North Carolina transit ferry contracts
2 contracts tracked across 1 DOT region.
Contracts
2
DOT regions
1
Distinct vendors
1
DOT regions with the most transit ferry contracts
Top vendors in North Carolina transit ferry
| Vendor | Contracts | Volume |
|---|---|---|
| NORTH CAROLINA DEPARTMENT OF TRANSPORTATION | 2 | $1.7M |
Recent transit ferry contracts in North Carolina
| Title | DOT region | Vendor | Value | Solicitation |
|---|---|---|---|---|
| APPLICATION PURPOSE: THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION FERRY DIVISION WILL RECEIVE FUNDING THROUGH AN FY 22 RURAL FERRY DISCRETIONARY GRANT TO MODERNIZE THE NCDOT MANNS HARBOR SHIPYARD PAINT FACILITY INCREASING SAFETY AND BRINGING IT UP TO A STATE OF GOOD REPAIR.; ACTIVITIES PERFORMED: FUNDING FROM THIS RURAL FERRY DISCRETIONARY GRANT WILL MODERNIZATION WORK AT THE SHIPYARD BUILT IN THE 1960S WILL INCLUDE REPLACING INTERIOR LIGHTING WITH LED INSTALLING EXPLOSION-PROOF LIGHTING AND USING FIRE-RETARDANT PAINT TO INCREASE EFFICIENCY AND PROVIDE A SAFE WORKING ENVIRONMENT.; EXPECTED OUTCOMES: THIS PROJECT WOULD INVOLVE TWO TASKS INCLUDING REPLACING THE INTERIOR LIGHTING WITH LED LIGHTING AND REPAINTING THE EXPOSED STRUCTURAL STEEL BEAMS WITH FIRE-RETARDANT PAINT AT THE SHIPYARDS PAINT FACILITY TO REHABILITATE THE EXISTING FACILITIES INCREASE EFFICIENCY AND LOWER COST AND PROVIDE A SAFE WORKING ENVIRONMENT.; INTENDED BENEFICIARIES: NCDOT FERRY DIVISION OWNS AND OPERATES MANNS HARBOR SHIPYARD THAT PROVIDES ON-SITE MAINTENANCE AND REPAIR TO VESSELS. FUNDING FROM THIS GRANT WILL BE USED TO MAINTAIN A STATE OF GOOD REPAIR.; SUBRECIPIENT ACTIVITIES: NONE | North Carolina transit (FTA federal awards) | NORTH CAROLINA DEPARTMENT OF TRANSPORTATION | $1.3M | — |
| APPLICATION PURPOSE: THIS PROJECT WILL CONDUCT A PLANNING STUDY INCLUDING CONCEPTUAL DESIGN FOR A DEPOT LEVEL MAINTENANCE FACILITY AT THE EXISTING CHERRY BRANCH FERRY TERMINAL. THIS DEPOT LEVEL FACILITY WOULD REPLACE THE EXISTING BUILDING WITH A LARGER MORE EQUIPPED BUILDING AND DOCKING AREA THAT WOULD PROVIDE AN ALTERNATE LOCATION TO PERFORM IN-WATER MAINTENANCE TO THE VESSELS.; ACTIVITIES PERFORMED: THIS PROJECT WILL CONDUCT A PLANNING STUDY INCLUDING CONCEPTUAL DESIGN FOR A DEPOT LEVEL MAINTENANCE FACILITY AT THE EXISTING CHERRY BRANCH FERRY TERMINAL.; EXPECTED OUTCOMES: THIS PROJECT WILL CREATE A PLAN THAT WILL ALLOW FOR TIMELY MAINTENANCE AND CONTINUED REHABILITATION OF THE FLEET AIDING IN SYSTEM RESILIENCY. THE SHIPYARD HAS LIMITED SHIPYARD CAPACITY CREATING CHALLENGES IN MEETING THE REQUIRED NEEDS FOR REGULAR MAINTENANCE AND EMERGENCY REPAIRS. THE FERRY DIVISION HAS SEEN A REDUCTION IN QUALIFIED APPLICANTS AND NUMEROUS VACANCIES CONTRIBUTING TO THE CHALLENGES OF KEEPING UP WITH MAINTENANCE REQUIREMENTS IN A TIMELY MANNER. THE EXPECTED BENEFITS OF THIS PROJECT INCLUDE HAVING ACCESS TO A LARGER SKILLED LABOR POOL AS THE AREA ALREADY HAS A LARGE MARINE SUPPORT INDUSTRY INCLUDING 5 SHIPYARD AND REPAIR FACILITIES.; INTENDED BENEFICIARIES: ALL FERRY RIDERS AND EMPLOYEES WITHIN NORTH CAROLINA.; SUBRECIPIENT ACTIVITIES: NONE | North Carolina transit (FTA federal awards) | NORTH CAROLINA DEPARTMENT OF TRANSPORTATION | $400K | — |