Texas rail track contracts
DOTContractAlert tracks 18 rail track contracts across 1 Texas DOT region, held by 15 vendors. SOUTHERN METHODIST UNIVERSITY holds the most (2).
Contracts
18
DOT regions
1
Vendors
15
Texas rail track contracts ending soonest
Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.
| Contract | DOT region | Ends |
|---|---|---|
| This Project Seeks To Perform Construction Activities To Rehabilitate And Upgrade Approximately 5.5 Miles Of Track And Related Infrastructure On The Texas Northwestern Railroads (txnw) Etter Lead Track Operating Between Cactus And Sunray, T | Texas rail (FRA federal awards) | |
| This Agreement Funds The Grantee, Blacklands Railroad, Inc., To (1) Refurbish The Main Track (2) Construct Three Interchange Sidings (drop-and-pull) At Overton, Tx (3) Construct One Unit Train Siding At Henderson, Tx And (4) Purchase Ope | Texas rail (FRA federal awards) | |
| The Objective Of The Project Is To Replace The Walnut Creek Bridge To Improve Reliability And Safety On Capmetro S Railroad, As Well As Continue To Provide Opportunity For Lower Transportation Costs For The Railroad Operator S Shippers And | Texas rail (FRA federal awards) | |
| Update And Development Of A Parametric Capacity Tool. A Parametric Railroad Capacity Model Is A High-level Sketch Planning Tool To Assess Potential Infrastructure Needs Of A Railroad Corridor Under Differing Infrastructure Configurations An | Texas rail (FRA federal awards) | |
| The Project Is A Planning Study For The Copperas Cove Railroad Flyover Project, Which Will Improve The Safety And Mobility Of People And Goods Across An Existing At-grade Highway-rail Crossing In The City Of Copperas Cove (city), Texas. The | Texas rail (FRA federal awards) | |
| This Project Will Comprehensively Assess The Train Impacts On Mobility And Quality Of Life For The Neighborhoods In The East End Triangle. IT Will, 1) Comprehensively Study Railroad Impacts On Access And Quality Of Life, Focusing On Road An | Texas rail (FRA federal awards) | |
| The Contractor Shall Provide The Federal Railroad Administration With Fuse Data From Multiple Track Measurement Modalities Into Synchronized Streams For Unified Spatial And Temporal Monitoring, Enabling Targeted Detection Of Anomalies To Im | Texas rail (FRA federal awards) | |
| The Projects Objective Is To Restore The Line To A Dependable And Viable Short Line Capable Of Providing And Improving Freight Rail Service For Customers Along The Neches Subdivision. The Terr Cannot Provide Adequate Freight Rail Service Al | Texas rail (FRA federal awards) | |
| The Objective Of This Contract Is To Conduct Research For The Federal Railroad Administration (fra) Aims To Investigate Extreme Weather Events, Particularly Flooding Associated With Intense Precipitation, Storm Surge, Waves, Sea Level Rise, | Texas rail (FRA federal awards) | |
| This Project Seeks To Perform Preliminary Engineering, Nepa And Final Design Activities Necessary To Eliminate An At-grade Crossing Where Rittiman Road And Union Pacific's Rail Line Intersect And To Build A Four-lane Grade Separation Overpa | Texas rail (FRA federal awards) | |
| This Project Funds The Recipients Planning And Project Development Activities To Move Towards The Elimination Of An At Grade Rail Crossing On Mcintyre Road By Way Of A Grade-separated Crossing Structure To Improve Safety And Connectivity In | Texas rail (FRA federal awards) |
DOT regions with the most rail track contracts
Vendors with the most Texas rail track contracts
| Vendor | Contracts | Volume |
|---|---|---|
| SOUTHERN METHODIST UNIVERSITY | 2 | — |
| ABSG CONSULTING INC | 2 | — |
| TEXAS DEPARTMENT OF TRANSPORTATION | 2 | — |