DOTContractAlert tracks 49 bridge contracts across 8 Minnesota DOT regions. MnDOT ATP M has the most contracts in this category (23).
Contracts
49
DOT regions
8
Vendors
—
DOT regions with the most bridge contracts
Upcoming Minnesota bridge solicitations
| Contract | DOT region | Value | Solicitation |
|---|---|---|---|
| Resurface and widen shoulders on Hwy 169 from Mississippi River bridge to Hwy 200 in Hill City and install box culverts | MnDOT ATP 3 | — | |
| Resurface and widen shoulders on Hwy 169 from Mississippi River bridge to Hwy 200 in Hill City and install box culverts | MnDOT ATP 3 | — | |
| Install cable median barrier and guardrail along Hwy 62 from Hwy 13 to Hwy 3 (S Robert St) in Sunfish Lake, West St Paul and Mendota Heights; resurface Hwy 62 and bridges from just west of Hwy 13 to 5th Ave S in Mendota Heights; and on I-49 | MnDOT ATP M | $16.9M | |
| Resurface Hwy 7 from Hwy 29 to 0.5 miles east of CR 15; resurface Hwy 29 from bridge 12016 to east jct of Hwy 7 in Montevideo. | MnDOT ATP 8 | $3.1M | |
| Reconstruct and realign Hwy 47 (St. Francis Blvd NW) from CR 30 (Pleasant St) to just south of McKinley St in Anoka; build bridge at railroad crossing; upgrade trail and sidewalk | MnDOT ATP M | $23.2M | |
| Resurface from I-94 to south of 5th Ave in Pelican Rapids; bridge replacement | MnDOT ATP 4 | $12.0M | |
| Install cable median barrier and guardrail along Hwy 62 from Hwy 13 to Hwy 3 (S Robert St) in Sunfish Lake, West St Paul and Mendota Heights; resurface Hwy 62 and bridges from just west of Hwy 13 to 5th Ave S in Mendota Heights; and on I-49 | MnDOT ATP M | $16.9M | |
| Resurfacing and bike and pedestrian improvements on Highway 43 from Mankato Avenue to end of Wisconsin state line river bridge | MnDOT ATP 6 | $7.1M | |
| Replace Hwy 3 (Robert St) retaining walls from Curtice St to Congress St in St Paul; repair George St bridge | MnDOT ATP M | $25.0M | |
| Resurface Hwy 71 from north end of Redeye River bridge in Sebeka to 3rd St SE in Menahga; reconstruct urban section from 3rd St SE to north end of Blueberry River bridge in Menahga; resurface Hwy 87 from Becker/Wadena County line to Fir Ave | MnDOT ATP 3 | $15.2M | |
| Resurface Hwy 71 from north end of Redeye River bridge in Sebeka to 3rd St SE in Menahga; reconstruct urban section from 3rd St SE to north end of Blueberry River bridge in Menahga; resurface Hwy 87 from Becker/Wadena County line to Fir Ave | MnDOT ATP 3 | $15.2M | |
| Resurface Hwy 169 from a half mile west of CR 15 (Marystown Rd) to the south end of the Minnesota River bridge; and Hwy 101 from Hwy 169 to a half mile west of the flyover ramp in Shakopee | MnDOT ATP M | $52.2M | |
| Reconstruct Hwy 61/Vermillion St from south of 36th St to 4th St in Hastings; add roundabouts; improve frontage roads; update sidewalks and pedestrian bridge connections; update signals; improve accessibility (ADA) | MnDOT ATP M | $34.0M | |
| Reconstruct Hwy 71 from I-94 to north Sauk Centre, including bridge over Sauk River and urban section | MnDOT ATP 3 | $26.4M | |
| Construct roundabout at Hwy 52/CR 26 (70th St E) off ramp in Inver Grove Heights; improve accessibility (ADA); resurface 70th St E bridge (No. 19022) | MnDOT ATP M | $7.8M | |
| Construct auxiliary lane on northbound I-35W/eastbound I-94 in Mpls, update guardrail for bridge | MnDOT ATP M | $2.4M | |
| Resurface Hwy 7 from Hwy 29 to 0.5 miles east of CR 15; resurface Hwy 29 from bridge 12016 to east jct of Hwy 7 in Montevideo. | MnDOT ATP 8 | $3.1M | |
| Resurface Hwy 11 in Warroad from Elk Street to Warroad River bridge | MnDOT ATP 2 | $3.2M | |
| Resurface Hwy 169 from a half mile west of CR 15 (Marystown Rd) to the south end of the Minnesota River bridge; and Hwy 101 from Hwy 169 to a half mile west of the flyover ramp in Shakopee | MnDOT ATP M | $52.2M | |
| Resurface Hwy 5 (W 7th St) from Munster Ave to east of St Clair Ave in St Paul; improve accessibility (ADA); upgrade lighting; replace traffic signals; upgrade retaining wall; improve pedestrian crossing and drainage; upgrade bridge over 35 | MnDOT ATP M | $27.1M | |
| Resurface Hwy 23 from Hwy 15 to railroad bridge near Hwy 10 in St. Cloud | MnDOT ATP 3 | $14.2M | |
| Resurface Hwy 100 from under ped bridge/exit Cedar Lake Rd in St Louis Park to Jct I-694 in Brooklyn Center | MnDOT ATP M | $53.6M | |
| Resurface I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 | MnDOT ATP 1 | $2.0M | |
| Resurface Hwy 7 from Hennepin County/Carver County line to just east of Division St.; replace Mill St bridge | MnDOT ATP M | $44.5M | |
| Resurface Hwy 55 (Olson Memorial Hwy) from just west of BNSF railroad bridge in Golden Valley to Oak Lake Ave intersection in Mpls, update sidewalk, improve accessibility (ADA) and replace signals; reconstruct bridge over I-94; replace brid | MnDOT ATP M | $22.1M |
Recent bridge contracts in Minnesota
Listed by solicitation date, with a value once the contract has ended. The vendor and source record, where the record has them, are in the paid plans from 18 months before a contract ends.
