Wisconsin rail track contracts

DOTContractAlert tracks 4 rail track contracts across 1 Wisconsin DOT region, held by 4 vendors.

Contracts
4
DOT regions
1
Vendors
4

Wisconsin rail track contracts ending soonest

Titles and end dates are public. The incumbent vendor, value and source record, where the record has them, are in the paid plans from 18 months before a contract ends, along with alerts before renewals open.

ContractDOT regionEnds
1. The Study Will Analyze All Of The Existing Crossings, Evaluate Alternatives To Improve Safety (including Closure, Grade Separation, And Upgraded Signals And Protective Devices), And Recommend Designs For Safety Improvements With The InteWisconsin rail (FRA federal awards)
The Purpose Of This Project Is To Conduct Project Development Activities To Grade Separate Walnut Road From The Union Pacific Tracks In Wauwatosa, Wi.this Project Will Conduct Preliminary Engineering And Other Design Disciplines To DeterminWisconsin rail (FRA federal awards)
1. The Primary Objective Of The Project Is To Design A Grade Separation That Spans The Bnsf Rail Yard, Thereby Mitigating The Risk Of Vehicle Train Collisions And Reducing Traffic DELAYS.2. The Project Will Involve A Thorough Evaluation OfWisconsin rail (FRA federal awards)
This Is A Full Life Cycle Project (excluding Pe) That Will Eliminate Two At-grade Crossings, One Vehicle Crossing And One Pedestrian Trail Crossing, At The Intersection Of Galloway Street And Union Pacific Railroad Line In The City Of Eau CWisconsin rail (FRA federal awards)

DOT regions with the most rail track contracts