North Carolina highway construction contracts
181 contracts tracked across 11 DOT regions.
Contracts
181
DOT regions
11
Distinct vendors
0
DOT regions with the most highway construction contracts
Recent highway construction contracts in North Carolina
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| Construct on-campus operational improvements in lieu of more extensive improvements to SR 1422, by add additional in bound lane to pick-up area in lieu of right and left turn lanes on SR 1422. | NCDOT Division 12 | — | $90K | — |
| Install traffic signals at both I-85 ramp terminals. | NCDOT Division 5 | — | $110K | — |
| Install modular mini-roundabout. | NCDOT Division 7 | — | $185K | — |
| Install traffic signals. | NCDOT Division 3 | — | $750K | — |
| Install a roundabout. | NCDOT Division 10 | — | $750K | — |
| Construct right turn lanes on northbound SR 1005 and westbound SR 2006. | NCDOT Division 5 | — | $497K | — |
| Add FYA Protected-Permissive Left turn phase to SR 2670 approaches. Install FYA (Permissive only to FYA Permissive) on SR 2687 approaches. Use bi-modal heads to minimize utility relocation. | NCDOT Division 7 | — | $200K | — |
| Construct modern roundabout. | NCDOT Division 9 | — | $750K | — |
| Construct left turn lanes on Main St., College Rd. | NCDOT Division 5 | — | $850K | — |
| Construct right turn lanes on northbound SR 1005 and westbound SR 2006. | NCDOT Division 5 | — | $1.7M | — |
| Construct on-campus operational improvements in lieu of more extensive improvements to SR 1144, by add additional loop to the end of SR 1853 to increase storage of pick-up line in lieu of right & left turn lanes on SR 1144. | NCDOT Division 12 | — | $50K | — |
| Install a roundabout. | NCDOT Division 10 | — | $1.5M | — |
| Install dual left turn lanes on eastbound US 74 at NC 200. | NCDOT Division 10 | — | $375K | — |
| Install a roundabout | NCDOT Division 10 | — | $740K | — |
| Construct left turn lanes on SR 1306. | NCDOT Division 5 | — | $221K | — |
| Install a roundabout. | NCDOT Division 10 | — | $475K | — |
| Construct four left turn lanes along the approaches to the intersection with 200' of storage in each. | NCDOT Division 10 | — | $750K | — |
| Add APS to 5 signalized intersections in Wake County. | NCDOT Division 5 | — | $155K | — |
| Add APS to 5 signalized intersections in Wake County. | NCDOT Division 5 | — | $155K | — |
| Construct dual left turn lanes on US 15-501 in both directions. | NCDOT Division 8 | — | $715K | — |
| Construct left turn lanes on all four approaches. | NCDOT Division 5 | — | $750K | — |
| Convert both signalized intersections to DLTI (dynamic left turn intersections). | NCDOT Division 5 | — | $195K | — |
| Reduced Conflict Intersection. | NCDOT Division 10 | — | $400K | — |
| Construct left turn lanes on Smithfield Rd. | NCDOT Division 5 | — | $914K | — |
| Construct left turn lanes with 150 feet of full width storage on NC 152 approaches to SR 1002. | NCDOT Division 9 | — | $610K | — |
| Install a total of 4 RTLs at the two roundabout ramp locations | NCDOT Division 10 | — | $740K | — |
| Modified RCI intersection by restricting the lefts out of Junction Rd and constructing U-turn bulbs. | NCDOT Division 5 | — | $500K | — |
| Construct a new 19 space parking lot with pedestrian amenities along with markings and signs. See Figure 21 of MSTA Report dated February 7,2020. | NCDOT Division 3 | — | $245K | — |
| Construct dual left turn lanes on Wilmington Street and Salisbury Street. | NCDOT Division 5 | — | $180K | — |
| Install traffic signals. | NCDOT Division 3 | — | $1.2M | — |
| Construct a RAB. | NCDOT Division 5 | — | $100K | — |
| Construct right turn lanes on both approaches of SR 1815 (Mineral Springs Road). | NCDOT Division 5 | — | $735K | — |
| Construct a new 19 space parking lot with pedestrian amenities along with markings and signs. See Figure 21 of MSTA Report dated February 7,2020. | NCDOT Division 3 | — | $245K | — |
| Allow the dual left turn lanes on US 17 northbound and southbound to run simultaneously by removing a portion of the existing concrete islands on the north, south and east legs of the intersection and re-striping. | NCDOT Division 3 | — | $169K | — |
| Install traffic signals at both I-85 ramp terminals. | NCDOT Division 5 | — | $110K | — |
| Construct left turn lanes on NC 50. | NCDOT Division 5 | — | $311K | — |
| Realign intersection and construct roundabout. | NCDOT Division 13 | — | $750K | — |
| Add APS to 5 signalized intersections in Wake County. | NCDOT Division 5 | — | $155K | — |
| Add APS to 5 signalized intersections in Wake County. | NCDOT Division 5 | — | $155K | — |
| Construct 1400 feet of on-site storage as identified in MTSA review. | NCDOT Division 6 | — | $264K | — |
| Install a roundabout | NCDOT Division 10 | — | $740K | — |
| Construct left turn lanes on NC 8 approaches with 150 feet of storage. Construct left turn lanes on SR 1686 approaches with 300 feet of storage. Mobility project is providing local match for STBG-DA and CMAQ funds. | NCDOT Division 9 | — | $750K | — |
| Improve the internal queuing for parent traffic by constructing a roadway from Chambwood Road. | NCDOT Division 10 | — | $201K | — |
| Construct left turn lanes on NC 50. | NCDOT Division 4 | — | $500K | — |
| Dynamic left turn intersection. | NCDOT Division 5 | — | $55K | — |
| Convert intersection to construct superstreet. | NCDOT Division 5 | — | $350K | — |
| Add a through lane to the eastbound off-ramp so that there would be a eastbound left turnbay, a through lane, and a right turn slip lane along the approach. | NCDOT Division 10 | — | $300K | — |
| Convert the existing driveway into a two-lane entrance (adding ±450' of internal storage) and construct a separate new egress driveway approximately 250' to the north. | NCDOT Division 14 | — | $300K | — |
| Extend the ingress carpool lanes to come off of SR 1945 and run parallel to SR 1736. Will require paving of a portion of SR 1945 (unpaved) from the proposed ingress car pool lanes to SR 1736 (approximately 150 ft). | NCDOT Division 6 | — | $214K | — |
| Construct left turn lanes on SR 1393. | NCDOT Division 5 | — | $420K | — |