| Contract | DOT region | Value | Solicitation |
|---|---|---|---|
| Reconstruct Hwy 47 (University Ave SE) from Hwy 65 (Central Ave NE) to 27th Ave NE in Mpls; update signals, lighting, signs and trail; improve accessibility (ADA); replace railing on bridge over railroad track (No. 27134) | MnDOT ATP M | — | |
| Reconstruct Hwy 47 (University Ave SE) from Hwy 65 (Central Ave NE) to 27th Ave NE in Mpls; update signals, lighting, signs and trail; improve accessibility (ADA); replace railing on bridge over railroad track (No. 27134) | MnDOT ATP M | — | |
| Resurface Hwy 210 from CR 1 south in Pillager to Hwy 10 in Motley, replace bridge and construct roundabout at Hwy 210/CR 1 south | MnDOT ATP 3 | — | |
| Concrete resurface WB I-94 from Lake Latoka Bridge to Hwy 29 near Alexandria | MnDOT ATP 4 | — | |
| Resurface Hwy 6 from bridge over Roosevelt Lake in Outing to Hwy 200 in Remer | MnDOT ATP 3 | — | |
| Construct cross-overs on I-90 for future bridge project | MnDOT ATP 7 | — | |
| Construct pedestrian underpass under Hwy 25 Mississippi River bridge in Monticello | MnDOT ATP 3 | — | |
| Add landscaping along Hwy 61 (Arcade St) from E 7th St to just south of Roselawn Ave in Maplewood, and on Hwy 5 from the east end of the I-94 bridge to Minnehaha Ave in St Paul | MnDOT ATP M | — | |
| Reconstruct Hwy 3 (Robert St) from Haskell St in West St Paul to Kellogg Blvd in St Paul; improve intersections; improve accessibility (ADA); update signals and utilities; repair bridge over railroad tracks (No. 62050) | MnDOT ATP M | — | |
| Resurface Hwy 2, sidewalks and bridge repair over Swan River from just west of CR 73 to just west of CR 74 in Warba | MnDOT ATP 1 | — | |
| In Neilsville on Hwy 75 construct sidewalks from bridge 8682 to south of Co road 1 | MnDOT ATP 2 | — | |
| Add landscaping along Hwy 61 (Arcade St) from E 7th St to just south of Roselawn Ave in Maplewood, and on Hwy 5 from the east end of the I-94 bridge to Minnehaha Ave in St Paul | MnDOT ATP M | — | |
| Resurface Hwy 10 (Point Douglas Dr S) from east of Hwy 61 to the west side of the St. Croix River bridge in Denmark Township | MnDOT ATP M | — | |
| Reconstruct Hwy 62 from 28th Ave to 43rd Ave in Minneapolis; update guardrail, drainage and sidewalk; replace railing and repair Hwy 62/28th Ave bridge | MnDOT ATP M | — | |
| Resurface Hwy 75 from Mustinka River Bridge to south of Hwy 55 | MnDOT ATP 4 | — | |
| Resurface Hwy 210 from CR 1 south in Pillager to Hwy 10 in Motley, replace bridge and construct roundabout at Hwy 210/CR 1 south | MnDOT ATP 3 | — | |
| Reconstruct Hwy 3 (Robert St) from Haskell St in West St Paul to Kellogg Blvd in St Paul; improve intersections; improve accessibility (ADA); update signals and utilities; repair bridge over railroad tracks (No. 62050) | MnDOT ATP M | — | |
| Rehabilitate Veterans Bridge and Reconstruct Ramps and Intersections at the Hwy 169/Belgrade Avenue Interchange | MnDOT ATP 7 | — | |
| Resurface Hwy 210 from east end of bridge over Wing River in Hewitt to south edge of Staples | MnDOT ATP 3 | — | |
| Replace I-35E concrete pavement from north exit of Shepard Rd to Hwy 5 (W 7th St) in St Paul; replace bridge over Shepard Rd; repair bridge over Mississippi; update signals | MnDOT ATP M | — | |
| Reconstruct Hwy 28 from Pomme de Terre Bridge near Morris to Starbuck, replace city utilities and sidewalks in Cyrus | MnDOT ATP 4 | — | |
| Rehabilitate Veterans Bridge and Reconstruct Ramps and Intersections at the Hwy 169/Belgrade Avenue Interchange | MnDOT ATP 7 | — | |
| Resurface Hwy 51 (Snelling Ave N) from the north end of bridge over MN 36 in Roseville to just mile north of Grey Fox Rd in Arden Hills; improve guardrail and accessibility (ADA) | MnDOT ATP M | — |