Alternatives Analysis For The Bradley Avenue Railroad Crossing In The City Of Champaign, Illinois. The City Will Retain A Consultant To Evaluate Options For Improving Safety And Mobility At This Critical Intersection. The | Illinois rail (FRA federal awards) | |
| The Objective Of The Project Is To Close The Existing Norfolk Southern Railroad Grade Crossing Of Brush College Road (crossing #218516E) And Replace IT With A Grade Separated Crossing To Carry Brush College Road Over The Existing Ns Railway | Illinois rail (FRA federal awards) | |
| The Objective Of The Project Is To Close The Existing Norfolk Southern Railroad Grade Crossing Of Brush Collegeroad (crossing #218516E) And Replace IT With A Grade Separated Crossing To Carry Brush College Road Over Theexisting Ns Railway M | Illinois rail (FRA federal awards) | |
| The Objective Of The Project Is To Increase Freight Capacity And Operating Windowsand Reduce Freight Train Caused Delays And Track Conflicts For Intercity Amtrakpassenger Service At The Dolton Junction Interlocking. To Accomplish Theobjecti | Illinois rail (FRA federal awards) | |
| The Create Project EW3A Is Dedicated To Improving The Efficiency Of A Vital Junction In The Chicago Terminal By Adding Trackcapacity To Alleviate Freight Rail Congestion And Upgrading Signal Systems For Improved Rail Safety And Efficiency. | Illinois rail (FRA federal awards) | |
| The Contractor Shall Provide The Federal Railroad Administration By Developing A New Model To Evaluate The Tank Car Fire Performance In Accordance With Sharma & Associates Inc. Proposal Dated May 12, 2025. | Illinois rail (FRA federal awards) | |
| The Springfield Rail Improvement Project Consists Of A New Grade Separation At North Grand Avenue Between 12TH And 19TH Streets Over The Ns And Im Railroad Tracks Through A New Overpass Over Three At-grade Crossings. The Three At-grade Cro | Illinois rail (FRA federal awards) | |
| The Federal Railroad Administration (fra) Seeks Effort To Provide Timely Technical Support To The Office Of Safety In ITS Role Of Investigating Railroad Incidents As Well As Other Critical Studies Affecting Railroad Operational Safety In Ac | Illinois rail (FRA federal awards) | |
| This Grant Funds Preliminary Engineering, Environmental Review, And Final Design For A Grade Separation Of The Canadian Pacific Railway (cpr) Kansas City Southern (kcs) Tracks In The Village Of Franklin Park, Illinois Between Mannheim Road | Illinois rail (FRA federal awards) |
DOT regions with the most rail track contracts
Vendors with the most Illinois rail track contracts
| Vendor | Contracts | Volume |
|---|---|---|
| SHARMA & ASSOCIATES INC | 18 | $7.7M |
| ILLINOIS DEPARTMENT OF TRANSPORTATION | 4 | $33.8M |
| UNIVERSITY OF ILLINOIS | 3 | $612K |
| CITY OF DECATUR | 2 | — |
| ILLINOIS COMMERCE COMMISSION | 2 | — |