North Carolina highway construction contracts

181 contracts tracked across 11 DOT regions.

Contracts
181
DOT regions
11
Distinct vendors
0

DOT regions with the most highway construction contracts

Recent highway construction contracts in North Carolina

TitleDOT regionVendorValueSolicitation
Construct on-campus operational improvements in lieu of more extensive improvements to SR 1422, by add additional in bound lane to pick-up area in lieu of right and left turn lanes on SR 1422.NCDOT Division 12—$90K—
Install traffic signals at both I-85 ramp terminals.NCDOT Division 5—$110K—
Install modular mini-roundabout.NCDOT Division 7—$185K—
Install traffic signals.NCDOT Division 3—$750K—
Install a roundabout.NCDOT Division 10—$750K—
Construct right turn lanes on northbound SR 1005 and westbound SR 2006.NCDOT Division 5—$497K—
Add FYA Protected-Permissive Left turn phase to SR 2670 approaches. Install FYA (Permissive only to FYA Permissive) on SR 2687 approaches. Use bi-modal heads to minimize utility relocation.NCDOT Division 7—$200K—
Construct modern roundabout.NCDOT Division 9—$750K—
Construct left turn lanes on Main St., College Rd.NCDOT Division 5—$850K—
Construct right turn lanes on northbound SR 1005 and westbound SR 2006.NCDOT Division 5—$1.7M—
Construct on-campus operational improvements in lieu of more extensive improvements to SR 1144, by add additional loop to the end of SR 1853 to increase storage of pick-up line in lieu of right & left turn lanes on SR 1144.NCDOT Division 12—$50K—
Install a roundabout.NCDOT Division 10—$1.5M—
Install dual left turn lanes on eastbound US 74 at NC 200.NCDOT Division 10—$375K—
Install a roundaboutNCDOT Division 10—$740K—
Construct left turn lanes on SR 1306.NCDOT Division 5—$221K—
Install a roundabout.NCDOT Division 10—$475K—
Construct four left turn lanes along the approaches to the intersection with 200' of storage in each.NCDOT Division 10—$750K—
Add APS to 5 signalized intersections in Wake County.NCDOT Division 5—$155K—
Add APS to 5 signalized intersections in Wake County.NCDOT Division 5—$155K—
Construct dual left turn lanes on US 15-501 in both directions.NCDOT Division 8—$715K—
Construct left turn lanes on all four approaches.NCDOT Division 5—$750K—
Convert both signalized intersections to DLTI (dynamic left turn intersections).NCDOT Division 5—$195K—
Reduced Conflict Intersection.NCDOT Division 10—$400K—
Construct left turn lanes on Smithfield Rd.NCDOT Division 5—$914K—
Construct left turn lanes with 150 feet of full width storage on NC 152 approaches to SR 1002.NCDOT Division 9—$610K—
Install a total of 4 RTLs at the two roundabout ramp locationsNCDOT Division 10—$740K—
Modified RCI intersection by restricting the lefts out of Junction Rd and constructing U-turn bulbs.NCDOT Division 5—$500K—
Construct a new 19 space parking lot with pedestrian amenities along with markings and signs. See Figure 21 of MSTA Report dated February 7,2020.NCDOT Division 3—$245K—
Construct dual left turn lanes on Wilmington Street and Salisbury Street.NCDOT Division 5—$180K—
Install traffic signals.NCDOT Division 3—$1.2M—
Construct a RAB.NCDOT Division 5—$100K—
Construct right turn lanes on both approaches of SR 1815 (Mineral Springs Road).NCDOT Division 5—$735K—
Construct a new 19 space parking lot with pedestrian amenities along with markings and signs. See Figure 21 of MSTA Report dated February 7,2020.NCDOT Division 3—$245K—
Allow the dual left turn lanes on US 17 northbound and southbound to run simultaneously by removing a portion of the existing concrete islands on the north, south and east legs of the intersection and re-striping.NCDOT Division 3—$169K—
Install traffic signals at both I-85 ramp terminals.NCDOT Division 5—$110K—
Construct left turn lanes on NC 50.NCDOT Division 5—$311K—
Realign intersection and construct roundabout.NCDOT Division 13—$750K—
Add APS to 5 signalized intersections in Wake County.NCDOT Division 5—$155K—
Add APS to 5 signalized intersections in Wake County.NCDOT Division 5—$155K—
Construct 1400 feet of on-site storage as identified in MTSA review.NCDOT Division 6—$264K—
Install a roundaboutNCDOT Division 10—$740K—
Construct left turn lanes on NC 8 approaches with 150 feet of storage. Construct left turn lanes on SR 1686 approaches with 300 feet of storage. Mobility project is providing local match for STBG-DA and CMAQ funds.NCDOT Division 9—$750K—
Improve the internal queuing for parent traffic by constructing a roadway from Chambwood Road.NCDOT Division 10—$201K—
Construct left turn lanes on NC 50.NCDOT Division 4—$500K—
Dynamic left turn intersection.NCDOT Division 5—$55K—
Convert intersection to construct superstreet.NCDOT Division 5—$350K—
Add a through lane to the eastbound off-ramp so that there would be a eastbound left turnbay, a through lane, and a right turn slip lane along the approach.NCDOT Division 10—$300K—
Convert the existing driveway into a two-lane entrance (adding ±450' of internal storage) and construct a separate new egress driveway approximately 250' to the north.NCDOT Division 14—$300K—
Extend the ingress carpool lanes to come off of SR 1945 and run parallel to SR 1736. Will require paving of a portion of SR 1945 (unpaved) from the proposed ingress car pool lanes to SR 1736 (approximately 150 ft).NCDOT Division 6—$214K—
Construct left turn lanes on SR 1393.NCDOT Division 5—$420K—