North Carolina capacity contracts

310 contracts tracked across 6 DOT regions.

Contracts
310
DOT regions
6
Distinct vendors
0

DOT regions with the most capacity contracts

Recent capacity contracts in North Carolina

TitleDOT regionVendorValueSolicitation
Construct right turn lane on SR 1503-N. Main St. and a northbound left turn on US 25 Bus. into Hendersonville High School. Extend sidewalk through the island south of the intersection, provide a pedestrian refuge island and upgrade the pedestrian crosswNCDOT Division 14—$1.2M—
Install right turn lane on SR 1537 (Old Brickyard Road).NCDOT Division 14—$750K—
Restripe NC 141 center turn lane to provide at least 125' of left turn storage into SR 1686 (Access A) and construct a 100' EB turn lane on SR 1686/Access A to provide for a left turn lane and a right tunr lane.NCDOT Division 14—$205K—
Construct right turn lane on SR 1503-N. Main St. and a northbound left turn on US 25 Bus. into Hendersonville High School. Extend sidewalk through the island south of the intersection, provide a pedestrian refuge island and upgrade the pedestrian crosswNCDOT Division 14—$880K—
Construct right turn lane on SR 1503-N. Main St. and a northbound left turn on US 25 Bus. into Hendersonville High School. Extend sidewalk through the island south of the intersection, provide a pedestrian refuge island and upgrade the pedestrian crosswNCDOT Division 14—$1.2M—
Install right turn lane on SR 1537 (Old Brickyard Road).NCDOT Division 14—$750K—
Construct right turn lane on SR 1503-N. Main St. and a northbound left turn on US 25 Bus. into Hendersonville High School. Extend sidewalk through the island south of the intersection, provide a pedestrian refuge island and upgrade the pedestrian crosswNCDOT Division 14—$1.2M—
Increase school driveway radii to better accommodate school buses, extend the existing right turn lane out of the school and resurface the school drive adjacent to the intersection.NCDOT Division 14—$545K—
Install right turn lane on SR 1537 (Old Brickyard Road).NCDOT Division 14—$750K—
Restripe NC 141 center turn lane to provide at least 125' of left turn storage into SR 1686 (Access A) and construct a 100' EB turn lane on SR 1686/Access A to provide for a left turn lane and a right tunr lane.NCDOT Division 14—$205K—
Widen NC 58 to provide a left turn lane into the school facilities.NCDOT Division 2—$160K—
Construct 1,640 feet of dropoff queue on the school property. Remove both existing school driveways from US 13 and provide access to the school via Pine Shoal Drive. Signalize the intersection of US 13/NC 58 and Pine Shoal Drive.NCDOT Division 2—$750K—
Widen NC 58 to provide a left turn lane into the school facilities.NCDOT Division 2—$160K—
Widen NC 58 to provide a left turn lane into the school facilities.NCDOT Division 2—$160K—
(1) Extend the northbound left turn lane on Memorial Drive. (2) Construct a second northbound left turn lane on Memorial Drive.NCDOT Division 2—$750K—
Widen NC 58 to provide a left turn lane into the school facilities.NCDOT Division 2—$160K—
(1) Extend the northbound left turn lane on Memorial Drive. (2) Construct a second northbound left turn lane on Memorial Drive.NCDOT Division 2—$1.2M—
Construct 1,640 feet of dropoff queue on the school property. Remove both existing school driveways from US 13 and provide access to the school via Pine Shoal Drive. Signalize the intersection of US 13/NC 58 and Pine Shoal Drive.NCDOT Division 2—$1.4M—
Signalize intersection with 250' northbound left turn lane with Flashing Yellow Arrow. [Companion to 12-18-215 - set up 1 number under Mobility project.]NCDOT Division 12—$1.1M—
Construct 150 foot NB right turn lane on SR 2439.NCDOT Division 12—$750K—
Signalize intersection with 250' northbound left turn lane with Flashing Yellow Arrow. [Companion to 12-18-215 - set up 1 number under Mobility project.]NCDOT Division 12—$750K—
Construct 150 foot NB right turn lane on SR 2439.NCDOT Division 12—$670K—
Signalize intersection with 250' northbound left turn lane with Flashing Yellow Arrow. [Companion to 12-18-215 - set up 1 number under Mobility project.]NCDOT Division 12—$720K—
Construct 150 foot NB right turn lane on SR 2439.NCDOT Division 12—$750K—
Signalize intersection with 250' northbound left turn lane with Flashing Yellow Arrow. [Companion to 12-18-215 - set up 1 number under Mobility project.]NCDOT Division 12—$1.1M—
Extend existing lane storage along ramp and construct additional left-turn lane on ramp.NCDOT Division 8—$605K—
On-campus improvements to improve pick-up and drop-off operations and queue storage capacity.NCDOT Division 8—$360K—
On-campus improvements to improve pick-up and drop-off operations and queue storage capacity.NCDOT Division 8—$360K—
Extend existing lane storage along ramp and construct additional left-turn lane on ramp.NCDOT Division 8—$605K—
On-campus improvements to improve pick-up and drop-off operations and queue storage capacity.NCDOT Division 8—$360K—
Construct left turn lane with 300 feet of storage on NC 152 side street.NCDOT Division 9—$400K—
Internal campus improvements as identified in Traffic Operations Study SCH-2024-037 to provide approximately 4100 feet of queue storage on campus.NCDOT Division 9———
Construct left turn lane with 300 feet of storage on NC 152 side street.NCDOT Division 9—$365K—
Construct left turn lane with 300 feet of storage on NC 152 side street.NCDOT Division 9—$400K—
Internal campus improvements as identified in Traffic Operations Study SCH-2024-037 to provide approximately 4100 feet of queue storage on campus.NCDOT Division 9—$500K—
Internal campus improvements as identified in Traffic Operations Study SCH-2024-037 to provide approximately 4100 feet of queue storage on campus.NCDOT Division 9—$500K—
Internal campus improvements as identified in Traffic Operations Study SCH-2024-037 to provide approximately 4100 feet of queue storage on campus.NCDOT Division 9—$500K—
Construct left turn lane with 300 feet of storage on NC 152 side street.NCDOT Division 9—$400K—
Construct a new 600' southbound right turn lane on SR 1553.NCDOT Division 4—$917K—
Construct 3,035' of dual lane on-site storage for the Elementary School, 3,900' of dual lane on-site storage for the Middle School, and a 150' right turn lane at the site exit onto NC 50 as shown on Figures 1 and 2 of the MSTA March 8, 2022 study.NCDOT Division 4—$730K—
Construct a new exit from the parent loading bays to SR 1010, allowing the exisitng exit to be utilized for queue stacking inbound.NCDOT Division 4—$113K—
Construct a new 600' southbound right turn lane on SR 1553.NCDOT Division 4—$750K—
Construct an 11-lane stacking area and revise the drop-off/pick-up routing including modification of the parking area in front of the school.NCDOT Division 4—$650K—
Construct a new connection between the north school driveway on SR 1324 (Nor-Am Road) and the west school entrance on SR 1002 to serve as dual stacking lanes. Construct a connection between the east school entrance on SR 1002 and the school bus lot forNCDOT Division 4—$379K—
Construct a double stacking loop from the current school entrance to provide approximately 1,700 feet of additional queue storage. Construct a single lane exit from the drop-off/pick-up area to the existing school bus driveway to separate entering and eNCDOT Division 4—$503K—
Widen parent drop-off lane to two lanes including a new campus entrance, new sidewalk, and signalization of the intersection of SR 1003 and Neuse Parkway adjacent to the south end of campus with pedestrian heads and high visibility crosswalks.NCDOT Division 4—$400K—
Construct 3,920 feet of parental queue storage for the High School. See figure 1 of the MSTA Operations Study, dated 8/27/2024.NCDOT Division 4—$357K—
Construct a new entrance 200' south of the existing school bus driveway, a new triple stacking lane, and sidewalk improvements as shown on Figure 15a of the MSTA/VHB study dated 6/30/2020.NCDOT Division 4—$748K—
Construct a new exit from the parent loading bays to SR 1010, allowing the exisitng exit to be utilized for queue stacking inbound.NCDOT Division 4—$103K—
Increase school driveway radii to better accommodate school buses, extend the existing right turn lane out of the school and resurface the school drive adjacent to the intersection.NCDOT Division 14—$545K—